Monthly State Let Construction Report For Beaumont District As Of Aug 16, 2016 Page 2 Of 3

Last Update: Tuesday, August 16, 2016
FTP Icon
page 1 | page 2 | page 3

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyJEFFERSON
Highway SH 87
From SH 347,
To US 69
CSJ 0306-03-121
Proj ID STP 2016(704)
Work Type GR, BA, OCST, ACP, JOINT SEAL
 
1.780 1428197.41 0.00 1294848.69 90.6
CountyJEFFERSON
Highway SH 87
From US 69
To .10 MI N. OF SH 82
CSJ 0307-01-145
Proj ID STP 2016(704)
Work Type GR, BA, OCST, ACP, JOINT SEAL
 
2.968 1730678.56 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-11-16
Work Began 04-18-16
Work Completed  
Time Computed 00-00-00
Contract Working Days 70
Addl Days Granted 29
Working Days Charged 23
Percent Time Used 23
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-121
CPAVE, INC.( 19.61%)
CRABTREE BARRICADE SYSTEMS, INC. (2.72%)
DUSTROL, INC.( 15.77%)
Contract # 02163041
Totals 3158875.97 0.00 1294848.69 40.9

CountyJEFFERSON
Highway SH 73
From AT RAINBOW BRIDGE
To (STR 030603015)
CSJ 0306-03-123
Proj ID NH 2014(978)
Work Type CLEAN AND REPAINT BRIDGE
 
1.460 26599824.20 1126165.85 26996726.39 99.9
Work Order 10-17-14
Work Began 01-05-15
Work Completed  
Time Computed 11-02-14
Contract Working Days 614
Addl Days Granted 0
Working Days Charged 462
Percent Time Used 75
Contractor(s)
SAFFO CONTRACTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-123
CRABTREE BARRICADE SYSTEMS, INC. (0.09%)
JMD BUILDING PRODUCTS LLC(5.07%)
EMPIRE SCAFFOLD(6.33%)
CEKRA INC. (3.08%)
WIDGEON CONSTRUCTION, INC. (0.00%)
Contract # 07143202
Totals 26599824.20 1126165.85 26996726.39 99.9

CountyJEFFERSON
Highway SH 73
From AT VETERANS MEMORIAL BRIDGE
To (STR 30603030)
CSJ 0306-03-125
Proj ID BR 1502(600)
Work Type REPLACE DOLPHINS
 
0.123 3805302.00 0.00 3285816.00 86.3
CountyJEFFERSON
Highway SH 73
From AT RAINBOW BRIDGE
To (STR 030603015)
CSJ 0306-03-128
Proj ID BR 1502(600)
Work Type REPAIR DOLPHINS
 
0.123 60432.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-08-15
Work Began 02-01-16
Work Completed  
Time Computed 00-00-00
Contract Working Days 210
Addl Days Granted 0
Working Days Charged 110
Percent Time Used 52
Contractor(s)
MCCARTHY BUILDING COMPANIES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-125
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09153024
Totals 3865734.00 0.00 3285816.00 84.9

CountyJEFFERSON
Highway SH 87
From AT INTRACOASTAL CANAL BRIDGE
To .
CSJ 0307-01-147
Proj ID BR 1502(005)
Work Type STR
 
0.941 3454612.26 351248.50 3940826.41 99.9
Work Order 06-18-15
Work Began 10-12-15
Work Completed  
Time Computed 08-18-15
Contract Working Days 179
Addl Days Granted 42
Working Days Charged 220
Percent Time Used 99
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0307-01-147
INTECH CONTRACTING LLC ( 72.25%)
CRABTREE BARRICADE SYSTEMS, INC. (0.84%)
MIK INDUSTRIAL, LLC( 18.06%)
Contract # 05153053
Totals 3454612.26 351248.50 3940826.41 99.9

CountyJEFFERSON
Highway SH 124
From AT HILLEBRANDT BAYOU
To (STR 036804036)
CSJ 0368-04-028
Proj ID BR 1602(249)
Work Type STR
 
0.900 162352.55 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 28
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
WIDGEON CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0368-04-028
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07163223
Totals 162352.55 0.00 0.00 0.0

CountyLIBERTY
Highway SH 146
From RR OVERPASS IN HARDIN, SOUTH
To SL 227
CSJ 0388-03-078
Proj ID STP 1602(059)
Work Type PVMT REPAIR, MILL, ACP
 
5.438 1675302.98 0.00 0.00 0.0
CountyLIBERTY
Highway SL 227
From GRAND AVENUE, SOUTH
To US 90
CSJ 0388-05-010
Proj ID STP 1602(058)
Work Type MILL, PVMT REPAIR, OCST, ACP
 
