AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AMARILLO DISTRICT

Last Update: Friday, June 26, 2015
ITEMS 500 2001 TO 560 6006
Items Items Bid Code Range
0100 - 0169
0216 - 0260
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0712 - 0712
1122 - 1122
3006 - 3285
5369 - 5926
6001 - 6834
8251 - 8999
500 2001 - 560 6006
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS     13.000 382,252.62462 13
500 6001 MOBILIZATION LS 3.000 578,000.00000 9.000 650,666.77778 9
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     89.000 6,118.71944 13
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 22.000 44,795.45455 70.000 23,103.62857 9
506 6035 SANDBAGS FOR EROSION CONTROL EA     135.000 10.42222 2
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF     60.000 1.00000 2
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF     60.000 1.00000 2
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 3,090.000 7.19223 5,780.000 7.94135 6
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,090.000 2.54013 5,780.000 2.39550 6
508 2002 CONSTRUCTING DETOURS SY     120.000 225.00000 1
508 6001 CONSTRUCTING DETOURS SY     5,396.000 70.00000 1
512 6017 PORT CTB (DES SOURCE) (F - SHAPE) (TY 1) LF     3,300.000 10.00000 1
512 6029 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     3,300.000 10.00000 1
512 6041 PORT CTB (STKPL) (F - SHAPE) (TY 1) LF     3,300.000 10.00000 1
514 6001 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF     2,355.000 70.00000 1
514 6019 PERM CTB (SGL SLOPE) (TY 1) (42) (HPC) LF     613.000 110.00000 1
529 2001 CONC CURB (TY I) LF     86.000 30.00000 1
529 2002 CONC CURB (TY II) LF     239.000 30.00000 1
529 2003 CONC CURB & GUTTER (TY I) LF     487.000 18.45082 2
529 2004 CONC CURB & GUTTER (TY II) LF     14,395.000 24.47424 3
529 2006 CONC CURB (MONO) (TY II) LF     682.000 16.25000 1
529 2009 CONCRETE CURB (SPECIAL) LF     20.000 93.00000 1
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF     60.000 30.00000 1
529 2017 CONC CURB & GUTTER (VALLEY GUTTER) LF     125.000 99.90000 1
529 2083 CONC CURB & GUTTER (SPANDREL) LF     785.000 22.80000 1
529 6008 CONC CURB & GUTTER (TY II) LF     3,079.000 22.00000 1
529 6013 CONC CURB (SPECIAL) (TYPE II) LF 70.000 50.00000 70.000 50.00000 1
530 2005 INTERSECTIONS (ACP) SY     23,598.000 18.11046 4
530 2010 DRIVEWAYS (CONC) SY     3,640.000 62.80909 3
530 2011 DRIVEWAYS (ACP) SY     6,710.000 23.28794 3
530 2020 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY     368.000 19.00000 1
530 6002 INTERSECTIONS (ACP) SY 97.000 105.00000 97.000 105.00000 1
530 6011 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY 677.000 10.20000 677.000 10.20000 1
531 2004 CONC SIDEWALKS (6") SY     10,609.000 100.00000 1
531 2005 CURB RAMPS (TY 1) EA     5.000 1,650.00000 1
531 2006 CURB RAMPS (TY 2) EA     2.000 2,625.00000 1
531 2007 CURB RAMPS (TY 3) EA     14.000 2,444.00000 2
531 2015 CONC SIDEWALKS (4") SY     4,713.000 66.81963 2
531 2017 CURB RAMPS (TY 21) EA     2.000 3,375.00000 1
531 2034 CONC SIDEWALK (DRAIN) LF     112.000 100.00000 1
531 2038 CONC SIDEWALKS (STEPS) SY     13.000 200.00000 1
531 2054 CURB RAMPS SY     6,799.000 100.00000 1
531 2123 CONC SIDEWALKS (BRIDGE) (SPECIAL) LF     8.000 500.00000 1
531 6004 CURB RAMPS (TY 1) EA     2.000 2,200.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     294,757.000 .14491 2
533 6001 RUMBLE STRIPS (SHOULDER) LF     552,658.000 .20571 4
533 6002 RUMBLE STRIPS (CENTERLINE) LF 90,593.000 .40894 1,410,134.000 .17541 4
536 2002 CONC MEDIAN SY     137.000 193.33942 3
536 2006 CONC MEDIAN (MONO NOSE) SY     18.000 150.00000 1
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     30,266.000 20.59132 8
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     34.000 1,606.98529 6
540 2033 MTL BM GD FN TRANS (TL2) (RND TIM POST) EA     12.000 1,200.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     8.000 1,141.87500 3
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF     100.000 29.90000 2
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF 4,050.000 20.39815 41,475.000 19.45359 6
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 20.000 1,585.00000 26.000 1,588.46154 3
540 6008 MTL BEAM GD FEN TRANS (T101) EA     12.000 1,130.00000 2
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA     65.000 1,002.00000 3
542 2001 REMOVING METAL BEAM GUARD FENCE LF     26,950.000 2.84895 8
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     29.000 131.20690 3
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     8.000 210.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,527.000 3.80223 39,127.000 2.23480 5
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     62.000 173.32258 2
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     138.000 2,431.99275 9
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     99.000 208.48485 6
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 44.000 2,553.18182 109.000 2,466.23853 6
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 8.000 330.00000 70.000 191.22857 3
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     2.000 2,900.00000 1
545 6005 CRASH CUSH ATTEN (REMOVE) EA     3.000 1,500.00000 1
545 6014 CRASH CUSH ATTEN (INSTL) (R) (N) (70) EA     1.000 30,000.00000 1
545 6019 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA     3.000 12,000.00000 1
550 2001 CHAIN LINK FENCE (INSTALL) (6') LF     10.000 25.00000 1
550 2003 CHAIN LINK FENCE (REMOVE) LF     20.000 25.00000 1
560 2013 MAILBOX INSTALL - D (TWG - POST) TY 2 FND EA     2.000 475.00000 1
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     1.000 165.00000 1
560 6004 MAILBOX INSTALL - S (TWG - POST) TY 2 EA 4.000 175.00000 4.000 175.00000 1
560 6006 MAILBOX INSTALL - M (TWG - POST) TY 2 EA 4.000 225.00000 4.000 225.00000 1