Monthly State Let Construction Report For Austin District As Of Jan 11, 2016 Page 1 Of 13

Last Update: Tuesday, January 12, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10 | page 11 | page 12 | page 13

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyWILLIAMSON
Highway IH 35
From 0.710 MI SOUTH OF LAKEWAY DRIVE
To 0.246 MI NORTH OF LAKEWAY DRIVE
CSJ 0015-08-116
Proj ID IM 0353(283)
Work Type REPLACE EXISTING UNDERPASS STRUCTUR
 
1.810 5649298.80 0.00 5855901.31 100.0
CountyWILLIAMSON
Highway IH 35
From AT BI 35M NORTH AND LAKEWAY DR
To .
CSJ 0015-08-126
Proj ID RW 15-8-126
Work Type ROW ACQUISITION, UTIL & RELOC
 
0.001 98041.62 0.00 128151.76 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-05-11
Work Began 11-08-11
Work Completed 09-16-15
Time Computed 10-21-11
Contract Working Days 481
Addl Days Granted 0
Working Days Charged 601
Percent Time Used 124
Contractor(s)
LIBERTY MUTUAL INSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0015-08-116
BEAIRD DRILLING(0.84%)
BMP SPECIALIST, LLC(0.87%)
CERTIFIED PLACERS LLC(1.06%)
EW WELLS GROUP LLC (0.91%)
ENVIRONMENTAL SAFETY SERVICES, INC.(1.04%)
FLASHER EQUIPMENT COMPANY(1.29%)
HIGHWAY TECHNOLOGIES, INC. (1.64%)
J.D. RAMMING PAVING CO., LTD.( 17.37%)
PRIMATE CONSTRUCTION, INC. (0.09%)
SITE-SAFE PRODUCTS OF TEXAS, L.P.(0.18%)
SOUTH TEXAS PAINTING COMPANY (0.13%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (5.68%)
MONTELONGO"S CONCRETE(1.57%)
CHASCO CONSTRUCTORS( 94.71%)
APAC-TEXAS, INC. ( 22.38%)
HAYWARD BAKER, INC.(0.90%)
LINDAMOOD DEMOLITION, INC. (1.75%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.49%)
ROADWAY SPECIALTIES, INC.(0.18%)
Contract # 07113238
Totals 5747340.42 0.00 5984053.07 100.0

CountyWILLIAMSON
Highway IH 35
From S. SAN GABRIEL RIVER
To LAKEWAY DR.
CSJ 0015-08-130
Proj ID NH 2014(707)
Work Type SEAL & THIN OVERLAY
 
3.764 2892292.14 20199.89 2656686.08 91.8
CountyWILLIAMSON
Highway IH 35
From LAKEWAY DR
To BELL COUNTY LINE
CSJ 0015-08-135
Proj ID NH 2014(707)
Work Type OVERLAY NB & SB FRONTAGE ROADS
 
13.352 5104406.48 14810.34 5060745.06 99.8
Work Order 08-27-14
Work Began 09-29-14
Work Completed  
Time Computed 09-12-14
Contract Working Days 79
Addl Days Granted 0
Working Days Charged 111
Percent Time Used 140
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0015-08-135
ALTUS TRAFFIC MANAGEMENT LLC (0.30%)
TRP CONSTRUCTION GROUP, LLC(1.38%)
SERVICELINE TRANSPORT(1.48%)
SCR CONSTRUCTION CO., INC. (1.63%)
TEXAS TRUCKING COMPANY, INC. (2.75%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.03%)
Contract # 06143010
Totals 7996698.62 35010.23 7717431.14 96.9

CountyWILLIAMSON
Highway IH 35
From APPROX 0.1 MI N. OF BUD STOCKTON LP
To APPROX 0.1 MI S. OF BUD STOCKTON LP
CSJ 0015-08-134
Proj ID NH 2014(706)
Work Type REPLACE BRIDGE & APPROACHES
 
0.330 6682824.05 319358.89 6481693.45 96.9
Work Order 08-07-14
Work Began 03-23-15
Work Completed  
Time Computed 08-23-14
Contract Working Days 336
Addl Days Granted 0
Working Days Charged 184
Percent Time Used 54
Contractor(s)
SEMA CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0015-08-134
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (1.78%)
RAMMING PAVING COMPANY ( 19.01%)
ROYAL VISTA INC. (1.88%)
ROADWAY SPECIALTIES, INC.(2.91%)
PERFORMANCE EQUIPMENT SERVICE(0.76%)
HOUSTON SAWING & DRILLING(0.06%)
VOGES DRILLING CO. (0.93%)
FLASHER EQUIPMENT COMPANY(1.69%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.90%)
A & R DEMOLITION (0.61%)
MCL CONTRACTING, LLC (1.25%)
MG DRILLING(0.03%)
Contract # 06143003
Totals 6682824.05 319358.89 6481693.45 96.9

