AVERAGE LOW BID UNIT PRICE - MAINTENANCE - DALLAS DISTRICT

Last Update: Monday, June 2, 2014
ITEMS 310 2005 TO 361 2025
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0618 - 0690
0700 - 0788
1122 - 1122
3255 - 3267
4568 - 4644
5236 - 5236
6006 - 6834
7039 - 7643
8020 - 8368
310 2005 - 361 2025
Item No Description Units May 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
310 2005 PRIME COAT (MC - 30 OR AE - P) GAL     45,396.000 4.14426 3
316 2414 AGGR (TY - PB GR - 4 OR TY - PL GR - 4 SAC - A) CY     422.000 92.95000 1
316 2560 ASPH (AC - 15P OR AC - 20XP) GAL     99,096.000 3.37944 2
316 2649 AGGR (TY - PD GR - 3 OR TY - PL GR - 3) CY     463.000 107.40000 1
316 2717 AGGR (TIER I) CY     3,034.000 86.04318 2
316 2718 AGGR (TIER II) CY     5,381.000 83.00000 1
316 2743 LOAD, HAUL, & DISTB AGGR (PL GR 3) CY     921.000 20.00000 1
316 2769 ASPH (TIER I) TON     311.000 735.00000 1
316 2770 ASPH (TIER II) TON     1,215.000 735.00000 1
340 2011 D - GR HMA (METH) TY - B PG64 - 22 TON     3,503.300 83.58904 3
340 2034 D - GR HMA (METH) TY - C PG64 - 22 TON     5,250.000 85.00000 1
340 2048 D - GR HMA (METH) TY - C SAC - B PG70 - 22 TON     3,000.000 75.00000 1
340 2050 D - GR HMA (METH) TY - C PG70 - 22 TON     22,000.000 87.45455 2
340 2246 D - GR HMA (METH) TY - D PG64 - 22 (LEVEL - UP) TON     1,902.000 102.00000 1
351 2004 FLEXIBLE PAVEMENT STRUCTURE REPAIR (8") SY     9,000.000 24.00000 1
351 2006 FLEXIBLE PAVEMENT STRUCTURE REPAIR (10" SY     23,755.000 60.47148 3
351 2008 FLEXIBLE PAVEMENT STRUCTURE REPAIR (12" SY     112,288.000 46.66661 6
351 2009 FLEXIBLE PAVEMENT STRUCTURE REPAIR (14" SY     2,248.000 44.00000 1
351 2025 FLEX PAVEMENT STRUCTURE REPAIR (8" - 15" SY     4,539.000 53.00000 1
354 2002 PLAN & TEXT ASPH CONC PAV (0" TO 2") SY     14,264.200 1.70000 1
354 2004 PLAN & TEXT ASPH CONC PAV (0" TO 4") SY     324,575.000 2.50820 3
354 2022 PLANE ASPH CONC PAV (0" TO 3") SY     2,625.000 12.00000 1
354 2023 PLANE ASPH CONC PAV (0" TO 4") SY     46,000.000 3.52174 2
354 2024 PLANE ASPH CONC PAV (2" TO 4") SY     1,215.000 9.00000 1
361 2001 FULL - DEPTH REPAIR CRCP (8") SY     9,000.000 147.22222 2
361 2002 FULL - DEPTH REPAIR CRCP (9") SY     5,800.000 160.00000 1
361 2003 FULL - DEPTH REPAIR CRCP (10") SY     12,300.000 157.07317 2
361 2004 FULL - DEPTH REPAIR CRCP (11") SY     2,200.000 148.75000 2
361 2005 FULL - DEPTH REPAIR CRCP (12") SY     4,675.000 246.55080 3
361 2006 FULL - DEPTH REPAIR CRCP (13") SY     2,325.000 161.98925 2
361 2009 FULL - DEPTH REPAIR CPCD (8") SY     235.000 138.00000 1
361 2010 FULL - DEPTH REPAIR CPCD (9") SY     2,500.000 135.00000 1
361 2011 FULL - DEPTH REPAIR CPCD (10") SY     1,300.000 150.00000 1
361 2012 FULL - DEPTH REPAIR CPCD (11") SY     875.000 155.00000 1
361 2013 FULL - DEPTH REPAIR CPCD (12") SY     300.000 190.00000 1
361 2014 FULL - DEPTH REPAIR CPCD (13") SY     30.000 260.00000 1
361 2019 FULL - DEPTH REPAIR CPJR (8") SY     1,000.000 180.00000 1
361 2021 FULL - DEPTH REPAIR CPJR (10") SY     1,000.000 180.00000 1
361 2022 FULL - DEPTH REPAIR CPJR (11") SY     50.000 195.00000 1
361 2025 FULL - DEPTH REPAIR CPJR (13") SY     100.000 260.00000 1