AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AMARILLO DISTRICT

Last Update: Thursday, November 20, 2014
ITEMS 100 2002 TO 193 2001
Items Items Bid Code Range
0100 - 0193
0216 - 0260
0310 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0712 - 0751
1122 - 1122
3268 - 3271
5369 - 5419
6007 - 6834
8008 - 8999
100 2002 - 193 2001
Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA 1,258.060 9.43999 3,816.940 76.36178 6
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     1.000 1,270.00000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     1.000 2,540.00000 1
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     6.000 630.00000 1
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     7.000 678.57143 2
104 2001 REMOVING CONC (PAV) SY     2,464.000 15.76331 2
104 2009 REMOVING CONC (RIPRAP) SY     1,214.000 13.05601 2
104 2011 REMOVING CONC (MEDIANS) SY     531.000 15.06591 2
104 2015 REMOVING CONC (SIDEWALKS) SY     610.000 11.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     226.000 15.49115 2
104 2021 REMOVING CONC (CURB) LF     928.000 6.10000 1
104 2022 REMOVING CONC (CURB AND GUTTER) LF     4,904.000 4.68030 3
104 2023 REMOVING CONC (CTB) LF     207.000 20.00000 1
104 2026 REMOVE CONC (GUTTER) LF     18.000 28.75000 1
104 2028 REMOVING CONC (MISC) SY     1,711.000 12.56575 3
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     180.000 15.00000 1
104 2044 REMOVING CONC (FLUME) SY     29.000 47.95000 1
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     2,351.000 7.90000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     960.000 10.60000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     2,466.000 18.38504 2
105 2044 REMOVING STAB BASE AND ASPH PAV (10") SY     6,646.000 9.45000 1
105 2061 REMOV STAB BASE & ASPH PAV (8" - 20") SY     7,584.000 10.50000 1
105 2109 REMOVING STAB BASE & ASPH PAV (19") SY     3,667.000 14.80000 1
106 2001 OBLITERATING ABANDONED ROAD STA     3.700 3,000.00000 1
110 2001 EXCAVATION (ROADWAY) CY     167,446.000 7.30227 5
110 2003 EXCAVATION (SPECIAL) CY     170,274.000 2.03701 2
112 2002 SUBGRADE WIDENING (DENS CONT) STA     34.400 874.88372 2
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     3,413.000 29.15324 2
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     343,503.000 11.91440 4
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     1,127.000 25.00000 1
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     149,963.000 2.55000 1
134 2001 BACKFILL (TY A) STA 1,258.060 192.19000 4,956.150 190.63750 7
134 2004 BACKFILL (TY A OR B) STA     257.500 207.60000 1
150 2002 BLADING HR     509.000 249.21415 3
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     138.000 282.35000 1
161 2015 COMPOST MANUF TOPSOIL (BOS OR PB) CY     483.000 42.40000 1
162 2002 BLOCK SODDING SY     2,308.000 9.15589 3
164 2002 BROADCAST SEED (PERM) (RURAL) (SANDY) AC     46.450 704.45640 2
164 2004 BROADCAST SEED (PERM) (RURAL) (CLAY) AC     8.920 708.75000 1
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     41,614.000 .20000 1
164 2011 BROADCAST SEED (TEMP) (COOL) SY     41,614.000 .20000 1
164 2012 BROADCAST SEED (TEMP) (COOL) AC     56.970 649.14955 3
164 2022 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) AC     .520 5,000.00000 1
164 2024 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) AC     20.540 1,460.00000 1
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     156,391.000 .17000 1
164 2034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC     65.750 547.56700 4
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     177.850 752.90413 4
164 2044 DRILL SEEDING (TEMP) (COOL) AC     36.540 566.83087 2
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY     156,391.000 .15000 1
164 2053 DRILL SEEDING (TEMP) (WARM OR COOL) AC     226.170 703.94239 5
168 2001 VEGETATIVE WATERING MG     32,056.770 13.41493 13
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     2,049.000 3.15000 1
169 2002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     540.000 3.00000 1
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     8,412.000 1.50000 1
169 2005 SOIL RETENTION BLANKETS (CL 2) (TY E) SY     1,107.000 5.00000 1
169 2007 SOIL RETENTION BLANKETS (CL 2) (TY G) SY     6,767.000 3.94138 2
192 2013 MULCH SY     921.000 7.90000 1
192 2016 PLANT BED PREPARATION SY     921.000 7.90000 1
192 2017 VEGETATION BARRIER SY     921.000 5.25000 1
192 2030 PLANT MATERIAL (3 GAL) (SHRUB) EA     570.000 94.50000 1
193 2001 PLANT MAINTENANCE MO     3.000 2,625.00000 1