MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 18 AS OF MAY 15, 2013 PAGE 52 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ COLLIN SH 66 | 6.025 | 1,579,675.30| 0.00| 1,964,613.41| 99.9| FM 1777 FM 6 | | | | | | 1014-04-012 | | | | | | STP 2011(810) BASE REPAIR AND OVERLAY | | | | | | | | | | | | WORK ORDER- 03-22-11 WORK BEGAN- 06-06-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-21-11 | | | | | | CONTRACT WORKING DAYS- 147 ADDL DAYS GRANTED- 80 | | | | | | WORKING DAYS CHARGED- 257 PERCENT TIME USED- 113 | | | | | | | | | | | | RK HALL, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1014-04-012 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 3.86 | | | | J. V. CONSTRUCTION | |SUB %: 18.60 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 3.35 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 5.64 | | | | DUSTIN ALLEN, INC. | |SUB %: 3.66 | | | | | | | | | | CONTRACT 02113203 | TOTALS | 1,579,675.30| 0.00| 1,964,613.41| 99.9| ************************************************************************************************************************************ COLLIN MELISSA ROAD | 7.755 | 7,108,802.36| 1,919.88| 6,510,254.68|100.0| US 75 GRAYSON COUNTY LINE | | | | | | 0047-14-070 | | | | | | NH 2012(317) FULL DEPTH CONC REP | | | | | | | | | | | | WORK ORDER- 03-16-12 WORK BEGAN- 05-21-12 | | | | | | DATE WORK COMPLETED- 04-25-13 TIME COMPUTED- 05-15-12 | | | | | | CONTRACT WORKING DAYS- 178 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 177 PERCENT TIME USED- 99 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-14-070 | | | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.18 | | | | DUSTROL, INC. | |SUB %: 3.72 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.26 | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 6.07 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.68 | | | | L.F. MILLER CONSTRUCTION CO. | |SUB %: 0.07 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.35 | | | | | | | | | | CONTRACT 02123202 | TOTALS | 7,108,802.36| 1,919.88| 6,510,254.68|100.0| ************************************************************************************************************************************ COLLIN SPUR 399 (SH 121 SOUTH) | 3.440 | 106,580,042.18| 1,247,736.88| 34,969,758.21| 32.8| US 75 WILSON CREEK | | | | | | 0047-06-108 | | | | | | C 47-6-108 GR, STRS & SURF | | | | | | | | | | | | WORK ORDER- 04-18-11 WORK BEGAN- 01-30-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-15-11 | | | | | | CONTRACT WORKING DAYS- 1,024 ADDL DAYS GRANTED- 1 | | | | | | WORKING DAYS CHARGED- 373 PERCENT TIME USED- 36 | | | | | | | | | | | | WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-06-108 | | | | | | A R DANIEL CONSTRUCTION SERVICES, INC. | |SUB %: 0.98 | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 4.85 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.79 | | | | DCCS, LLC | |SUB %: 2.42 | | | | MICA CORPORATION | |SUB %: 3.01 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.38 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 10.82 | | | | W.O.E. CONSTRUCTION | |SUB %: 15.34 | | | | ATS DRILLING, L.P. | |SUB %: 1.24 | | | | E W WELLS GROUP LLC | |SUB %: 0.09 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 1.04 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.25 | | | | CRAIG OLDEN, INC. | |SUB %: 0.01 | | | | EXPERT REBAR SERVICES | |SUB %: 0.60 | | | | SOUTHERN CRUSHED CONCRETE LLC | |SUB %: 0.10 | | | | HERDEZ TRUCKING, INC. | |SUB %: 0.09 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 0.00 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 0.55 | | | | BIG DOG DRILLING, LLC | |SUB %: 0.01 | | | | BIG CITY CRUSHED CONCRETE | |SUB %: 0.64 | | | | JET UNDERGROUND UTILITIES, INC. | |SUB %: 0.58 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.01 | | | | | | | | | | CONTRACT 03113001 | TOTALS | 106,580,042.18| 1,247,736.88| 34,969,758.21| 32.8| ************************************************************************************************************************************ COLLIN SP 399 | 1.815 | 1,311,303.79| 0.00| 0.00| 0.0| SH 5 WILSON CREEK BRIDGE | | | | | | 0047-05-051 | | | | | | NH 2013(448) BASE REPAIR AND OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-05-051 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133024 | TOTALS | 1,311,303.79| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COLLIN NORTH BUS 289-C | 2.348 | 771,988.36| 0.00| 0.00| 0.0| SH 289 GRAYSON COUNTY LINE | | | | | | 0091-03-024 | | | | | | STP 2013(566) BS REP, UNDERSEAL,OV | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0091-03-024 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133032 | TOTALS | 771,988.36| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COLLIN SH 289 | 6.952 | 1,313,429.68| 0.00| 0.00| 0.0| FM 1461 CONTROL SECTION BREAK | | | | | | 1973-01-012 | | | | | | STP 2013(560) BASE REPAIR AND LEVEL-UP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1973-01-012 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133202 | TOTALS | 1,313,429.68| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COLLIN US 75 NB FRONTAGE ROAD | 1.960 | 12,399,737.47| 0.00| 0.00| 0.0| FM 455 SH 5 | | | | | | 0816-04-044 | | | | | | C 816-4-44 GR,STRS,BASE,SURF,PAV,MARK | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 251 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LONE STAR CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0816-04-044 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133204 | TOTALS | 12,399,737.47| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COLLIN SH 78 | 7.888 | 4,383,589.74| 0.00| 3,920,240.90| 91.6| FM 6 HUNT COUNTY LINE | | | | | | 0619-01-022 | | | | | | C 619-1-22 BASE RESTORATION & HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 06-01-11 WORK BEGAN- 08-05-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-31-11 | | | | | | CONTRACT WORKING DAYS- 189 ADDL DAYS GRANTED- 35 | | | | | | WORKING DAYS CHARGED- 344 PERCENT TIME USED- 153 | | | | | | | | | | | | RK HALL, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0619-01-022 | | | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.48 | | | | DUSTY ALLEN, INC. | |SUB %: 2.22 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 4.00 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 2.67 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.98 | | | | W.S. CONSTRUCTION COMPANY | |SUB %: 22.65 | | | | | | | | | | CONTRACT 04113230 | TOTALS | 4,383,589.74| 0.00| 3,920,240.90| 91.6| ************************************************************************************************************************************ COLLIN BUSINESS 78 | 2.563 | 24,832,811.20| 981,956.91| 4,532,129.65| 18.2| SH 78 FM 6 | | | | | | 0281-01-030 | | | | | | C 281-1-030 GRADING, DRAINAGE, AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 06-15-12 WORK BEGAN- 12-13-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-12-12 | | | | | | CONTRACT WORKING DAYS- 630 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 93 PERCENT TIME USED- 14 | | | | | | | | | | | | MARIO SINACOLA & SONS EXCAVATING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0281-01-030 | | | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.35 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 1.79 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.61 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 1.05 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 12.22 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.03 | | | | SIGNATURE CONTRACTING SERVICES, L.L.C. | |SUB %: 0.05 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 1.02 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.36 | | | | ALLIANCE GEOTECHNICAL GROUP | |SUB %: 0.09 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.14 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.76 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.06 | | | | LONE STAR MANHOLE & STRUCTURES, LLC | |SUB %: 3.52 | | | | | | | | | | CONTRACT 04123201 | TOTALS | 24,832,811.20| 981,956.91| 4,532,129.65| 18.2| ************************************************************************************************************************************ COLLIN SPRING CREEK PARKWAY | 3.985 | 203,918.88| 0.00| 206,260.91|100.0| SH 78 MAXWELL CREEK IN WYLIE | | | | | | 0281-02-067 | | | | | | STP 2012(446) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 05-10-12 WORK BEGAN- 10-02-12 | | | | | | DATE WORK COMPLETED- 04-11-13 TIME COMPUTED- 05-26-12 | | | | | | CONTRACT WORKING DAYS- 53 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 49 PERCENT TIME USED- 92 | | | | | | | | | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0281-02-067 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 3.23 | | | | DOWN UNDER CONSTRUCTION | |SUB %: 9.12 | | | | | | | | | | CONTRACT 04123219 | TOTALS | 203,918.88| 0.00| 206,260.91|100.0| ************************************************************************************************************************************ COLLIN N. OF WILLIFORD RD IN SACHSE | 50.849 | 595,393.36| 0.00| 0.00| 0.0| SH 78 ETC SPRING CREEK IN WYLIE | | | | | | 0281-02-069 | | | | | | STP 2013(657) FULL DEPTH REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 157 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0281-02-069 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133007 | TOTALS | 595,393.36| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COLLIN NORTH OF US 380 | 1.257 | 24,888,310.93| 0.00| 24,874,742.16| 99.9| US 75 SOUTH OF BLOOMDALE IN MCKINNEY | | | | | | 0047-14-065 | | | | | | C 47-14-65 GRADING, BASE, PVMT, STR, SIGNS | | | | | | | | | | | | WORK ORDER- 06-15-10 WORK BEGAN- 08-30-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-30-10 | | | | | | CONTRACT WORKING DAYS- 438 ADDL DAYS GRANTED- 102 | | | | | | WORKING DAYS CHARGED- 550 PERCENT TIME USED- 101 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-14-065 | | | | | | EW WELLS GROUP LLC | |SUB %: 0.21 | | | | ARTEX ELECTRIC CO. | |SUB %: 1.78 | | | | FARR FOUNDATION, INC. | |SUB %: 0.55 | | | | HARDY HOLE DRILLING | |SUB %: 0.59 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.63 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 2.18 | | | | PENHALL COMPANY | |SUB %: 0.03 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 12.32 | | | | S & V CONSTRUCTION LLC | |SUB %: 1.51 | | | | SOUTHWEST CONSTRUCTION COMPANY | |SUB %: 0.25 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.10 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.19 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.41 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 1.92 | | | | PROFESSIONAL REBAR INSTALLERS | |SUB %: 1.26 | | | | TEXAS STAR TRANSPORT, LP | |SUB %: 2.81 | | | | EARTH MATERIAL SERVICES, LLC. | |SUB %: 0.03 | | | | ANTIGO CONSTRUCTION, INC. | |SUB %: 0.09 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 0.34 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 0.59 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.95 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.03 | | | | KIRK CONSTRUCTION | |SUB %: 0.41 | | | | I & H CONCRETE CUTTING, INC. | |SUB %: 0.01 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.27 | | | | W.O.E. CONSTRUCTION | |SUB %: 2.99 | | | | MASTERPIECE GRINDING & GROOVING, LLC | |SUB %: 0.02 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.21 | | | | DUSTROL, INC. | |SUB %: 0.06 | | | | DALLAS FOUNDATION DRILLING CO., INC. | |SUB %: 0.02 | | | | DOWN UNDER CONSTRUCTION | |SUB %: 0.10 | | | | | | | | | | CONTRACT 05103001 | TOTALS | 24,888,310.93| 0.00| 24,874,742.16| 99.9| ************************************************************************************************************************************ COLLIN AT SISTER GROVE CREEK | 0.123 | 746,348.44| 10,622.24| 759,371.35| 99.9| FM 545 . | | | | | | 1012-02-025 | | | | | | BR 2002(616) REPLACE BR & APPRS | | | | | | | | | | | | COLLIN WEST OF FM 1827 | 0.953 | 1,982,651.55| 36,924.00| 1,855,582.42| 93.5| FM 545 EAST OF FM 1827 | | | | | | 1012-02-032 | | | | | | C 1012-2-32 GR,DRAINAGE,PVMT,SIGNS,PVMT MKGS | | | | | | | | | | | | WORK ORDER- 07-27-11 WORK BEGAN- 08-10-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-24-11 | | | | | | CONTRACT WORKING DAYS- 208 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 200 PERCENT TIME USED- 96 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1012-02-025 | | | | | | BREDA COMPANY, INC. | |SUB %: 0.51 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.00 | | | | CROSSROADS, L.P. | |SUB %: 0.51 | | | | DUSTROL, INC. | |SUB %: 1.70 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.97 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.93 | | | | JUST GROOVING, LTD. | |SUB %: 0.04 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 19.93 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.16 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.09 | | | | TEXAS INLETS, INC. | |SUB %: 0.69 | | | | TEXAS SHAFTS, INC. | |SUB %: 1.64 | | | | GLENKO CONSTRUCTION PRODUCTS, LLC | |SUB %: 0.87 | | | | | | | | | | CONTRACT 05113203 | TOTALS | 2,728,999.99| 47,546.24| 2,614,953.77| 95.8| ************************************************************************************************************************************ COLLIN NORTH OF CR 995 | 3.995 | 756,412.47| 0.00| 755,383.10| 99.9| FM 1827 NORTH OF MEADOWS | | | | | | 1746-01-021 | | | | | | STP 2012(567)HES GR, BASE, PVMT, PVMT MKGS, SIGNS | | | | | | | | | | | | WORK ORDER- 06-15-12 WORK BEGAN- 10-22-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-22-12 | | | | | | CONTRACT WORKING DAYS- 84 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 95 PERCENT TIME USED- 113 | | | | | | | | | | | | RK HALL, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1746-01-021 | | | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 6.84 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.80 | | | | J & M CONTRACTING, COMPANY | |SUB %: 6.80 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.27 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.84 | | | | | | | | | | CONTRACT 05123234 | TOTALS | 756,412.47| 0.00| 755,383.10| 99.9| ************************************************************************************************************************************ COLLIN