Monthly State Let Construction Report For Tyler District As Of Jan 16, 2020 Page 1 Of 4

Last Update: Friday, January 17, 2020
FTP Icon
page 1 | page 2 | page 3 | page 4

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyANDERSON ETC
HighwaySH 294 ETC
FromUS 79, E
ToFM 322
CSJ0058-01-019
Proj IDSTP 2020(404)
Work TypeSEAL COAT
 
1.50014050796.690.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days108
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
CDM HOLDINGS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0058-01-019
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12193202
Totals14050796.690.000.000.0

CountyVAN ZANDT ETC
HighwaySH 19 ETC
FromAT FM 1861
ToNEAR HENDERSON C/L
CSJ0108-02-034
Proj IDSTP 1902(030)HES
Work TypeTRAFFIC CONTROL DEVICES
 
3.751508062.500.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-16-19
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days140
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS TRAFFIC CONTROL SYSTEMS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0108-02-034
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06193044
Totals508062.500.000.000.0

CountyANDERSON
HighwayUS 287
FromFM 2419, S
To1.7 MI N OF SH 294 IN ELKHART
CSJ0109-01-062
Proj IDSTP 2019(092)
Work TypeBS RPR,TRT SBGR,ACP BS,OCST,PFC SRF
 
4.0066180316.714238760.5668.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-16-18
Work Began01-07-19
Work Completed
Time Computed00-00-00
Contract Working Days195
Addl Days Granted40
Working Days Charged174
Percent Time Used74
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0109-01-062
CHEROKEE SERVICES (0.15)
FORTSON CONTRACTING, INC. (0.46)
J & M CONTRACTING, COMPANY (9.08)
MURRAY CONSTRUCTION (0.44)
NIXON ENGINEERING (0.43)
PANOLA SIGN & BARRICADE, INC. (0.36)
STRIPING TECHNOLOGY, L.P. (1.32)
WOLFE CONSTRUCTION GROUP, INC. (2.09)
Contract #10183211
Totals6180316.7151576.104238760.5668.5

CountyRUSK ETC
HighwayUS 84 ETC
FromSH 204 IN REKLAW, E
ToFM 225
CSJ0123-04-021
Proj IDSTP 2020(483)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
112.7011024466.950.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days125
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0123-04-021
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01203016
Totals1024466.950.000.000.0

CountyRUSK
HighwayUS 259
From0.4 MI N OF FM 1798, S
To0.2 MI S OF US 84 (GRASS MED), SBL ONLY
CSJ0138-05-057
Proj IDNH 2020(002)
Work TypeREHABILITATION OF EXISTING ROAD
 
7308695.210.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-21-19
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days150
Addl Days Granted0
Working Days Charged11
Percent Time Used7
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0138-05-057
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #09193023
Totals7308695.210.000.000.0

CountyHENDERSON
HighwaySH 31
FromAT HENDERSON CNTY FAIRPARK COMPLEX
To0.7 MI NE OF US175/SL7 IN ATHENS
CSJ0164-01-072
Proj IDNH 2019(089)
Work TypeLANDSCAPE,LIGHTING,PIPE ENTRANCE
 
0.190144985.00139709.8096.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-18-19
Work Began04-22-19
Work Completed
Time Computed00-00-00
Contract Working Days51
Addl Days Granted0
Working Days Charged47
Percent Time Used92
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0164-01-072
TX DOWN UNDER CONSTRUCTION, LLC (2.58)
Contract #02193033
Totals144985.003000.00139709.8096.3

CountyHENDERSON
HighwayBS 31-H
FromAT FM 1616 AND ROCKY RIDGE
ToIN ATHENS
CSJ0164-01-073
Proj IDNH 2020(178)
Work TypeTRAFFIC CONTROL DEVICES
 
0.100168079.200.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order12-16-19
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days27
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
STRIPING TECHNOLOGY, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0164-01-073
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #11193023
Totals168079.200.000.000.0

