Item NoDescriptionUnitsMarch 31, 2019Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
770 2003REP RAIL ELMNT(THRIE-BM TRANS TO W-BM)LF  50.0000.550002
770 2004REM/REPL TIMBER/STL POST W/O CONC FNDEA  450.00020.000002
770 2005REM/REPL TIMBER/STL POST W/ CONC FNDEA  20.00015.000002
770 2006REALIGN POSTSEA  350.0005.000002
770 2007REPAIR OF TERMINAL ANCHORS POSTSEA  14.0000.742862
770 2008REPLACE TERMINAL ANCHOR POSTSEA  14.0000.742862
770 2009REMOVE GDRAIL END TRT/ REPL WITH SGTEA  30.0001,750.000002
770 2010REPL SINGLE GDRAIL TERM IMPACT HEADEA  40.000587.500002
770 2011REPLACE SINGLE GDRAIL TERMINAL RAILLF  2,200.00017.272732
770 2012REPLACE SINGLE GDRAIL TERMINAL POSTEA  200.00030.000002
770 2013REPLACE STL BLOCKOUTS W/WOOD BLOCKOUTSEA  100.0000.100001
770 2014REPAIR STEEL POST WITH BASE PLATEEA  10.0000.550002
770 2023REPLACE SGT OBJECT MARKEREA  25.0000.640002
770 2024REPLACE SGT CABLE ANCHOREA  15.0000.400002
770 2025REPLACE SGT CABLE ASSEMBLYEA  15.0000.400002
770 2026REPLACE SGT STRUTEA  12.0000.250002
770 2027REMOVE & REPLACE BLOCKOUTEA  120.00023.312502
770 2029REPAIR RAIL ELEMENT (W-BEAM FURNISHED)LF  2,175.0004.206902
770 2034REMOVE AND RESET SGT IMPACT HEADEA  70.000114.714292
770 2035REPAIR RAIL ELEMENT (CURVED RAIL)LF  100.00012.500002
770 2036REPL SGT IMPACT HEAD (FURNISHED)EA  9.000194.444442
770 2037REM/REPL TIM POST W/O CONC FND (FURN)EA  36.0007.222222
770 2040RAISE RAIL ELEMENTLF  400.0002.500002
776 2004REPAIR (STL POST W/ DOUBLED W-BEAMS-T6LF  100.00030.000001
785 6002BRIDGE JOINT REPAIR (POLYMER)LF  31.000800.000001
786 6002CARBON FIBER REINF POLYMER STRENGTHNINSF  3,140.00036.000001