US 380 | 4.224 | 1,345,138.05| 0.00| 0.00| 0.0| SH 5 CR 275 | | | | | | 0047-05-052 | | | | | | STP 2013(809) FULL DEPTH REPAIR AND OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 61 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-05-052 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133030 | TOTALS | 1,345,138.05| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COLLIN SH 289 | 4.055 | 23,788,820.89| 0.00| 0.00| 0.0| FM 3537 FM 2478 | | | | | | 0135-12-025 | | | | | | C 135-12-25 WDN GR STRS & SURF | | | | | | | | | | | | WORK ORDER- 10-21-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-18-12 | | | | | | CONTRACT WORKING DAYS- 680 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0135-12-025 | | | | | | ARLINGTON PAVERS, INC. | |SUB %: 0.43 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.33 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.24 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.39 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.96 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 5.42 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 17.27 | | | | ROADWAY SOLUTIONS, INC. | |SUB %: 6.35 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.64 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.33 | | | | USA EROSION, INC. | |SUB %: 1.69 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.65 | | | | | | | | | | CONTRACT 06113007 | TOTALS | 23,788,820.89| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COLLIN FM 544 | 2.953 | 15,783,469.03| 496,511.92| 1,975,594.00| 12.5| FM 2551 FM 2514 | | | | | | 2056-01-045 | | | | | | C 2056-1-45 GR.,STR.,BASE AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 12-07-11 WORK BEGAN- 11-26-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-25-12 | | | | | | CONTRACT WORKING DAYS- 480 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 38 PERCENT TIME USED- 7 | | | | | | | | | | | | LONE STAR CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2056-01-045 | | | | | | ARTEX ELECTRIC, INC. | |SUB %: 3.54 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 14.01 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.25 | | | | DUSTIN ALLEN, INC. | |SUB %: 0.30 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.46 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.90 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.19 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.15 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.16 | | | | DUSTROL, INC. | |SUB %: 0.35 | | | | JM MATERIALS, INC. | |SUB %: 4.40 | | | | | | | | | | CONTRACT 06113239 | TOTALS | 15,783,469.03| 496,511.92| 1,975,594.00| 12.5| ************************************************************************************************************************************ COLLIN FM 455 | 3.448 | 15,996,401.11| 5,500.00| 1,024,740.00| 6.4| SH 289 N BUS 289C, NORTH OF CELINA | | | | | | 0091-03-021 | | | | | | C 91-3-21 GRD, STR, PVMT, SIGNS | | | | | | | | | | | | WORK ORDER- 08-22-12 WORK BEGAN- 02-14-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-14-13 | | | | | | CONTRACT WORKING DAYS- 520 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | MARIO SINACOLA & SONS EXCAVATING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0091-03-021 | | | | | | ALLIANCE GEOTECHNICAL GROUP | |SUB %: 0.21 | | | | ANALYTICAL TECHNOLOGY CONSULTANTS, INC. | |SUB %: 0.11 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.14 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.10 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.93 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.90 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 13.49 | | | | ENVIRONMENTAL SAFETY SERVICES, INC. | |SUB %: 0.97 | | | | LONE STAR BARRIER SERVICES, LLC | |SUB %: 0.24 | | | | LONE STAR MANHOLE & STRUCTURES, LLC | |SUB %: 4.63 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.74 | | | | MIKE ALBERT, INC. | |SUB %: 1.33 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.29 | | | | EROSION CONTROL MANAGEMENT SERVICES | |SUB %: 0.47 | | | | | | | | | | CONTRACT 06123003 | TOTALS | 15,996,401.11| 5,500.00| 1,024,740.00| 6.4| ************************************************************************************************************************************ COLLIN SPRING CREEK PKWY | 3.349 | 21,337,007.60| 0.00| 126,400.00| 0.5| SH 78 SH 205 | | | | | | 0281-02-039 | | | | | | C 281-2-39 WDN GR STRS & SURF | | | | | | | | | | | | WORK ORDER- 08-28-12 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 09-13-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 630 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | GLENN THURMAN, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0281-02-039 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06123202 | TOTALS | 21,337,007.60| 0.00| 126,400.00| 0.5| ************************************************************************************************************************************ COLLIN EAST OF FLOYD RD | 3.172 | 16,564,930.23| 755.23| 16,767,248.30| 99.9| US 380 CR 698 (HUNT COUNTY LINE) | | | | | | 0135-05-023 | | | | | | C 135-5-23 GR, STRS, PAVT, CUL, CURB AND GTRS | | | | | | | | | | | | WORK ORDER- 08-17-10 WORK BEGAN- 04-11-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-13-11 | | | | | | CONTRACT WORKING DAYS- 394 ADDL DAYS GRANTED- 5 | | | | | | WORKING DAYS CHARGED- 373 PERCENT TIME USED- 93 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0135-05-023 | | | | | | CRAIG OLDEN, INC. | |SUB %: 0.40 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.16 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 1.44 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 13.58 | | | | RIVER CITIES SAWING, LLC | |SUB %: 0.46 | | | | W.O.E. CONSTRUCTION | |SUB %: 1.43 | | | | S & V CONSTRUCTION LLC | |SUB %: 1.47 | | | | BEAIRD DRILLING | |SUB %: 0.24 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.42 | | | | BREDA COMPANY, INC. | |SUB %: 1.19 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.68 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.63 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.34 | | | | TEXAS STAR TRANSPORT, LP | |SUB %: 0.27 | | | | E W WELLS GROUP LLC | |SUB %: 0.34 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.14 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.21 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 0.25 | | | | | | | | | | CONTRACT 07103211 | TOTALS | 16,564,930.23| 755.23| 16,767,248.30| 99.9| ************************************************************************************************************************************ COLLIN US 380 INTERCHANGE | 3.144 | 17,270,901.44| 41,641.43| 8,774,203.19| 50.8| SH 289 NORTH OF FM 1461 / BS 289D | | | | | | 0091-04-050 | | | | | | C 91-4-50 GRD, STR, PVMT, SIGNS, RAMPS | | | | | | | | | | | | WORK ORDER- 10-13-11 WORK BEGAN- 03-23-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-23-12 | | | | | | CONTRACT WORKING DAYS- 619 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 328 PERCENT TIME USED- 52 | | | | | | | | | | | | MARIO SINACOLA & SONS