CountyHENDERSON ETC
HighwaySH 31 ETC
From@ FM 315 (BROAD ST.)
ToIN CHANDLER
CSJ0164-03-054
Proj IDSTP 2020(095)HES
Work TypeTRAFFIC CONTROL DEVICES
 
1.1001043571.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-20-19
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days171
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS TRAFFIC CONTROL SYSTEMS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0164-03-054
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10193214
Totals1043571.000.000.000.0

CountySMITH
HighwaySH 31
From@ TOLL 49
To.
CSJ0164-04-159
Proj IDSTP 2020(100)HES
Work TypeTRAFFIC CONTROL DEVICES
 
0.200185057.000.000.0
CountySMITH
HighwayUS 69
From@ ANN CAMPBELL/CR492
To0.45 MI N OF FM 3271
CSJ0190-05-067
Proj IDSTP 2020(101)HES
Work TypeTRAFFIC CONTROL DEVICES
 
0.20089985.250.000.0
CountySMITH
HighwayIH 20
From@ US 69
ToIN LINDALE
CSJ0495-04-074
Proj IDSTP 2020(102)HES
Work TypeTRAFFIC CONTROL DEVICES
 
0.20063040.250.000.0
CountyGREGG
HighwaySH 42
FromAT FM 1252
ToIN KILGORE
CSJ0545-04-050
Proj IDSTP 2020(103)HES
Work TypeTRAFFIC CONTROL DEVICES
 
0.200119398.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-12-19
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days100
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS TRAFFIC CONTROL SYSTEMS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0164-04-159
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10193025
Totals457480.500.000.000.0

CountySMITH
HighwaySH 31
FromSW SL 323 IN TYLER, E
To0.35 MI E OF US271, BROADWAY AVE
CSJ0164-04-160
Proj IDC 164-4-160
Work TypePLNG,PVMT RPR,OCST,PVMT MRKG
 
2.4193587845.303295024.4591.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-16-18
Work Began07-08-19
Work Completed
Time Computed00-00-00
Contract Working Days58
Addl Days Granted0
Working Days Charged45
Percent Time Used77
Contractor(s)
DREWERY CONSTRUCTION COMPANY, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0164-04-160
TEXOP CONSTRUCTION (4.67)
PANOLA SIGN & BARRICADE, INC. (0.32)
STRIPING TECHNOLOGY, L.P. (2.36)
Contract #07183246
Totals3587845.300.003295024.4591.8

CountySMITH
HighwayUS 271
FromFM 16, SW
ToFM 757
CSJ0165-02-064
Proj IDSTP 2019(734)HES
Work TypeIMPROVE GUARDRAIL
 
4.380160223.71131709.8682.2
CountySMITH
HighwayFM 346
FromUS 69
ToFM 756
CSJ0889-04-078
Proj IDSTP 2019(734)HES
Work TypeSAFETY TREATED FIXED OBJECTS
 
3.287638842.58518686.1381.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order05-02-19
Work Began06-27-19
Work Completed
Time Computed00-00-00
Contract Working Days96
Addl Days Granted0
Working Days Charged72
Percent Time Used75
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0165-02-064
TOTAL HIGHWAY MAINTENANCE, LLC (0.89)
ISAACS CONSTRUCTION SERVICES LLC (3.33)
SOUTHWEST ENVIRONMENT SERIVES, LLC (4.16)
MORRIS COUNTY CONTRACTORS, L.L.C. (14.77)
STRIPING TECHNOLOGY, L.P. (0.36)
Contract #04193234
Totals799066.291838.35650395.9981.3

CountyWOOD
HighwayUS 69
FromSH 37 IN MINEOLA, S
To0.6 MI S OF US80 (MCDANIEL ST)
CSJ0190-03-084
Proj IDNH 2020(065)
Work TypeRESTORATION
 
1.3811442127.500.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days86
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0190-03-084
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10193015
Totals1442127.500.000.000.0

