AVERAGE LOW BID UNIT PRICE - MAINTENANCE - AUSTIN DISTRICT
Last Update: Friday, June 7, 2013
| ITEMS 100 2001 TO 169 2001 |
| Item No |
Description |
Units |
May 31, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 100 2001 |
PREPARING ROW |
AC |
|
|
0.080 |
25,000.00000 |
1 |
| 100 2002 |
PREPARING ROW |
STA |
|
|
35.000 |
210.00000 |
1 |
| 104 2009 |
REMOVING CONC (RIPRAP) |
SY |
|
|
1,334.000 |
18.39655 |
5 |
| 110 2001 |
EXCAVATION (ROADWAY) |
CY |
|
|
4,087.000 |
18.87057 |
2 |
| 110 2002 |
EXCAVATION (CHANNEL) |
CY |
|
|
4,146.000 |
7.00000 |
1 |
| 110 2003 |
EXCAVATION (SPECIAL) |
CY |
|
|
255.000 |
11.00000 |
1 |
| 112 2001 |
SUBGRADE WIDENING (ORD COMP) |
STA |
|
|
3.070 |
2,257.85993 |
1 |
| 132 2003 |
EMBANKMENT (FINAL) (ORD COMP) (TY B) |
CY |
|
|
361.000 |
25.00000 |
1 |
| 132 2005 |
EMBANKMENT (FINAL) (ORD COMP) (TY C) |
CY |
|
|
4,129.000 |
6.32696 |
2 |
| 132 2019 |
EMBANKMENT (VEHICLE) (ORD COMP) (TY B) |
CY |
|
|
213.000 |
30.09136 |
2 |
| 132 2021 |
EMBANKMENT (VEHICLE) (ORD COMP) (TY C) |
CY |
|
|
3,752.000 |
29.32836 |
2 |
| 134 2001 |
BACKFILL (TY A) |
STA |
|
|
110.000 |
112.95000 |
1 |
| 134 2002 |
BACKFILL (TY B) |
STA |
|
|
10.000 |
100.00000 |
1 |
| 134 2003 |
BACKFILL (TY C) |
STA |
175.000 |
575.00000 |
350.000 |
575.00000 |
2 |
| 150 2002 |
BLADING |
HR |
16.000 |
100.00000 |
32.000 |
100.00000 |
2 |
| 158 2002 |
SPEC EXCAV WORK (BACKHOE) |
HR |
|
|
80.000 |
15.00000 |
1 |
| 160 2003 |
FURNISHING AND PLACING TOPSOIL (4") |
SY |
70.000 |
2.00000 |
31,193.000 |
0.99590 |
5 |
| 160 2004 |
FURNISHING AND PLACING TOPSOIL (6") |
SY |
|
|
273.000 |
4.38000 |
1 |
| 164 2001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) |
SY |
81.000 |
5.00000 |
162.000 |
5.00000 |
2 |
| 164 2007 |
BROADCAST SEED (PERM) (URBAN) (CLAY) |
SY |
|
|
825.000 |
0.40000 |
1 |
| 164 2009 |
BROADCAST SEED (TEMP) (WARM) |
SY |
|
|
21,716.000 |
0.11760 |
2 |
| 164 2021 |
CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) |
SY |
|
|
14,390.000 |
0.30000 |
1 |
| 164 2065 |
DRILL SEEDING (TEMP) (COOL) (OPT2) |
SY |
|
|
24.000 |
18.00000 |
1 |
| 164 2066 |
DRILL SEEDING (PERM) (WARM OR COOL) |
SY |
|
|
1,084.000 |
5.00000 |
1 |
| 166 2001 |
FERTILIZER |
AC |
|
|
3.500 |
840.00000 |
1 |
| 168 2001 |
VEGETATIVE WATERING |
MG |
1.700 |
350.00000 |
635.200 |
25.31267 |
6 |
| 169 2001 |
SOIL RETENTION BLANKETS (CL 1) (TY A) |
SY |
19,000.000 |
0.90000 |
38,724.000 |
0.93926 |
3 |