EXCAVATING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0091-04-050 | | | | | | ALLIANCE GEOTECHNICAL GROUP | |SUB %: 0.20 | | | | ARLINGTON PAVERS, INC. | |SUB %: 0.03 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.36 | | | | DUSTROL, INC. | |SUB %: 0.64 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.44 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 1.13 | | | | MIKE ALBERT, INC. | |SUB %: 1.20 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 14.69 | | | | ROADWAY SOLUTIONS, INC. | |SUB %: 4.41 | | | | TEXAS INLETS, INC. | |SUB %: 4.43 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.10 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.45 | | | | SKAGGS ROAD BORING INC. | |SUB %: 0.12 | | | | SYNERGY SIGNS & SERVICES, LLC | |SUB %: 0.15 | | | | ANCHOR FENCE GROUP, LLC | |SUB %: 0.08 | | | | | | | | | | CONTRACT 07113202 | TOTALS | 17,270,901.44| 41,641.43| 8,774,203.19| 50.8| ************************************************************************************************************************************ COLLIN NORTH OF FM 1461 / BS 289D | 4.090 | 18,214,018.09| 123,300.85| 5,004,253.91| 27.4| SH 289 FM 455 IN CELINA | | | | | | 0091-04-055 | | | | | | C 91-4-55 GR, STR, PVMT, SIGNS, PVMT MKGS | | | | | | | | | | | | WORK ORDER- 10-18-11 WORK BEGAN- 06-22-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-15-12 | | | | | | CONTRACT WORKING DAYS- 519 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 307 PERCENT TIME USED- 59 | | | | | | | | | | | | MARIO SINACOLA & SONS EXCAVATING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0091-04-055 | | | | | | ALLIANCE GEOTECHNICAL GROUP | |SUB %: 0.18 | | | | ARLINGTON PAVERS, INC. | |SUB %: 0.02 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.32 | | | | DUSTROL, INC. | |SUB %: 0.73 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.15 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.88 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.90 | | | | LONE STAR MANHOLE & STRUCTURES, LLC | |SUB %: 6.25 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 15.14 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.29 | | | | ROADWAY SOLUTIONS, INC. | |SUB %: 1.97 | | | | FARR FOUNDATION, INC. | |SUB %: 0.02 | | | | ENVIRONMENTAL SAFETY SERVICES, INC. | |SUB %: 0.73 | | | | | | | | | | CONTRACT 07113203 | TOTALS | 18,214,018.09| 123,300.85| 5,004,253.91| 27.4| ************************************************************************************************************************************ COLLIN WEST OF CR 608 IN FARMERSVILLE | 1.307 | 18,186,687.16| 1,034,662.86| 5,795,563.54| 31.8| US 380 EAST OF FLOYD RD | | | | | | 0135-05-025 | | | | | | C 135-5-25 GR,STRS,PVT,CUL,CURB AND GTRS | | | | | | | | | | | | WORK ORDER- 05-10-12 WORK BEGAN- 11-05-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-05-12 | | | | | | CONTRACT WORKING DAYS- 551 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 137 PERCENT TIME USED- 24 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0135-05-025 | | | | | | BREDA COMPANY, INC. | |SUB %: 0.68 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.21 | | | | CRAIG OLDEN, INC. | |SUB %: 1.58 | | | | DUSTROL, INC. | |SUB %: 0.63 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.28 | | | | JUST GROOVING, LTD. | |SUB %: 0.01 | | | | K & S UTILITY CONTRACTORS, INC. | |SUB %: 4.42 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 6.11 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.01 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.11 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.04 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 7.43 | | | | MCL CONTRACTING, LLC | |SUB %: 0.77 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.18 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.02 | | | | | | | | | | CONTRACT 07113204 | TOTALS | 18,186,687.16| 1,034,662.86| 5,795,563.54| 31.8| ************************************************************************************************************************************ COLLIN EAST OF FM 2478 (CUSTER RD) | 3.124 | 11,650,909.58| 330,486.94| 10,441,714.95| 89.6| US 380 EAST OF LAKE FOREST DRIVE | | | | | | 0135-02-045 | | | | | | C 135-2-45 BASE, PVMT, SIGNS, MKGS | | | | | | | | | | | | WORK ORDER- 10-05-11 WORK BEGAN- 01-03-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-03-12 | | | | | | CONTRACT WORKING DAYS- 315 ADDL DAYS GRANTED- 25 | | | | | | WORKING DAYS CHARGED- 339 PERCENT TIME USED- 99 | | | | | | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0135-02-045 | | | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.25 | | | | DUSTROL, INC. | |SUB %: 0.43 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.52 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.15 | | | | IOWA BRIDGE & CULVERT, LC | |SUB %: 10.95 | | | | K & S UTILITY CONTRACTORS, INC. | |SUB %: 14.92 | | | | MIKE ALBERT, INC. | |SUB %: 11.79 | | | | ROADWAY SOLUTIONS, INC. | |SUB %: 1.36 | | | | SHILLING CONSTRUCTION COMPANY | |SUB %: 1.60 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.35 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.25 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 0.72 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.06 | | | | C.B. SERVICES, INC. | |SUB %: 0.21 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.21 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.23 | | | | TEXAS BOMANITE | |SUB %: 1.70 | | | | | | | | | | CONTRACT 07113269 | TOTALS | 11,650,909.58| 330,486.94| 10,441,714.95| 89.6| ************************************************************************************************************************************ COLLIN ON DICKERSON STREET AT MCKAMY BRANC | 0.053 | 649,933.61| 5,161.58| 187,112.58| 28.7| CS . | | | | | | 0918-24-125 | | | | | | BR 2007(287) REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 08-16-12 WORK BEGAN- 02-19-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-12-13 | | | | | | CONTRACT WORKING DAYS- 147 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 17 PERCENT TIME USED- 11 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-24-125 | | | | | | FOUNDATION DRILLERS, INC. | |SUB %: 6.47 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.45 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.55 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 1.35 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.11 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.90 | | | | ROAD MASTER STRIPING LLC | |SUB %: 0.38 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.18 | | | | BRENDA PRICE TRUCKING | |SUB %: 1.40 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.39 | | | | | | | | | | CONTRACT 07123011 | TOTALS | 649,933.61| 5,161.58| 187,112.58| 28.7| ************************************************************************************************************************************ COLLIN AT DGNO RAILROAD UNDERPASS | 0.407 | 3,522,660.11| 46,316.65| 46,316.65| 1.3| SH 5 RAILROAD DOT NO. 763 390W | | | | | | 0047-09-027 | | | | | | STP 2012(564) GRADING, PVMT, REMOVE STRUCTURE | | | | | | | | | | | | WORK ORDER- 09-24-12 WORK BEGAN- 