CountySMITH
HighwayUS 69
FromAT FM 346, E OF FLINT
To.
CSJ0191-01-063
Proj IDNH 2013(216)
Work TypeGR, STRS, ACP SURF, PVMT MRKG, MBGF
 
0.94816738120.337114275.5942.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-18-18
Work Began10-12-18
Work Completed
Time Computed00-00-00
Contract Working Days430
Addl Days Granted0
Working Days Charged185
Percent Time Used43
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0191-01-063
TOTAL HIGHWAY MAINTENANCE, LLC (0.18)
ISAACS CONSTRUCTION SERVICES, LLC. (2.32)
WOLFE CONSTRUCTION GROUP, INC. (0.95)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (1.33)
TEXOP CONSTRUCTION (0.45)
MORRIS COUNTY CONTRACTORS, LLC (1.40)
STRIPING TECHNOLOGY, L.P. (2.48)
BOWMAN ENGINEERING & CONSULTING, INC. (0.06)
LS HIGHWAY PRODUCTS, INC. (2.80)
SOUTH TEXAS PAINTING COMPANY (0.04)
Contract #08183210
Totals16738120.33416543.527114275.5942.5

CountySMITH
HighwayFM 2493
FromFM 2813 IN GRESHAM, S
ToFM 346 IN FLINT
CSJ0191-03-081
Proj IDSTP 2013(215)
Work TypeGR,FLX BS,ACP,CULV EXT&RPLCMT,SIGNS
 
2.24114458790.483288312.3922.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-17-18
Work Began04-12-19
Work Completed
Time Computed00-00-00
Contract Working Days506
Addl Days Granted0
Working Days Charged150
Percent Time Used29
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0191-03-081
AREA WIDE PROTECTIVE, INC. (0.36)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.43)
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. (21.55)
STRIPING TECHNOLOGY, L.P. (1.95)
TEXAS ORGANIC ENTERPRISES, LTD (3.45)
DUSTROL, INC. (0.68)
MARCOM"S MOWING SERVICE, LLC (0.24)
RELIABLE CONCRETE CUTTING LLC (0.03)
Contract #07183036
Totals14458790.48138270.113288312.3922.0

CountyHENDERSON
HighwayUS 175
FromSH 19/SL 7 IN ATHENS, SE
ToFM 804
CSJ0198-01-031
Proj IDNH 2020(009)
Work TypeREHABILITATION OF EXISTING ROAD
 
4.30112138162.7778189.330.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-21-19
Work Began12-19-19
Work Completed
Time Computed00-00-00
Contract Working Days262
Addl Days Granted0
Working Days Charged4
Percent Time Used1
Contractor(s)
REYNOLDS & KAY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0198-01-031
AREA WIDE PROTECTIVE, INC. (0.18)
A BROTHERS MILLING, LLC (1.55)
MASSEY CONTRACTORS, LLC (3.08)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.42)
SOUTHWEST ENVIRONMENT SERIVES, LLC (1.73)
STRIPING TECHNOLOGY, L.P. (2.04)
TOTAL HIGHWAY MAINTENANCE, LLC (0.05)
Contract #09193207
Totals12138162.7778189.3378189.330.6

CountyHENDERSON
HighwayUS 175
From0.85 MI E OF FM 315, IN POYNOR
ToANDERSON C/L
CSJ0198-02-035
Proj IDC 198-2-35
Work TypeGR,SUB BS,BS,HMAC,DRAIN STRS,SIGNS
 
0.9237052578.987298797.0799.9
CountyANDERSON
HighwayUS 175
From1.9 MI S OF FM 315 (HENDERSON C/L)
To0.5 MI NW OF SH 155 AT FRANKSTON
CSJ0198-03-027
Proj IDNH 1502(561)
Work TypeGR,SUB BS,BS,HMAC,DRAIN STRS,SIGNS
 
