AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - BROWNWOOD DISTRICT

Last Update: Thursday, July 30, 2015
ITEMS 216 2001 TO 275 2010
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0354
0400 - 0496
0500 - 0560
0610 - 0687
0784 - 0784
1004 - 1122
3004 - 3278
4456 - 4456
5367 - 5926
6001 - 6834
8251 - 8835
9020 - 9020
216 2001 - 275 2010
Item No Description Units July 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
216 2001 PROOF ROLLING HR     5.000 50.00000 1
247 2054 FL BS (CMP IN PLC) (TY D GR 2) (FNAL POS CY     136,772.000 36.37927 6
247 2055 FL BS (CMP IN PLC) (TY D GR 3) (FNAL POS CY     303.000 55.00000 1
247 6053 FL BS (CMP IN PLC) (TYD GR1 - 2) (FNAL POS CY     110,037.000 33.07330 5
247 6055 FL BS (CMP IN PLC) (TY D GR 3) (FNAL POS CY     427.000 80.00000 1
247 6056 FL BS (CMP IN PLC) (TY D GR 4) (FNAL POS CY     3,924.000 28.50000 1
251 2086 REWORK BS MTL (TY D) (10") (DENS CONT) SY     150,306.000 2.50000 1
251 6056 RWRK BS MTL (TY B) (8") (DEN CNT) (ORG POS CY     5,363.000 16.50000 1
251 6086 REWORK BS MTL (TY C) (10") (DENS CONT) SY     149,532.000 1.50000 1
275 2001 CEMENT TON     34.400 200.00000 1
275 2010 CEMENT TREAT (SUBGRADE) (8") SY     3,169.000 5.00000 1