04-29-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-22-13 | | | | | | CONTRACT WORKING DAYS- 188 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | MCMAHON CONTRACTING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-09-027 | | | | | | APAC-TEXAS, INC. | |SUB %: 8.87 | | | | FARR FOUNDATION, INC. | |SUB %: 6.42 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.19 | | | | J. E. GUZMAN CONSTRUCTION, INC. | |SUB %: 4.48 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.65 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.13 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 6.58 | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 1.88 | | | | | | | | | | CONTRACT 07123216 | TOTALS | 3,522,660.11| 46,316.65| 46,316.65| 1.3| ************************************************************************************************************************************ COLLIN TELEPHONE RD (CR 275) | 3.146 | 63,579,301.85| 0.00| 387,600.00| 0.6| US 75 NORTH OF MELISSA ROAD | | | | | | 0047-14-068 | | | | | | C 47-14-68 GRADING, BASE, PVMT, STR, SIGNS | | | | | | | | | | | | WORK ORDER- 11-16-12 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 920 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-14-068 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08123001 | TOTALS | 63,579,301.85| 0.00| 387,600.00| 0.6| ************************************************************************************************************************************ COLLIN STONEBRIDGE DR. | 3.439 | 170,000.00| 165.00| 158,795.54| 93.4| FM 2478 US 380 IN MCKINNEY | | | | | | 2351-01-019 | | | | | | STP 2013(010) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 10-24-12 WORK BEGAN- 11-15-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-09-12 | | | | | | CONTRACT WORKING DAYS- 54 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 45 PERCENT TIME USED- 83 | | | | | | | | | | | | LEGENDS LANDSCAPES LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2351-01-019 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 2.29 | | | | | | | | | | CONTRACT 09123012 | TOTALS | 170,000.00| 165.00| 158,795.54| 93.4| ************************************************************************************************************************************ COLLIN DENTON COUNTY LINE | 6.097 | 2,971,234.98| 275,055.78| 876,063.58| 29.4| FM 455 EAST OF SH 289 | | | | | | 0816-04-048 | | | | | | STP 2013(182) SHLD WDN,BS REP,SEAL,LVL-UP | | | | | | | | | | | | WORK ORDER- 01-11-13 WORK BEGAN- 02-14-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-14-13 | | | | | | CONTRACT WORKING DAYS- 162 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 51 PERCENT TIME USED- 31 | | | | | | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0816-04-048 | | | | | | DUSTROL, INC. | |SUB %: 0.93 | | | | ENVIRONMENTAL STANDARDS | |SUB %: 0.60 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.38 | | | | ODUM SERVICES, L.P. | |SUB %: 2.16 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.47 | | | | TRANSPORT TRUST | |SUB %: 2.37 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 2.13 | | | | MIKE ALBERT, INC. | |SUB %: 1.06 | | | | | | | | | | CONTRACT 11123207 | TOTALS | 2,971,234.98| 275,055.78| 876,063.58| 29.4| ************************************************************************************************************************************ COLLIN SOUTH OF BLOOMDALE IN MCKINNEY | 2.453 | 68,107,530.26| 969,327.90| 13,574,246.83| 19.9| US 75 TELEPHONE RD (CR 275) | | | | | | 0047-14-067 | | | | | | C 47-14-67 GRADING, BASE, PVMT, STR, SIGNS | | | | | | | | | | | | WORK ORDER- 01-26-12 WORK BEGAN- 11-05-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-24-12 | | | | | | CONTRACT WORKING DAYS- 780 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 129 PERCENT TIME USED- 16 | | | | | | | | | | | | ZACHRY CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-14-067 | | | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.38 | | | | ANTIGO CONSTRUCTION, INC. | |SUB %: 0.10 | | | | W.O.E. CONSTRUCTION | |SUB %: 1.78 | | | | AUSTIN BRIDGE & ROAD, LP | |SUB %: 9.72 | | | | HAYWARD BAKER, INC. | |SUB %: 1.20 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.06 | | | | INTERSTATE FOUNDATION, LLC | |SUB %: 2.05 | | | | LONE STAR MANHOLE & STRUCTURES, LLC | |SUB %: 0.81 | | | | MICA CORPORATION | |SUB %: 1.48 | | | | RG PAINTING | |SUB %: 0.34 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.62 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.47 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.14 | | | | PANTHER CREEK TRANSPORTATION, INC. | |SUB %: 0.07 | | | | HERDEZ TRUCKING, INC. | |SUB %: 5.51 | | | | COWBOY TRUCKING | |SUB %: 0.42 | | | | USA EROSION, INC. | |SUB %: 1.00 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.12 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.94 | | | | HORIZON TRUCKING, LLC | |SUB %: 0.20 | | | | C & B SERVICES, INC. | |SUB %: 0.04 | | | | SIGNATURE CONTRACTING SERVICES, L.L.C. | |SUB %: 0.01 | | | | | | | | | | CONTRACT 12113001 | TOTALS | 68,107,530.26| 969,327.90| 13,574,246.83| 19.9| ************************************************************************************************************************************ DALLAS LOOP 12 | 3.027 | 1,361,187.56| 57,758.02| 57,758.02| 4.2| SH 78 IH 635 | | | | | | 0009-02-059 | | | | | | NH 2013(316) FDR,MILL,ACP OVERLAY AND PVMNT MARK | | | | | | | | | | | | WORK ORDER- 03-04-13 WORK BEGAN- 04-22-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-22-13 | | | | | | CONTRACT WORKING DAYS- 93 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 1 PERCENT TIME USED- 1 | | | | | | | | | | | | O. TREVINO CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-02-059 | | | | | | BRENDA PRICE TRUCKING | |SUB %: 1.52 | | | | W.O.E. CONSTRUCTION | |SUB %: 3.85 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.42 | | | | AUSTIN BRIDGE & ROAD, LP | |SUB %: 38.07 | | | | DUSTROL, INC. | |SUB %: 8.44 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 2.39 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 2.40 | | | | | | | | | | CONTRACT 01133008 | TOTALS | 1,361,187.56| 57,758.02| 57,758.02| 4.2| ************************************************************************************************************************************ DALLAS LAKE JUNE ROAD | 5.198 | 2,490,572.71| 0.00| 0.00| 0.0| US 175 IH 20 | | | | | | 0197-02-106 | | | | | | NH 2013(317) FDR,ACP OVERLAY AND PVMNT MARKING | | | | | | | | | | | | WORK ORDER- 02-26-13 WORK BEGAN- 04-30-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 166 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | O. TREVINO CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0197-02-106 | | | | | | STRAIGHT LINE SAWING & SEALING | |SUB %: 2.27 | | | | BRENDA PRICE TRUCKING | |SUB %: 3.21 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.58 | | | | DUSTROL, INC. | |SUB %: 5.81 | | | | APAC-TEXAS, INC. | |SUB %: 28.53 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 0.39 | | | | ENVIRONMENTAL STANDARDS, INC. | |SUB %: 0.20 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.89 | | | | | | | | | | CONTRACT 01133215 | TOTALS | 2,490,572.71| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS CULVERT 0.3 MI E OF E FORK RD | 0.024 | 256,468.00| 0.00| 0.00| 0.0| US 80 . | | | | | | 0095-02-109 | | | | | | NH 2013(381) REPAIR SLOPE WITH HEADWALL | | | | | | | | | | | | WORK ORDER- 04-10-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 50 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | WEST GENERAL CONTRACTORS CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0095-02-109 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133218 | TOTALS | 256,468.