AVERAGE LOW BID UNIT PRICE - MAINTENANCE - BEAUMONT DISTRICT

Last Update: Monday, May 11, 2015
ITEMS 712 2004 TO 785 6008
Items Items Bid Code Range
0104 - 0168
0247 - 0292
0316 - 0361
0400 - 0496
0500 - 0560
0618 - 0690
0712 - 0785
1122 - 1122
3244 - 3268
6001 - 6834
7010 - 7622
8317 - 8852
712 2004 - 785 6008
Item No Description Units April 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2004 JT / CRCK SEAL (RUBBER - ASPHALT) LF     16,368.000 1.50000 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     552.323 432.42916 2
730 6001 STRIP MOWING AC     13,934.000 30.66852 14
730 6002 FULL - WIDTH MOWING AC     180,691.200 34.98402 18
730 6003 SPOT MOWING AC     1,440.000 48.21250 12
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     752.540 500.00000 1
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     1,035.140 500.00000 1
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     70.800 500.00000 1
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     76.300 500.00000 1
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     180.000 100.00000 1
738 2010 CLEANING / SWEEPING (SPOT) MI     130.000 100.00000 1
738 2011 CLEANING / SWEEPING (HANDWORK) SY     131,646.060 0.50000 1
738 6002 CLEANING / SWEEPING (CENTER MEDIAN) MI     3,276.000 400.00000 2
738 6004 CLEANING / SWEEPING (OUTSIDE MAIN LANE MI     3,252.360 400.00000 2
738 6006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     1,469.600 350.00000 2
738 6008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP MI     647.200 350.00000 2
738 6009 CLEANING / SWEEPING (AGGREGATE REMOVAL MI     400.000 500.00000 2
738 6010 CLEANING / SWEEPING (SPOT) MI     220.000 300.00000 2
738 6011 CLEANING / SWEEPING (HANDWORK) SY     2,451,196.000 0.40000 2
738 6034 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (1 MI     13.360 100.00000 2
751 6008 MOWING, TRIMMING, AND EDGING CYC     16.000 145.00000 1
751 6009 MULCH & RESHAPING OF PLANT BEDS CYC     1.000 440.00000 1
751 6010 PLANT BED MAINTENANCE CYC     16.000 58.00000 1
751 6064 MOWING, TRIMMING AND EDGING (SITE A) CYC     1.000 145.00000 1
751 6079 PLANT BED MAINTENANCE (SITE A) CYC     1.000 58.00000 1
752 6003 TREE TRIMMING / BRUSH REMOVAL MI 4.500 3,000.00000 9.000 3,000.00000 2
752 6005 TREE REMOVAL (4" - 12" DIA) EA 546.000 80.00000 1,092.000 80.00000 2
752 6006 TREE REMOVAL (12" - 18" DIA) EA 272.000 100.00000 544.000 100.00000 2
752 6007 TREE REMOVAL (18" - 24" DIA) EA 235.000 125.00000 472.000 130.82627 4
752 6008 TREE REMOVAL (24" - 30" DIA) EA 82.000 225.00000 164.000 225.00000 2
752 6009 TREE REMOVAL (30" - 36" DIA) EA 34.000 300.00000 68.000 300.00000 2
752 6010 TREE REMOVAL (36" - 42" DIA) EA 8.000 900.00000 16.000 900.00000 2
752 6011 TREE REMOVAL (42" - 48" DIA) EA 20.000 900.00000 40.000 900.00000 2
752 6012 TREE REMOVAL (48" - 60" DIA) EA 17.000 900.00000 34.000 900.00000 2
752 6013 TREE REMOVAL (60" - 72" DIA) EA 18.000 900.00000 36.000 900.00000 2
752 6019 TREE REMOVAL (72" - 84" DIA) EA 6.000 900.00000 12.000 900.00000 2
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF     79,122.000 1.36402 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     9,500.000 14.54789 2
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     31.000 14.59968 2
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     31.000 14.68484 2
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     200.000 36.75500 2
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     330.000 32.74000 2
770 2006 REALIGN POSTS EA     218.000 13.16606 2
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     2.000 15.60500 2
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     13.000 77.20231 2
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     17.000 2,118.22765 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     34.000 972.74588 2
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     2,400.000 19.76500 2
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     350.000 35.71429 2
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     2.000 100.00000 2
770 2022 REM & RESET SGT IMPACT HEAD EA     115.000 104.34783 2
770 2025 REPLACE SGT CABLE ASSEMBLY EA     50.000 54.40000 2
770 2026 REPLACE SGT STRUT EA     6.000 114.00000 2
770 2027 REMOVE & REPLACE BLOCKOUT EA     800.000 5.75000 2
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     375.000 19.40000 2
774 2001 REMOVE AND REPLACE (TRACC) EA     2.000 12,000.00000 2
774 2014 REMOVE AND REPLACE (NARROW QUAD) EA     2.000 15,000.00000 2
774 2018 REPAIR (CATGR - FRONT SECTION) EA     1.000 3,850.00000 1
774 2019 REPAIR (CATGR - END SECTION) EA     1.000 1,400.00000 1
774 2022 REMOVE AND REPLACE (CATGR) EA     2.000 3,800.00000 2
774 2028 REPAIR (QUAD) (N) (BAY) EA     15.000 1,000.00000 1
774 2029 REPAIR (QUAD) (W) (BAY) EA     2.000 2,100.00000 2
774 2035 REPAIR REACT (CYLINDERS) EA     25.000 1,480.00000 2
774 2037 REPAIR REACT (W) (CYLINDERS) EA     2.000 1,350.00000 2
774 2059 REPAIR (TRACC) (BAY) EA     25.000 520.00000 2
774 2060 REPAIR (WIDE TRACC) (BAY) EA     2.000 1,600.00000 2
785 6008 BRIDGE JOINT REPAIR (FULL DEPTH) LF 408.000 325.00000 816.000 325.00000 2