CountyWILLIAMSON
Highway IH 35
From 1310 FT SOUTH OF LAKEWAY DRIVE
To 2250 FT NORTH OF LAKEWAY DRIVE
CSJ 0015-08-137
Proj ID IM 0353(285)
Work Type LANDSCAPING AND IRRIGATION
 
0.815 418380.00 0.00 0.00 100.0
Work Order 09-24-12
Work Began 00-00-00
Work Completed 06-11-15
Time Computed 03-23-13
Contract Working Days 72
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DEANGELO BROTHERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0015-08-137
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08123043
Totals 418380.00 0.00 0.00 100.0

CountyWILLIAMSON
Highway IH 35
From FM 3406
To S. SAN GABRIEL RIVER
CSJ 0015-09-165
Proj ID IM 0353(284)
Work Type PAVEMENT REPAIR AND OVERLAY
 
6.380 3689560.42 0.00 3476132.97 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-16-11
Work Began 07-17-12
Work Completed 01-21-15
Time Computed 12-02-11
Contract Working Days 73
Addl Days Granted 22
Working Days Charged 170
Percent Time Used 178
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0015-09-165
HIGHWAY TECHNOLOGIES, INC. (8.21%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (0.11%)
SCR CONSTRUCTION CO., INC. (1.32%)
Contract # 10113219
Totals 3689560.42 0.00 3476132.97 100.0

CountyWILLIAMSON
Highway IH 35
From US 79
To FM 3406
CSJ 0015-09-166
Proj ID STP 1402(051)MM
Work Type UPGRADE FRNTGE RDS & RELOCATE RAMPS
 
1.256 5626066.72 57362.19 5998660.97 99.9
Work Order 10-02-14
Work Began 11-10-14
Work Completed  
Time Computed 11-10-14
Contract Working Days 231
Addl Days Granted 19
Working Days Charged 212
Percent Time Used 84
Contractor(s)
AARON CONCRETE CONTRACTORS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0015-09-166
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (8.79%)
RICE ENVIRONMENTAL SERVICES(0.57%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.41%)
SCR CONSTRUCTION CO., INC. (0.25%)
ROADWAY SPECIALTIES, INC.(1.98%)
MURRAY CONSTRUCTION(0.32%)
CHANDLER CONCRETE, INC.(7.59%)
LONE STAR PAVING COMPANY ( 71.05%)
TRP CONSTRUCTION GROUP, LLC(1.56%)
EBERLE MATERIALS INC.(0.11%)
Contract # 08143246
Totals 5626066.72 57362.19 5998660.97 99.9

CountyWILLIAMSON
Highway IH 35
From US 79
To SH 45N
CSJ 0015-09-173
Proj ID STP 2016(384)MM
Work Type NORTHBOUND OPERATIONAL IMPROVEMENTS
 
2.293 27970898.83 0.00 0.00 0.0
CountyWILLIAMSON
Highway IH 35
From US 79
To SH 45N
CSJ 0015-09-182
Proj ID ROW 15-9-182
Work Type UTILITY ADJUSTMENTS
 
1.760 156105.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 555
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
CAPITAL EXCAVATION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0015-09-173
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12153201
Totals 28127003.83 0.00 0.00 0.0

CountyTRAVIS
Highway IH 35
From AT FM 1825
To .
CSJ 0015-10-061
Proj ID IM 0353(286)
Work Type LANDSCAPING AND IRRIGATION
 
0.100 238426.00 0.00 223382.46 93.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-16-13
Work Began 11-11-13
Work Completed  
Time Computed 10-02-13
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 22
Percent Time Used 48
Contractor(s)
CENTRAL NORTH CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0015-10-061
AQUA BORE( 89.13%)
N-LINE TRAFFIC MAINTENANCE, L.P. (3.52%)
Contract # 08133231
Totals 238426.00 0.00 223382.46 93.6

CountyTRAVIS
Highway SL 275 ETC
From AT RUNDBERG LN
To .
CSJ 0015-11-061
Proj ID STP 1502(300)HES
Work Type IMPROVE TRAFFIC SIGNAL
 
0.700 620866.15 18184.00 65445.00 10.5
Work Order 08-31-15
Work Began 12-01-15
Work Completed  
Time Computed 09-30-15
Contract Working Days 195
Addl Days Granted 0
Working Days Charged 17
Percent Time Used 8
Contractor(s)
MIDASCO, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0015-11-061
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06153055
Totals 620866.15 18184.00 65445.00 10.5

CountyTRAVIS
Highway LP 275
From 400' S OF WALNUT CREEK BRIDGE
To RUTLAND DR
CSJ 0015-11-062
Proj ID STP 2013(470)
Work Type MILL, SEAL & THIN OVERLAY
 