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS DISTRICTWIDE | 0.001 | 765,740.50| 0.00| 653,654.57| 85.3| VA . | | | | | | 0918-00-158 | | | | | | STP 2010(620) SIGN AND SIGN STRUCTURE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 04-22-10 WORK BEGAN- 07-27-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-27-10 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 180 | | | | | | WORKING DAYS CHARGED- 545 PERCENT TIME USED- 100 | | | | | | | | | | | | STAR OPERATIONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-158 | | | | | | FORTSON CONTRACTING, INC. | |SUB %: 2.88 | | | | | | | | | | CONTRACT 03103011 | TOTALS | 765,740.50| 0.00| 653,654.57| 85.3| ************************************************************************************************************************************ DALLAS AT VARIOUS LOCATIONS | 0.001 | 348,659.47| 25,135.12| 416,686.59| 99.9| VA IN DALLAS DISTRICT | | | | | | 0918-00-172 | | | | | | STP 2011(903) SIGN REFURBISHMENT | | | | | | | | | | | | WORK ORDER- 04-18-11 WORK BEGAN- 12-12-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-17-11 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 90 | | | | | | WORKING DAYS CHARGED- 454 PERCENT TIME USED- 99 | | | | | | | | | | | | HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-172 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03113014 | TOTALS | 348,659.47| 25,135.12| 416,686.59| 99.9| ************************************************************************************************************************************ DALLAS US 175 | 6.363 | 2,836,135.43| 12,266.27| 2,950,155.04|100.0| LP 12 IH 30 | | | | | | 0581-01-129 | | | | | | NH 2012(385) FULL DPTH REP,MILL & ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 04-16-12 WORK BEGAN- 07-23-12 | | | | | | DATE WORK COMPLETED- 04-10-13 TIME COMPUTED- 06-15-12 | | | | | | CONTRACT WORKING DAYS- 125 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 160 PERCENT TIME USED- 128 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0581-01-129 | | | | | | WINDING ROAD CONSTRUCTION, INC. | |SUB %: 14.66 | | | | DUSTROL, INC. | |SUB %: 8.22 | | | | MELS ELECTRIC, L.P. | |SUB %: 2.46 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 3.07 | | | | SIG-OP SYSTEMS, INC. | |SUB %: 2.10 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.52 | | | | | | | | | | CONTRACT 03123021 | TOTALS | 2,836,135.43| 12,266.27| 2,950,155.04|100.0| ************************************************************************************************************************************ DALLAS DISTRICTWIDE | 0.001 | 336,139.97| 0.00| 0.00| 0.0| VA . | | | | | | 0918-00-162 | | | | | | STP 2013(452) INSTALL GUIDE SIGNS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 540 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-162 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133012 | TOTALS | 336,139.97| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS AT UNION PACIFIC RR | 0.083 | 655,041.95| 0.00| 0.00| 0.0| LP 12 NEAR SH 310 | | | | | | 0581-01-135 | | | | | | NH 2013(449) REPAIR SLOPE WITH RETAINING WALL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 83 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | MASSANA CONSTRUCTION INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0581-01-135 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133213 | TOTALS | 655,041.95| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS ON MONTFORT DRIVE, PETERSON LANE | 0.207 | 563,823.19| 0.00| 15,041.00| 2.6| CS ALPHA ROAD | | | | | | 0918-45-368 | | | | | | STP 97(433)MM GRADING, BASE AND PAVING | | | | | | | | | | | | DALLAS ON MONTFORT DRIVE, PETERSON LANE | 0.001 | 173,390.40| 0.00| 0.00| 0.0| CS ALPHA ROAD | | | | | | 0918-45-577 | | | | | | STP 2001(674)MM ACQUISITION, UTILITIES AND RELOCATI | | | | | | | | | | | | WORK ORDER- 06-10-10 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-07-10 | | | | | | CONTRACT WORKING DAYS- 147 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | MCMAHON CONTRACTING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-368 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04103224 | TOTALS | 737,213.59| 0.00| 15,041.00| 2.0| ************************************************************************************************************************************ DALLAS VARIOUS LOCATIONS ON STATE HIGHWAYS | 0.001 | 1,204,287.78| 0.00| 1,034,071.49| 85.8| VA IN SOUTHWEST DALLAS | | | | | | 0918-45-802 | | | | | | STP 2011(879) CURB RAMPS | | | | | | | | | | | | WORK ORDER- 06-14-11 WORK BEGAN- 08-04-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-30-11 | | | | | | CONTRACT WORKING DAYS- 245 ADDL DAYS GRANTED- 15 | | | | | | WORKING DAYS CHARGED- 238 PERCENT TIME USED- 91 | | | | | | | | | | | | KEN-DO CONTRACTING, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-802 | | | | | | BTA SERVICES, LTD. | |SUB %: 6.10 | | | | CHAPAS TRUCKING | |SUB %: 0.83 | | | | RIOS TRUCKING (GRAND PRAIRIE) | |SUB %: 0.83 | | | | MTZ TRUCKING | |SUB %: 9.96 | | | | APAC-TEXAS, INC. | |SUB %: 1.15 | | | | BROWN"S CONCRETE CONSTRUCTION COMPANY | |SUB %: 2.91 | | | | MELS ELECTRIC, L.P. | |SUB %: 5.72 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.37 | | | | | | | | | | CONTRACT 04113231 | TOTALS | 1,204,287.78| 0.00| 1,034,071.49| 85.8| ************************************************************************************************************************************ DALLAS AT MOUNTAIN CREEK RELIEF #1 AND #3 | 1.382 | 3,049,463.65| 230,385.42| 1,924,788.38| 63.1| SH 180 . | | | | | | 0008-08-072 | | | | | | BR 2012(444) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 06-08-12 WORK BEGAN- 08-27-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-07-12 | | | | | | CONTRACT WORKING DAYS- 273 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 167 PERCENT TIME USED- 61 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0008-08-072 | | | | | | BRENDA PRICE TRUCKING | |SUB %: 1.22 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.09 | | | | DUSTROL, INC. | |SUB %: 0.88 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.85 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 7.99 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 1.08 | | | | RESONANT MACHINES | |SUB %: 0.59 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 4.61 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.64 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.70 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.24 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.43 | | | | | | | | | | CONTRACT 04123004 | TOTALS | 3,049,463.65| 230,385.42| 1,924,788.38| 