0.435 402515.84 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 07-29-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 56
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0388-03-078
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05163009
Totals 2077818.82 0.00 0.00 0.0

CountyCHAMBERS
Highway IH 10
From HARRIS COUNTY
To SH 61
CSJ 0508-02-111
Proj ID STP 1602(060)HES
Work Type TXT SHLDRS
 
15.790 131475.45 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-06-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 12
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DOUBLE A CONTRACTING, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0508-02-111
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05163223
Totals 131475.45 0.00 0.00 0.0

CountyCHAMBERS
Highway IH 10
From EAST OF HARRIS COUNTY LINE
To WEST OF SH 146
CSJ 0508-02-112
Proj ID IM 0108(182)
Work Type RELOCATE EASTBOUND EXIT RAMP
 
0.568 1813849.85 0.00 1707684.00 96.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-27-15
Work Began 11-10-15
Work Completed  
Time Computed 00-00-00
Contract Working Days 90
Addl Days Granted 29
Working Days Charged 172
Percent Time Used 144
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0508-02-112
JMHP, INC. (4.59%)
FLORIDA TRAFFIC CONTROL DEVICES, INC.(3.80%)
REGIONAL TRAFFIC SERVICES LLC(1.54%)
CPAVE, INC.(0.13%)
TLC TRUCKING & CONTRACTING, INC. (0.60%)
LONE STAR TRAFFIC SERVICE, INC.(0.16%)
NORTHWEST MATERIALS(0.46%)
HIGHWAY 1, LLC (1.22%)
CENTURY ASPHALT MATERIALS(0.50%)
MVA FINE CURBS LLC (0.02%)
CROSSTEX CURBS (0.44%)
J. KRU LAND SERVICES, LLC. (0.12%)
Contract # 07153215
Totals 1813849.85 0.00 1707684.00 96.4

CountyLIBERTY
Highway SH 105
From 0.647 MILES EAST OF SH 321
To 1.251 MILES EAST OF SH 321
CSJ 0593-01-117
Proj ID STP 1602(153)HES
Work Type GR, BASE, STRIPE, ACP
 
0.604 1388679.60 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-05-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 117
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0593-01-117
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06163013
Totals 1388679.60 0.00 0.00 0.0

CountyNEWTON
Highway FM 363 ETC
From SH 87
To FM 2626
CSJ 0627-03-027
Proj ID STP 2016(950)HES
Work Type CENTERLINE TEXTURING
 
37.637 114947.69 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-10-16
Work Began 08-03-16
Work Completed  
Time Computed 00-00-00
Contract Working Days 17
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
INTERSTATE BARRICADES & MARKINGS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0627-03-027
WEST TEXAS RUMBLE STRIP( 14.65%)
Contract # 04163234
Totals 114947.69 0.00 0.00 0.0

CountyTYLER
Highway FM 92
From FM 1013, NORTH
To FM 1746
CSJ 0703-01-059
Proj ID STP 1602(061)HRR
Work Type SFTY TRT FXD OBJ
 
6.988 123460.25 0.00 0.00 0.0
CountyHARDIN
Highway FM 92
From BEAN RD, SOUTH
To FM 1122
CSJ 0703-02-057
Proj ID STP 1602(062)HRR
Work Type SFTY TRT FXD OBJ
 
4.409 339263.41 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-20-16
Work Began 08-10-16
Work Completed  
Time Computed 00-00-00
Contract Working Days 83
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
NORMAN HIGHWAY CONSTRUCTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0703-01-059
AMERICAN REMEDIATION OPTIONS, INC. (4.74%)
CRABTREE BARRICADE SYSTEMS, INC. (2.52%)
Contract # 05163226
Totals 462723.66 0.00 0.00 0.0

CountyJEFFERSON
Highway IH 10
From AT FM 364
To .
CSJ 0739-02-155
Proj ID C 739-2-155
Work Type GR, BS, STR, PVMT, SIGN
 
1.230 23901799.02 0.00 19725415.04 82.5
CountyZERO COUNTIES
Highway  
From  
To  
CSJ 0739-02-159
Proj ID  
Work Type  
 
  0.00 0.00 221388.27 0.0
CountyJEFFERSON
Highway FM 364
From 0.5 MILES N. OF IH-10
To 900 FT. S. OF IH-10
CSJ 0786-01-082
Proj ID C 786-1-82
Work Type GR, STR, BS, PVMT, STRIPE
 
