Item No Description Units Sept 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     1,530.000 23.18301 5
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 380.000 43.48684 917.000 36.28279 7
1122 2003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     92.000 39.44174 2
1122 2009 ROCK FILTER DAMS (REMOVE) LF 380.000 5.19737 2,539.000 7.31581 12
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     281.000 21.83986 2
1122 2019 CONSTRUCTION EXITS (REMOVE) SY     281.000 8.10676 2
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF 2,799.000 3.35086 33,064.000 2.74376 17
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF     392.000 6.73469 2
1122 2049 BIOGRD EROSN CONT LOGS (18" DIA) INSTAL LF     380.000 5.00000 1
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF     772.000 1.72124 3
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF 2,799.000 1.05698 33,064.000 .89370 17