63.1| ************************************************************************************************************************************ DALLAS LOOP 12 | 7.889 | 496,968.00| 9,353.45| 469,184.35| 95.2| IH 45 IH 30 | | | | | | 0092-14-079 | | | | | | IM 0453(131) ITS | | | | | | | | | | | | WORK ORDER- 05-15-12 WORK BEGAN- 08-09-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-09-12 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 67 PERCENT TIME USED- 111 | | | | | | | | | | | | SIEMENS INDUSTRY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0092-14-079 | | | | | | DOWN UNDER CONSTRUCTION | |SUB %: 0.86 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 16.70 | | | | TCB FOUNDATION DRILLERS, INC. | |SUB %: 1.15 | | | | | | | | | | CONTRACT 04123010 | TOTALS | 496,968.00| 9,353.45| 469,184.35| 95.2| ************************************************************************************************************************************ DALLAS CALIF CROSSING AT ELM FORK TRINITY | 0.118 | 1,578,830.84| 171,278.96| 1,027,025.74| 65.0| CS . | | | | | | 0918-45-756 | | | | | | BR 2007(301) REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 05-15-12 WORK BEGAN- 07-23-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-14-12 | | | | | | CONTRACT WORKING DAYS- 138 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 132 PERCENT TIME USED- 95 | | | | | | | | | | | | EARTH BUILDERS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-756 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.65 | | | | ENVIRONMENTAL STANDARDS | |SUB %: 0.66 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.47 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 5.06 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.07 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.34 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.20 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.30 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 1.43 | | | | JM MATERIALS, INC. | |SUB %: 0.27 | | | | | | | | | | CONTRACT 04123206 | TOTALS | 1,578,830.84| 171,278.96| 1,027,025.74| 65.0| ************************************************************************************************************************************ DALLAS IH 35E | 7.122 | 3,252,790.31| 14,413.12| 2,397,804.16|100.0| LP 12 BONNIE VIEW RD IN DALLAS | | | | | | 0581-01-130 | | | | | | NH 2012(447) PLANE, FDR CONC PVMT AND OVERLAY | | | | | | | | | | | | WORK ORDER- 05-15-12 WORK BEGAN- 07-30-12 | | | | | | DATE WORK COMPLETED- 04-22-13 TIME COMPUTED- 07-14-12 | | | | | | CONTRACT WORKING DAYS- 134 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 130 PERCENT TIME USED- 97 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0581-01-130 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.27 | | | | MELS ELECTRIC, L.P. | |SUB %: 0.12 | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 15.73 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 3.38 | | | | ENVIRONMENTAL STANDARDS, INC. | |SUB %: 0.24 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.17 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.44 | | | | STRAIGHT LINE SAWING & SEALING | |SUB %: 0.52 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.01 | | | | | | | | | | CONTRACT 04123234 | TOTALS | 3,252,790.31| 14,413.12| 2,397,804.16|100.0| ************************************************************************************************************************************ DALLAS GREENVILLE AVENUE | 0.880 | 417,260.00| 0.00| 0.00| 0.0| IH 635 FOREST LANE | | | | | | 2374-01-170 | | | | | | IM 6356(441) FULL DEPTH CONCRETE PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 63 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SILVER CREEK CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2374-01-170 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133005 | TOTALS | 417,260.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS NORTH OF PGBT | 4.572 | 739,923.78| 0.00| 0.00| 0.0| SH 78 DALLAS / COLLIN COUNTY LINE | | | | | | 0281-03-045 | | | | | | STP 2013(532) CONC FULL DEPTH REP & PVMT MKGS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 103 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SILVER CREEK CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0281-03-045 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133015 | TOTALS | 739,923.78| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS E. ABUTMENT OF TRINITY RIVER BRIDGE | 1.535 | 2,164,097.25| 0.00| 0.00| 0.0| SH 183 IH 35E | | | | | | 0094-07-041 | | | | | | NH 2013(651) MILL,INLAY,FDRCP,PAV MRKS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 86 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0094-07-041 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133030 | TOTALS | 2,164,097.25| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS VARIOUS LOCATIONS | 0.001 | 278,458.00| 0.00| 0.00| 0.0| VA IN DALLAS DISTRICT | | | | | | 0918-00-200 | | | | | | STP 2013(534) SIGNALIZED INTERSECTION UPGRADES | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SIEMENS INDUSTRY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-200 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133208 | TOTALS | 278,458.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS VARIOUS LOCATIONS | 0.001 | 1,598,000.00| 0.00| 0.00| 0.0| VA IN DALLAS DISTRICT | | | | | | 0918-00-186 | | | | | | STP 2013(533) NON SITE SPECIFIC SIGNAL CONTRACT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 345 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DURABLE SPECIALTIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-186 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133224 | TOTALS | 1,598,000.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS IH 20 | 4.948 | 1,332,102.08| 0.00| 0.00| 0.0| IH 35E US 67 | | | | | | 0442-02-152 | | | | | | IM 0356(442) FULL DEPTH REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 117 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0442-02-152 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133231 | TOTALS | 1,332,102.08| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS I.H. 635 | 0.841 | 4,972,861.19| 536,338.96| 2,658,680.58| 53.4| IH 20 SEAGOVILLE ROAD. | | | | | | 0095-13-025 | | | | | | IM 0205(146) GRADING,PAVING,SIGNING,LANDSCAPING | | | | | | | | | | | | WORK ORDER- 06-21-12 WORK BEGAN- 10-01-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-01-12 | | | | | | CONTRACT WORKING DAYS- 147 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 141 PERCENT TIME USED- 95 | | | | | | | | | | | | HAYDON BUILDING CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0095-13-025 | | | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.68 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.00 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 1.49 | | | | S & S PAINTING | |SUB %: 0.25 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.21 | | | | AXIS CONTRACTING, INC. | |SUB %: 8.00 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.05 | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 0.47 | | | | DUSTROL, INC. | |SUB %: 0.54 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.28 