Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA 11.450 3,000.00000 30.550 2,553.19149 4
104 2001 REMOVING CONC (PAV) SY 3,168.000 16.85000 13,247.000 12.01859 2
104 2010 REMOVING CONC (RIPRAP) CY 592.000 35.00000 592.000 35.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     464.000 25.35108 2
104 2021 REMOVING CONC (CURB) LF     52.000 13.20000 1
104 2022 REMOVING CONC (CURB AND GUTTER) LF     6,375.000 5.00000 1
104 2024 REMOVING CONC (RETAINING WALLS) SY     14.000 240.00000 1
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     105.000 54.00000 1
104 2035 REMOVE CONC BARRIER W / CHAIN LINK FENCE LF     85.000 63.00000 1
104 2040 REMOVING CONC (PAVERS) SY     9.000 62.00000 1
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     1,670.000 7.00000 1
105 2043 REMOVING STAB BASE & ASPH PAV (0 - 6") SY     47.000 30.00000 1
110 2001 EXCAVATION (ROADWAY) CY 211.000 15.79147 3,356.000 17.01841 7
110 2002 EXCAVATION (CHANNEL) CY 1,647.000 16.99575 4,059.000 17.77507 6
110 2003 EXCAVATION (SPECIAL) CY 21,164.000 7.50000 21,234.000 7.49934 2
112 2001 SUBGRADE WIDENING (ORD COMP) STA 2.280 2,000.00000 368.190 220.38882 2
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 448.000 20.00000 1,990.000 19.75905 4
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY 1,409.000 17.21505 7,047.000 17.69860 4
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 1,172.000 25.00000 1,172.000 25.00000 1
134 2002 BACKFILL (TY B) STA 17.000 350.00000 17.000 350.00000 1
134 2004 BACKFILL (TY A OR B) STA 319.080 107.86010 1,549.990 250.98446 4
150 2002 BLADING HR 40.000 52.50000 337.000 98.64119 8
156 2001 BULLDOZER WORK HR 25.000 250.00000 25.000 250.00000 1
162 2002 BLOCK SODDING SY 3,800.000 5.00000 3,800.000 5.00000 1
164 2002 BROADCAST SEED (PERM) (RURAL) (SANDY) AC .340 6,000.00000 1.770 1,584.80226 4
164 2010 BROADCAST SEED (TEMP) (WARM) AC .170 5,000.00000 .890 1,466.01124 3
164 2012 BROADCAST SEED (TEMP) (COOL) AC .170 5,000.00000 .890 1,466.01124 3
164 2022 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) AC 2.930 2,000.00000 3.900 3,492.30769 2
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY 15,584.000 .60000 15,584.000 .60000 1
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY 7,792.000 .60000 7,792.000 .60000 1
164 2030 CELL FBR MLCH SEED (TEMP) (WARM) AC     .490 8,000.00000 1
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY 7,792.000 .60000 7,792.000 .60000 1
164 2032 CELL FBR MLCH SEED (TEMP) (COOL) AC     .490 8,000.00000 1
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     11,906.080 .50000 1
164 2034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC 14.550 710.00000 70.930 435.41463 4
164 2041 DRILL SEEDING (TEMP) (WARM) SY     5,953.000 .80000 1
164 2042 DRILL SEEDING (TEMP) (WARM) AC 7.280 720.00000 20.490 411.50854 2
164 2043 DRILL SEEDING (TEMP) (COOL) SY     5,953.000 .80000 1
164 2044 DRILL SEEDING (TEMP) (COOL) AC 7.270 760.00000 20.480 449.26172 2
168 2001 VEGETATIVE WATERING MG 936.260 36.41217 3,324.900 31.68100 12
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     1,840.000 3.00000 1