Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     297.000 28.40845 3
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     543.000 5.00000 1
1122 2009 ROCK FILTER DAMS (REMOVE) LF     840.000 3.86540 4
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     1,390.000 15.00000 1
1122 2019 CONSTRUCTION EXITS (REMOVE) SY     1,390.000 .50000 1
1122 2024 BACKHOE WORK (EROSION & SEDM CONT) HR     96.000 50.00000 1
1122 2030 CONSTRUCTION PERIMETER FENCE LF     494.000 4.29000 1
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF     11,201.000 1.50000 1
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF     18,463.000 4.30658 9
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF     18,463.000 1.01357 9
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF     11,201.000 .10000 1