AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AMARILLO DISTRICT

Last Update: Monday, March 31, 2014
ITEMS 100 2002 TO 193 2001
Items Items Bid Code Range
0100 - 0193
0216 - 0260
0310 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0712 - 0751
1122 - 1122
3267 - 3271
5369 - 5910
6007 - 6834
8008 - 8948
100 2002 - 193 2001
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     704.200 561.40334 3
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     1.000 1,270.00000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     1.000 2,540.00000 1
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     22.000 71.81818 3
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     25.000 346.40000 2
100 2011 PREPARING ROW (TREE) (24" TO 36" DIA.) EA     5.000 888.00000 3
104 2001 REMOVING CONC (PAV) SY     1,724.000 15.00000 1
104 2009 REMOVING CONC (RIPRAP) SY     1,520.000 18.33816 3
104 2015 REMOVING CONC (SIDEWALKS) SY     156.000 10.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     1,404.000 8.63818 2
104 2022 REMOVING CONC (CURB AND GUTTER) LF     1,108.000 6.60000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     242.000 7.00000 1
105 2091 REMOVING STAB BASE & ASPH PAV (8" - 12") SY     3,807.000 15.00000 1
106 2001 OBLITERATING ABANDONED ROAD STA     4.700 2,000.00000 1
110 2001 EXCAVATION (ROADWAY) CY     182,824.000 6.51158 6
110 2002 EXCAVATION (CHANNEL) CY     3,546.000 10.33029 3
110 2003 EXCAVATION (SPECIAL) CY     172,636.000 2.25542 3
112 2002 SUBGRADE WIDENING (DENS CONT) STA     1,154.020 237.70831 4
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     340,862.000 11.84664 4
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     2,544.000 17.87044 2
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     150,671.000 2.63200 2
134 2001 BACKFILL (TY A) STA     2,006.560 138.03014 4
134 2004 BACKFILL (TY A OR B) STA     1,237.640 110.20584 3
150 2002 BLADING HR     16.000 118.75000 2
161 2008 EROSION CONTROL COMPOST (2") SY     9,174.000 3.00000 1
161 2015 COMPOST MANUF TOPSOIL (BOS OR PB) CY     483.000 42.40000 1
162 2002 BLOCK SODDING SY     1,522.000 7.14507 2
164 2022 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) AC     6.680 2,602.54491 2
164 2024 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) AC     20.540 1,460.00000 1
164 2032 CELL FBR MLCH SEED (TEMP) (COOL) AC     2.300 3,450.00000 1
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     16,812.000 .37059 2
164 2034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC     114.380 583.22504 4
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     176.650 734.24285 3
164 2043 DRILL SEEDING (TEMP) (COOL) SY     2,967.000 .65000 1
164 2044 DRILL SEEDING (TEMP) (COOL) AC     82.330 543.79995 3
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY     13,845.000 .30000 1
164 2053 DRILL SEEDING (TEMP) (WARM OR COOL) AC     228.890 685.15160 4
168 2001 VEGETATIVE WATERING MG     28,078.500 13.40604 11
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     2,049.000 3.15000 1
169 2002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     354.000 5.00000 1
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     220.000 3.00000 1
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     1,248.000 5.29708 3
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     761.000 6.00000 1
169 2007 SOIL RETENTION BLANKETS (CL 2) (TY G) SY     3,623.000 3.50000 1
192 2013 MULCH SY     921.000 7.90000 1
192 2016 PLANT BED PREPARATION SY     921.000 7.90000 1
192 2017 VEGETATION BARRIER SY     921.000 5.25000 1
192 2030 PLANT MATERIAL (3 GAL) (SHRUB) EA     570.000 94.50000 1
193 2001 PLANT MAINTENANCE MO     3.000 2,625.00000 1