0.647 6088530.93 0.00 1908832.02 31.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-10-15
Work Began 08-21-15
Work Completed  
Time Computed 00-00-00
Contract Working Days 484
Addl Days Granted 0
Working Days Charged 268
Percent Time Used 55
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0739-02-155
INTERSTATE BARRICADES & MARKINGS, INC. (0.64%)
AMERICAN REMEDIATION OPTIONS, INC. (0.52%)
SCOTT DERR PAINTING CO (0.23%)
DAVIS TREE EXPERTS (0.09%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.57%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.17%)
ADCOCK 4 INVESTMENTS, LLC(1.29%)
MESA ROD BUSTERS, INC. (3.93%)
THIRD COAST SERVICES LLC (1.81%)
BASE CONSTRUCTION(0.62%)
BORTUNCO (0.08%)
SPECIALTY DRILLING, LTD. (0.30%)
RAY"S THREADING AND FAB SHOP (0.26%)
BRYSTAR CONTRACTING, INC.(0.59%)
APAC-TEXAS, INC. (1.45%)
Contract # 07153004
Totals 29990329.95 0.00 21855635.33 72.8

CountyHARDIN
Highway FM 418
From FM 92, SOUTH
To US 96
CSJ 0784-01-046
Proj ID STP 1602(064)HES
Work Type SFTY TRT FXD OBJ
 
1.691 1031113.54 0.00 0.00 0.0
CountyHARDIN
Highway FM 1003
From FM 1293
To SOUTH, 2.5 MI
CSJ 0811-02-028
Proj ID STP 1602(065)HES
Work Type SFTY TRT FXD OBJ
 
2.500 46474.40 0.00 0.00 0.0
CountyHARDIN
Highway FM 787
From FM 1293
To SOUTH, 6.0 MI
CSJ 0813-02-038
Proj ID STP 1602(063)HES
Work Type SFTY TRT FXD OBJ
 
6.000 204002.85 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 183
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0784-01-046
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05163229
Totals 1281590.79 0.00 0.00 0.0

CountyORANGE
Highway FM 105
From UNION PACIFIC RR
To 6.0 MI S OF IH 10
CSJ 0883-02-068
Proj ID STP 2016(410)
Work Type GR, BS, STR. PVMT
 
3.924 2668330.65 0.00 539710.85 20.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-28-16
Work Began 04-18-16
Work Completed  
Time Computed 00-00-00
Contract Working Days 69
Addl Days Granted 55
Working Days Charged 32
Percent Time Used 25
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0883-02-068
CRABTREE BARRICADE SYSTEMS, INC. (1.87%)
AMERICAN REMEDIATION OPTIONS, INC. (2.21%)
NORMAN HIGHWAY CONSTRUCTORS, INC.( 26.64%)
WIDGEON CONSTRUCTION, INC. (1.76%)
Contract # 01163235
Totals 2668330.65 0.00 539710.85 20.2

CountyJEFFERSON
Highway VA
From DISTRICTWIDE
To .
CSJ 0920-00-116
Proj ID STP 2014(646)
Work Type LANDSCAPE
 
3.428 832522.01 0.00 781876.22 93.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 07-22-14
Work Began 10-20-14
Work Completed  
Time Computed 00-00-00
Contract Working Days 219
Addl Days Granted 0
Working Days Charged 198
Percent Time Used 90
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-116
CLASSIC TEJAS CONSTRUCTION, INC. (3.46%)
CRABTREE BARRICADE SYSTEMS, INC. (1.68%)
Contract # 05143219
Totals 832522.01 0.00 781876.22 93.9

CountyJEFFERSON
Highway VA
From DISTRICTWIDE
To .
CSJ 0920-00-117
Proj ID STP 1502(181)
Work Type LANDSCAPE
 
1.000 718877.79 2500.00 639979.00 89.0
Work Order 07-20-15
Work Began 11-16-15
Work Completed  
Time Computed 08-20-15
Contract Working Days 186
Addl Days Granted 0
Working Days Charged 100
Percent Time Used 53
Contractor(s)
APEX LANDSCAPE & IRRIGATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-117
AMERICAN REMEDIATION OPTIONS, INC. (7.17%)
CRABTREE BARRICADE SYSTEMS, INC. (1.28%)
Contract # 05153033
Totals 718877.79 2500.00 639979.00 89.0

CountyJEFFERSON
Highway VA
From DISTRICTWIDE
To .
CSJ 0920-00-118
Proj ID STP 1602(155)
Work Type LANDSCAPE
 