3.80420312971.6621098627.8699.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-17-16
Work Began05-04-16
Work Completed
Time Computed00-00-00
Contract Working Days571
Addl Days Granted68
Working Days Charged639
Percent Time Used100
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0198-02-035
STRIPING TECHNOLOGY, L.P. (0.36)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.16)
MARCOM"S MOWING SERVICE, LLC (0.21)
FORTSON CONTRACTING, INC. (0.04)
STRIPING SYSTEMS, INC. (0.00)
FARR FOUNDATION, INC. (0.32)
BIG CREEK CONSTRUCTION, LTD. (27.92)
NIXON ENGINEERING (0.03)
A. L. CONSTRUCTION, LLC (0.25)
KENSAR, LLC (1.84)
WEST TEXAS ROCK RESOURCES, LLC (0.02)
Contract #12153202
Totals27365550.64106607.1628397424.9399.9

CountyCHEROKEE
HighwaySH 204
FromUS 79 IN JACKSONVILLE, SE
ToSH 110
CSJ0198-07-014
Proj IDSTP 1902(166)
Work TypeSP2
 
10.70413705298.2840063.800.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-15-19
Work Began11-20-19
Work Completed
Time Computed00-00-00
Contract Working Days206
Addl Days Granted0
Working Days Charged17
Percent Time Used8
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0198-07-014
PANOLA SIGN & BARRICADE, INC. (0.35)
LONGVIEW BRIDGE AND ROAD, LTD. (12.58)
ISAACS CONSTRUCTION SERVICES LLC (4.37)
SOUTHWEST ENVIRONMENT SERIVES, LLC (3.30)
A R BROTHERS CONSTRUCTION SERVICES, INC. (4.31)
STRIPING TECHNOLOGY, L.P. (1.05)
STRIPE-A-ZONE, INC. (0.15)
MORRIS COUNTY CONTRACTORS, L.L.C. (1.26)
Contract #07193205
Totals13705298.288413.8040063.800.2

CountyCHEROKEE ETC
HighwaySH 204 ETC
FromSL 456 IN JACKSONVILLE, SE
ToSH 110
CSJ0198-07-015
Proj IDSTP 2019(882)HESG
Work TypeSAFETY
 
61.832562313.80528180.8093.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-13-19
Work Began08-05-19
Work Completed
Time Computed00-00-00
Contract Working Days67
Addl Days Granted0
Working Days Charged36
Percent Time Used53
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0198-07-015
BRYDL CONTRACTING, INC. (6.23)
Contract #05193238
Totals562313.800.00528180.8093.9

CountyCHEROKEE
HighwayUS 69
FromNACOGDOCHES ST (0.1 MI S OF US79),S
ToTENA(.1 MI S OF FM768)IN JACK'VILLE
CSJ0199-01-084
Proj IDNH 1902(286)
Work TypePED
 
0.916502100.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-18-19
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days231
Addl Days Granted0
Working Days Charged19
Percent Time Used8
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0199-01-084
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08193034
Totals502100.000.000.000.0

CountyCHEROKEE
HighwayUS 69
From2.0 MI N OF FM 1247,NEAR WELLS,S
To0.9 MI S OF FM 1247 (ANGELINA C/L)
CSJ0199-03-028
Proj IDHP 2013(803)
Work TypeGRDG,STRS,BASE,OCST,SURF,PVT MRKG
 
2.89617687832.8716838600.0695.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-05-16
Work Began01-23-17
Work Completed
Time Computed00-00-00
Contract Working Days350
Addl Days Granted72
Working Days Charged472
Percent Time Used111
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0199-03-028
AMERICAN REMEDIATION OPTIONS, INC. (2.08)
STRIPING TECHNOLOGY, L.P. (0.52)
STRIPING SYSTEMS, INC. (0.00)
TEX OP CONSTRUCTION, LP (1.05)
LUDCO, INC. (1.00)
FLEX SUPPLY, LLC (0.15)
Contract #06163005
Totals17687832.87951392.3716838600.0695.5