Item No Description Units April 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 1.000 420,000.00000 17.000 337,919.65412 17
500 6001 MOBILIZATION LS 2.000 1,025,000.50000 3.000 745,333.66667 3
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 5,000.00000 107.000 7,538.43953 17
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 28.000 6,857.28571 32.000 6,125.12500 3
506 6035 SANDBAGS FOR EROSION CONTROL EA 75.000 8.00000 75.000 8.00000 1
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 50.000 1.00000 60.000 1.00000 2
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 50.000 1.00000 60.000 1.00000 2
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 110.000 12.00000 110.000 12.00000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 110.000 2.00000 110.000 2.00000 1
508 2002 CONSTRUCTING DETOURS SY     17,657.000 19.40681 2
508 6001 CONSTRUCTING DETOURS SY 5,396.000 70.00000 5,396.000 70.00000 1
512 2010 PORT CTB (DES SOURCE) (SAFETY SH) (TY 1) LF     240.000 14.50000 1
512 2019 PORT CTB (MOVE) (SAFETY SH) (TY 1) LF     240.000 14.50000 1
512 2028 PORT CTB (STKPL) (SAFETY SH) (TY 1) LF     240.000 14.50000 1
512 6017 PORT CTB (DES SOURCE) (F - SHAPE) (TY 1) LF 3,300.000 10.00000 3,300.000 10.00000 1
512 6029 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF 3,300.000 10.00000 3,300.000 10.00000 1
512 6041 PORT CTB (STKPL) (F - SHAPE) (TY 1) LF 3,300.000 10.00000 3,300.000 10.00000 1
514 2015 PERM CONC TRF BARR (F - SHAPE) (TY 1) LF     10.000 175.00000 1
514 2017 PERM CONC TRF BARR (F - SHAPE) (TY 3) LF     135.000 175.00000 1
514 6001 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF 2,355.000 70.00000 2,355.000 70.00000 1
514 6019 PERM CTB (SGL SLOPE) (TY 1) (42) (HPC) LF 613.000 110.00000 613.000 110.00000 1
529 2001 CONC CURB (TY I) LF     86.000 30.00000 1
529 2002 CONC CURB (TY II) LF     239.000 30.00000 1
529 2003 CONC CURB & GUTTER (TY I) LF     487.000 18.45082 2
529 2004 CONC CURB & GUTTER (TY II) LF     14,748.000 24.29534 4
529 2006 CONC CURB (MONO) (TY II) LF     682.000 16.25000 1
529 2008 CONC CURB & GUTTER (SPECIAL) LF     614.000 18.00000 1
529 2009 CONCRETE CURB (SPECIAL) LF     20.000 93.00000 1
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF     60.000 30.00000 1
529 2017 CONC CURB & GUTTER (VALLEY GUTTER) LF     125.000 99.90000 1
529 2083 CONC CURB & GUTTER (SPANDREL) LF     785.000 22.80000 1
529 6008 CONC CURB & GUTTER (TY II) LF 3,079.000 22.00000 3,079.000 22.00000 1
530 2005 INTERSECTIONS (ACP) SY     26,505.000 18.30673 5
530 2007 DRIVEWAYS (CONC) EA     5.000 2,925.00000 1
530 2010 DRIVEWAYS (CONC) SY     3,640.000 62.80909 3
530 2011 DRIVEWAYS (ACP) SY     6,710.000 23.28794 3
530 2020 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY     368.000 19.00000 1
531 2004 CONC SIDEWALKS (6") SY     10,609.000 100.00000 1
531 2005 CURB RAMPS (TY 1) EA     20.000 1,257.50000 3
531 2006 CURB RAMPS (TY 2) EA     2.000 2,625.00000 1
531 2007 CURB RAMPS (TY 3) EA     15.000 2,376.06667 3
531 2015 CONC SIDEWALKS (4") SY     6,615.000 60.04912 4
531 2017 CURB RAMPS (TY 21) EA     2.000 3,375.00000 1
531 2034 CONC SIDEWALK (DRAIN) LF     119.000 123.52941 2
531 2038 CONC SIDEWALKS (STEPS) SY     13.000 200.00000 1
531 2054 CURB RAMPS SY     6,799.000 100.00000 1
531 2123 CONC SIDEWALKS (BRIDGE) (SPECIAL) LF     8.000 500.00000 1
531 6004 CURB RAMPS (TY 1) EA 2.000 2,200.00000 2.000 2,200.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     377,618.000 .16577 3
533 6001 RUMBLE STRIPS (SHOULDER) LF 343,020.000 .15500 343,020.000 .15500 1
533 6002 RUMBLE STRIPS (CENTERLINE) LF 1,282,241.000 .15500 1,282,241.000 .15500 1
536 2002 CONC MEDIAN SY     186.000 160.84677 4
536 2006 CONC MEDIAN (MONO NOSE) SY     18.000 150.00000 1
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     30,916.000 20.55787 9
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     34.000 1,606.98529 6
540 2033 MTL BM GD FN TRANS (TL2) (RND TIM POST) EA 12.000 1,200.00000 12.000 1,200.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     11.000 1,075.90909 4
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF     100.000 29.90000 2
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF 3,575.000 21.00000 3,575.000 21.00000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 6.000 1,600.00000 6.000 1,600.00000 1
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 3.000 1,100.00000 3.000 1,100.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     27,138.000 2.84654 9
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     31.000 135.64516 4
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     8.000 210.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF 4,525.000 2.00000 4,525.000 2.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 12.000 2,850.00000 141.000 2,432.37589 10
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     99.000 208.48485 6
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 3.000 2,400.00000 3.000 2,400.00000 1
545 2003 CRASH CUSH ATTEN (REMOVE) EA     2.000 800.00000 1
545 2046 CRASH CUSH ATTEN (INSTAL) (ABSORB 350) EA     1.000 2,500.00000 1
545 2047 CRASH CUSH ATTEN (MOV & RESET) (ABSORB 350 EA     1.000 2,500.00000 1
545 2048 CRASH CUSH ATTEN (REMOVE) (ABSORB 350) EA     1.000 500.00000 1
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 2.000 2,900.00000 2.000 2,900.00000 1
545 6005 CRASH CUSH ATTEN (REMOVE) EA 3.000 1,500.00000 3.000 1,500.00000 1
545 6014 CRASH CUSH ATTEN (INSTL) (R) (N) (70) EA 1.000 30,000.00000 1.000 30,000.00000 1
545 6019 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA 3.000 12,000.00000 3.000 12,000.00000 1
550 2001 CHAIN LINK FENCE (INSTALL) (6') LF     10.000 25.00000 1
550 2003 CHAIN LINK FENCE (REMOVE) LF     20.000 25.00000 1
560 2013 MAILBOX INSTALL - D (TWG - POST) TY 2 FND EA     2.000 475.00000 1
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     1.000 165.00000 1