1.567 706493.95 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-04-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 225
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APEX LANDSCAPE & IRRIGATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-118
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06163218
Totals 706493.95 0.00 0.00 0.0

CountyORANGE
Highway CR
From OLD HIGHWAY 90, S.OF I10 ACCESS RD.
To EAST BANK OF NECHES RIVER
CSJ 0920-30-081
Proj ID CM 2015(253)
Work Type GR, BS, STR, PVMT, RR, SIGN
 
0.420 8977087.38 602613.84 5510301.47 61.3
Work Order 06-01-15
Work Began 01-07-16
Work Completed  
Time Computed 06-17-15
Contract Working Days 157
Addl Days Granted 137
Working Days Charged 116
Percent Time Used 39
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-30-081
A. H. BECK FOUNDATION CO., INC.( 14.83%)
INDUS CONSTRUCTION, L.P. (1.81%)
J & M CONTRACTING, COMPANY (0.88%)
RIVER CITY RAILROAD TROLLEY & TRANSIT CONSULTANTS(0.55%)
CRABTREE BARRICADE SYSTEMS, INC. (0.44%)
AMERICAN REMEDIATION OPTIONS, INC. (1.11%)
ALLSTATE SIGNAL & CONSTRUCTION, LLC(1.90%)
Contract # 10143215
Totals 8977087.38 602613.84 5510301.47 61.3

CountyJEFFERSON
Highway CS
From CONCORD RD FROM SH 105
To LUCAS DR.
CSJ 0920-38-153
Proj ID HP 450(1)
Work Type GR, STR, BS, PVMT, STRIPE, SIGNAL
 
1.780 11284746.71 0.00 7387336.54 65.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-26-12
Work Began 04-23-13
Work Completed  
Time Computed 00-00-00
Contract Working Days 364
Addl Days Granted 87
Working Days Charged 393
Percent Time Used 87
Contractor(s)
AMERICAN HOME ASSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0920-38-153
CRABTREE BARRICADE SYSTEMS, INC. (0.39%)
HEMPHILL PILE DRIVING CO., A CORP. (0.19%)
DREWERY CONSTRUCTION COMPANY, INCORPORATED (0.49%)
AMERICAN REMEDIATION OPTIONS, INC. (0.88%)
SOLIS TRUCKING (0.56%)
GARY WHITMAN MATERIALS, INC. (0.16%)
ACCESS DATA SUPPLY, INC. (6.52%)
VIMAC-USA, INC.(5.87%)
PREMIERE DESIGN SOLUTIONS, INC.(5.87%)
APAC-TEXAS, INC. (0.56%)
TEX OP CONSTRUCTION, LP(0.22%)
TRAFFIC CONTROL PRODUCTS (HOUSTON) (0.50%)
CJ EXPRESS (1.59%)
TEXAS STERLING CONSTRUCTION CO.( 75.51%)
ROADSAFE TRAFFIC SYSTEMS, INC. (1.02%)
L D CONSTRUCTION (4.37%)
AAA FLEXIBLE PIPE CLEANING COMPANY, INC. (0.22%)
CPAV SPECIALTIES, LP (1.10%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.12%)
MESA ROD BUSTERS, INC. (0.54%)
R. ORTIZ TRUCKING(1.32%)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (0.92%)
CJ EXPRESS (5.52%)
CURB PLANET INC. (0.11%)
Contract # 07123217
Totals 11284746.71 0.00 7387336.54 65.4

CountyJEFFERSON
Highway CR
From ISLAND PARK RD AT BRAKES BAYOU
To (STR AA0101001)
CSJ 0920-38-217
Proj ID BR 2011(844)
Work Type STR, BASE, ACP
 
0.111 2984343.40 121503.62 1872929.91 62.7
Work Order 06-01-15
Work Began 07-15-15
Work Completed  
Time Computed 07-02-15
Contract Working Days 180
Addl Days Granted 38
Working Days Charged 174
Percent Time Used 79
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-38-217
AMERICAN REMEDIATION OPTIONS, INC. (1.09%)
CRABTREE BARRICADE SYSTEMS, INC. (0.23%)
J & M CONTRACTING, COMPANY (1.87%)
TOLUNAY-WONG ENGINEERS, INC. (0.38%)
PHOENIX POLLUTION CONTROL & ENVIRONMENTAL SERVICES, INC. (2.77%)
ADVANCED POST-TENSION LLC(0.72%)
WHALEY STEEL CORP(0.19%)
CPAVE, INC.(0.10%)
Contract # 03153218
Totals 2984343.40 121503.62 1872929.91 62.7