Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     1,350.000 22.67407 4
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     740.000 38.95270 5
1122 2003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     60.000 35.00000 1
1122 2009 ROCK FILTER DAMS (REMOVE) LF     2,150.000 7.37907 9
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     281.000 21.83986 2
1122 2019 CONSTRUCTION EXITS (REMOVE) SY     281.000 8.10676 2
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF     27,024.000 2.84390 15
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF     72.000 10.00000 1
1122 2049 BIOGRD EROSN CONT LOGS (18" DIA) INSTAL LF     380.000 5.00000 1
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF     452.000 1.63717 2
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF     27,024.000 .93603 15