AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - CHILDRESS DISTRICT

Last Update: Friday, May 27, 2016
ITEMS 500 6001 TO 552 6008
Items Items Bid Code Range
0100 - 0192
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0552
0618 - 0690
6001 - 6101
500 6001 - 552 6008
Item No Description Units May 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS     20.000 294,862.47300 20
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     133.000 6,946.46752 20
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     1,265.000 41.17233 5
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     480.000 36.25000 1
506 6011 ROCK FILTER DAMS (REMOVE) LF     785.000 12.70573 4
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     1,700.000 37.57647 6
506 6024 CONSTRUCTION EXITS (REMOVE) SY     1,700.000 11.31794 6
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF     1,360.000 2.38000 1
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF     1,360.000 .76000 1
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF     17,825.000 9.15549 14
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     1,328.000 2.44386 2
508 6001 CONSTRUCTING DETOURS SY     7,334.000 163.54520 3
510 6003 ONE - WAY TRAF CONT (PORT TRAF SIG) MO     1.000 28,620.00000 1
528 6001 COLORED TEXTURED CONC (4") SY     568.700 162.19253 2
529 6005 CONC CURB (MONO) (TY II) LF     3,757.000 3.98423 2
529 6006 CONC CURB (MONO) (TY II A) LF     8,704.000 3.85000 1
529 6008 CONC CURB & GUTTER (TY II) LF     586.300 24.94000 1
530 6001 INTERSECTIONS (CONC) SY     1,078.000 83.00000 1
530 6004 DRIVEWAYS (CONC) SY     3,696.000 97.17262 2
531 6001 CONC SIDEWALKS (4") SY     1,550.600 94.78517 2
531 6004 CURB RAMPS (TY 1) EA     13.000 1,025.60000 1
531 6005 CURB RAMPS (TY 2) EA     26.000 1,036.60000 1
531 6008 CURB RAMPS (TY 5) EA     4.000 1,205.20000 1
531 6010 CURB RAMPS (TY 7) EA     1.000 1,115.35000 1
531 6013 CURB RAMPS (TY 10) EA     21.000 2,425.82286 2
531 6015 CURB RAMPS (TY 20) EA     1.000 1,534.44000 1
531 6016 CURB RAMPS (TY 21) EA     2.000 1,580.54000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     260,252.000 .43250 2
533 6002 RUMBLE STRIPS (CENTERLINE) LF     815,165.000 .30228 6
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     12,800.000 21.64273 6
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     36.000 1,770.50667 5
540 6007 MTL BEAM GD FEN TRANS (TL2) EA     4.000 2,000.00000 1
540 6009 MTL BEAM GD FEN TRANS (T6) EA     16.000 981.25000 3
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA     18.000 1,142.22222 2
542 6001 REMOVE METAL BEAM GUARD FENCE LF     9,930.000 3.11752 4
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     24.000 317.33333 3
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA     24.000 297.00000 2
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA     54.000 2,525.67259 4
544 6002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     4.000 650.00000 1
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     48.000 306.33333 3
544 6007 GDRAIL END TRT (INSTALL) (HBA POST) EA     72.000 2,826.29111 7
552 6001 WIRE FENCE (TY A) LF     400.000 18.90000 1
552 6002 WIRE FENCE (TY B) LF     497.000 21.00000 1
552 6003 WIRE FENCE (TY C) LF     7,921.000 12.44631 8
552 6008 WIRE FENCE (WATER GAP) LF     480.000 31.25000 4