1.944 1249601.80 0.00 1661215.22 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-03-13
Work Began 10-21-13
Work Completed  
Time Computed 06-19-13
Contract Working Days 42
Addl Days Granted 0
Working Days Charged 41
Percent Time Used 97
Contractor(s)
RAMMING PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0015-11-062
ROADWAY SPECIALTIES, INC.(0.09%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.38%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (4.14%)
PENNTEX MILLING, LLC (3.40%)
TRP CONSTRUCTION GROUP, LLC(5.04%)
Contract # 03133031
Totals 1249601.80 0.00 1661215.22 99.9

CountyTRAVIS
Highway IH 35
From BRAKER LN
To BEN WHITE BLVD
CSJ 0015-13-338
Proj ID STP 2012(545)MM
Work Type CONST SIDEWALKS ON BOTH SIDES IH 35
 
11.000 1651934.64 0.00 2037552.26 100.0
CountyTRAVIS
Highway US 183
From IH 35
To NORWOOD PARK
CSJ 0151-09-144
Proj ID NH 2012(546)
Work Type CONSTRUCT SIDEWALKS
 
0.474 234806.96 0.00 308925.32 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-10-12
Work Began 10-15-12
Work Completed 04-22-15
Time Computed 08-26-12
Contract Working Days 288
Addl Days Granted 43
Working Days Charged 324
Percent Time Used 97
Contractor(s)
AUSTIN FILTER SYSTEMS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0015-13-338
N-LINE TRAFFIC MAINTENANCE, L.P. (0.91%)
PEK, INC.( 35.86%)
Contract # 05123246
Totals 1886741.60 0.00 2346477.58 100.0

CountyTRAVIS
Highway IH 35
From BEN WHITE BLVD.
To HOLLY STREET
CSJ 0015-13-352
Proj ID NH 2015(567)
Work Type REPAIR, MILL, SEAL & OVLY MLS
 
3.057 1822826.46 81897.81 1863069.46 99.9
Work Order 04-01-15
Work Began 09-28-15
Work Completed  
Time Computed 04-17-15
Contract Working Days 66
Addl Days Granted 0
Working Days Charged 50
Percent Time Used 75
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0015-13-352
INTERSTATE BARRICADES & MARKINGS, INC. ( 12.92%)
THE LEVY COMPANY, L.P. (0.32%)
SCR CONSTRUCTION CO., INC. (2.12%)
ENVIRONMENTAL SAFETY SERVICES, INC.(7.29%)
Contract # 02153224
Totals 1822826.46 81897.81 1863069.46 99.9

CountyTRAVIS
Highway IH 35
From 53RD STREET
To BARBARA JORDAN BLVD
CSJ 0015-13-360
Proj ID CC 15-13-360
Work Type ADD ACCESS FROM NBFR TO 53RD STREET
 
0.270 2905019.45 50099.77 3304406.35 99.9
Work Order 02-19-14
Work Began 09-16-14
Work Completed  
Time Computed 08-18-14
Contract Working Days 175
Addl Days Granted 10
Working Days Charged 177
Percent Time Used 95
Contractor(s)
CAPITAL EXCAVATION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0015-13-360
N-LINE TRAFFIC MAINTENANCE, L.P. (0.51%)
APAC-TEXAS, INC. (6.47%)
AVERY"S LAWN CARE(1.04%)
EARTH REINFORCEMENT SPECIALISTS(5.38%)
FLASHER EQUIPMENT COMPANY(1.14%)
ROADWAY SPECIALTIES, INC.(3.10%)
THE LEVY COMPANY, L.P. (8.09%)
Contract # 12133025
Totals 2905019.45 50099.77 3304406.35 99.9

CountyTRAVIS
Highway IH 35
From 0.2 MILES SOUTH OF HOWARD LANE
To 0.2 MILES SOUTH OF PARMER LANE
CSJ 0015-13-362
Proj ID C 15-13-362
Work Type CONSTRUCT NB COLLECTOR - DISTRIBUTOR
 
1.140 2412039.38 22323.04 2691709.29 100.0
Work Order 01-06-14
Work Began 02-17-14
Work Completed 04-27-15
Time Computed 01-22-14
Contract Working Days 189
Addl Days Granted 4
Working Days Charged 185
Percent Time Used 95
Contractor(s)
AARON CONCRETE CONTRACTORS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0015-13-362
N-LINE TRAFFIC MAINTENANCE, L.P. (1.56%)
ROADWAY SPECIALTIES, INC.(2.40%)
TRP CONSTRUCTION GROUP, LLC(1.15%)
RICE ENVIRONMENTAL SERVICES(0.94%)
AUSTIN WOOD RECYCLING(0.17%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (3.35%)
LONE STAR PAVING CO. ( 25.99%)
Contract # 08133260
Totals 2412039.38 22323.04 2691709.29 100.0

CountyTRAVIS
Highway IH 35 ETC
From AT SS 69/ US 290
To .
CSJ 0015-13-366
Proj ID STP 2015(187)HES
Work Type IMPROVE TRAFFIC SIGNAL
 
0.833 1115771.60 0.00 646647.52 57.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 02-11-15
Work Began 05-04-15
Work Completed  
Time Computed 02-27-15
Contract Working Days 224
Addl Days Granted 0
Working Days Charged 134
Percent Time Used 59
Contractor(s)
MIDASCO, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0015-13-366
M & M STRIPING & POWER WASHING, LLC(1.86%)
BAY CITY TRAFFIC (9.59%)
HOLDER DRILLING(1.38%)
Contract # 10143218
Totals 1115771.60 0.00 646647.52 57.9

CountyTRAVIS
Highway IH 35
From IH 35 @ AIRPORT BOULEVARD
To .
CSJ 0015-13-375
Proj ID IM 0353(287)
Work Type LANDSCAPING & IRRIGATION
 
0.100 140036.20 0.00 118551.04 84.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-16-13
Work Began 02-03-14
Work Completed  
Time Computed 10-02-13
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 16
Percent Time Used 35
Contractor(s)
CENTRAL NORTH CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0015-13-375
AQUA BORE( 22.49%)
N-LINE TRAFFIC MAINTENANCE, L.P. (5.99%)
Contract # 08133262
Totals 140036.20 0.00 118551.04 84.6

CountyTRAVIS
Highway IH 35
From IH 35 @ US 290
To .
CSJ 0015-13-376
Proj ID IM 0353(288)
Work Type LANDSCAPING & IRRIGATION
 
0.100 184834.90 1230.60 154185.81 83.4
Work Order 09-16-13
Work Began 01-13-14
Work Completed  
Time Computed 10-02-13
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 29
Percent Time Used 64
Contractor(s)
CENTRAL NORTH CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0015-13-376
AQUA BORE( 13.52%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.00%)
Contract # 08133036
Totals 184834.90 1230.60 154185.81 83.4

CountyTRAVIS
Highway IH 35
From NORTH OF STASSNEY LANE
To SOUTH OF WILLIAM CANNON DRIVE
CSJ 0015-13-379
Proj ID STP 1502(521)MM
Work Type OPERATIONAL IMPROVEMENTS
 
4.888 73779000.24 0.00 0.00 0.0
CountyTRAVIS
Highway IH 35
From NORTH OF STASSNEY LANE
To SOUTH OF WILLIAM CANNON DRIVE
CSJ 0015-13-390
Proj ID NH 2016(344)
Work Type UTILITY ADJUSTMENTS ONLY
 
1.655 5054226.50 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 1,000
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
OHL USA, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0015-13-379
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11153001
Totals 78833226.74 0.00 0.00 0.0

CountyTRAVIS
Highway IH 35
From 0.042 MI. S OF EAST CESAR CHAVEZ ST
To 0.027 MI. N OF 38TH&1/2 ST
CSJ 0015-13-391
Proj ID CC 15-13-391
Work Type INSTALL OVERHEAD BRIDGE DETECTION
 
2.700 412024.72 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 145
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANALYTICAL TECHNOLOGY CONSULTANTS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0015-13-391
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12153230
Totals 412024.72 0.00 0.00 0.0

CountyTRAVIS
Highway LP 275
From EBERHART LANE
To FOREMOST DR
CSJ 0016-01-108
Proj ID STP 2014(708)MM
Work Type RECONST TO 4 - LN DIVIDED RDWY
 
1.340 5832740.21 183610.92 3610246.40 61.8
CountyTRAVIS
Highway LP 275
From EBERHART LANE
To FOREMOST DR
CSJ 0016-01-111
Proj ID C 16-1-111
Work Type ROW UTL. ADJ.
 
1.340 483960.00 150798.00 403540.00 83.3
Work Order 08-08-14
Work Began 10-06-14
Work Completed  
Time Computed 10-06-14
Contract Working Days 224
Addl Days Granted 74
Working Days Charged 261
Percent Time Used 87
Contractor(s)
DAN WILLIAMS COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0016-01-108
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (5.10%)
DUSTROL, INC.(0.45%)
EBC CONSTRUCTION, LLC(6.84%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.51%)
INTERSTATE BARRICADES & MARKINGS, INC. (0.75%)
PANTHER CREEK TRANSPORTATION, INC. (1.40%)
RICE ENVIRONMENTAL SERVICES(0.22%)
APAC-TEXAS, INC. ( 25.85%)
A BROTHERS MILLING, LLC(0.17%)
AARON CONCRETE CONTRACTORS, L.P. (1.39%)
Contract # 06143237
Totals 6316700.21 334408.92 4013786.40 63.5