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.23 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.24 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 9.28 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 2.12 | | | | THE ANCHOR GROUP, INC. | |SUB %: 0.78 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.09 | | | | COWBOY TRUCKING | |SUB %: 0.40 | | | | | | | | | | CONTRACT 05123247 | TOTALS | 4,972,861.19| 536,338.96| 2,658,680.58| 53.4| ************************************************************************************************************************************ DALLAS GARLAND AVENUE | 1.000 | 715,013.90| 0.00| 0.00| 0.0| SH 78 FIRST STREET | | | | | | 0009-02-060 | | | | | | NH 2013(664) FULL DEPTH CONC PAVMNT REPAIR. | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | O. TREVINO CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-02-060 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133009 | TOTALS | 715,013.90| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS W 8TH ST | 1.439 | 548,845.00| 0.00| 0.00| 0.0| SH 342 WINTERGREEN | | | | | | 0048-01-060 | | | | | | NH 2013(731) FULL DEPTH CONCRETE PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 63 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | WINDING ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0048-01-060 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133211 | TOTALS | 548,845.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS ON SH 289 (PRESTON) | 0.166 | 674,540.86| 0.00| 0.00| 0.0| SH 289 AT ROYAL | | | | | | 0091-06-049 | | | | | | STP 2013(727)MM INTERSECTION IMPROVEMENT | | | | | | | | | | | | DALLAS ON SH 289 | 0.010 | 44,707.50| 0.00| 0.00| 0.0| SH 289 AT ROYAL LANE | | | | | | 0091-06-055 | | | | | | STP 2012(375)MM ROW ACQ & UTIL ADJ | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 118 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | REBCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0091-06-049 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133228 | TOTALS | 719,248.36| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS US 67 | 4.363 | 6,148,723.88| 101,724.32| 1,300,157.43| 21.1| IH 35E IH 30 | | | | | | 0442-02-150 | | | | | | IM 0356(431) FULL DEPTH REPAIR AND ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 08-10-12 WORK BEGAN- 09-24-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-24-12 | | | | | | CONTRACT WORKING DAYS- 132 ADDL DAYS GRANTED- 5 | | | | | | WORKING DAYS CHARGED- 76 PERCENT TIME USED- 55 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0442-02-150 | | | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 23.72 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.37 | | | | W.O.E. CONSTRUCTION | |SUB %: 1.23 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 6.76 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.64 | | | | HALL PAVING, INC. | |SUB %: 8.93 | | | | | | | | | | CONTRACT 06123026 | TOTALS | 6,148,723.88| 101,724.32| 1,300,157.43| 21.1| ************************************************************************************************************************************ DALLAS SYLVAN AVE AT TRINITY RIVER | 0.827 | 42,157,517.98| 1,838,715.49| 19,985,111.28| 47.4| CS . | | | | | | 0918-45-669 | | | | | | BR 2004(709) REPLACE BR & APPRS | | | | | | | | | | | | DALLAS SYLVAN AVE AT TRINITY RIVER | 0.827 | 120,057.50| 0.00| 71,441.53| 59.5| CR . | | | | | | 0918-47-033 | | | | | | RW 918-47-33 ROW UTL. ADJ. | | | | | | | | | | | | WORK ORDER- 09-27-11 WORK BEGAN- 03-28-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-25-12 | | | | | | CONTRACT WORKING DAYS- 692 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 330 PERCENT TIME USED- 47 | | | | | | | | | | | | WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-669 | | | | | | ATS DRILLING, L.P. | |SUB %: 6.56 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 1.32 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.15 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.04 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.50 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.23 | | | | BRUNDAGE-BONE | |SUB %: 0.02 | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 0.27 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.02 | | | | STAR OPERATIONS, INC. | |SUB %: 3.52 | | | | EW WELLS GROUP LLC | |SUB %: 0.49 | | | | LINDAMOOD DEMOLITION, INC. | |SUB %: 0.48 | | | | GIBSON & ASSOCIATES, INC. | |SUB %: 0.03 | | | | | | | | | | CONTRACT 07113002 | TOTALS | 42,277,575.48| 1,838,715.49| 20,056,552.81| 47.4| ************************************************************************************************************************************ DALLAS DISTRICTWIDE | 0.001 | 1,556,550.00| 0.00| 289,630.67| 18.6| VA . | | | | | | 0918-00-163 | | | | | | STP 1102(197) TRAFFIC SIGNAL INSTALLATION | | | | | | | | | | | | WORK ORDER- 08-11-11 WORK BEGAN- 03-02-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-10-11 | | | | | | CONTRACT WORKING DAYS- 548 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 102 PERCENT TIME USED- 18 | | | | | | | | | | | | ROADWAY SOLUTIONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-163 | | | | | | ROADMASTER, INC. | |SUB %: 3.01 | | | | | | | | | | CONTRACT 07113231 | TOTALS | 1,556,550.00| 0.00| 289,630.67| 18.6| ************************************************************************************************************************************ DALLAS IH 20 | 4.133 | 3,883,284.25| 31,974.00| 2,847,599.97| 73.3| SP 408 LP 12 | | | | | | 3000-01-021 | | | | | | NH 1102(388) FULL DPTH CONC RPR AND OVRLY | | | | | | | | | | | | WORK ORDER- 08-17-11 WORK BEGAN- 10-03-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-03-11 | | | | | | CONTRACT WORKING DAYS- 133 ADDL DAYS GRANTED- 97 | | | | | | WORKING DAYS CHARGED- 226 PERCENT TIME USED- 98 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3000-01-021 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.19 | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 5.97 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.48 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.24 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.43 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 4.18 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 2.43 | | | | PENHALL COMPANY | |SUB %: 14.82 | | | | | | | | | | CONTRACT 07113267 | TOTALS | 3,883,284.25| 31,974.00| 2,847,599.97| 73.3| ************************************************************************************************************************************ DALLAS AT INTERCHANGE WITH PRES GEORGE | 1.395 | 179,236,396.32| 23,531.64| 181,165,071.32| 99.9| IH 30 BUSH TOLLWAY IN GARLAND | | | | | | 0009-11-210 | | | | | | BOR 2005(995) GR, STR, PVMT, SIGNS | | | | | | | | | | | | DALLAS AT INTRCHG PRES. GEORGE BUSH TOLLWY | 1.395 | 740,589.39| 0.00| 1,267,447.58| 99.9| IH 30 IN GARLAND | | | | | | 0009-11-214 | | | | | | RW 9-11-214 ROW ACQ., UTIL. ADJ.; RELOC ASSIST | | | | | | | | | | | | WORK ORDER- 10-23-08 WORK BEGAN- 12-10-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-08-08 | | | | | | CONTRACT WORKING DAYS- 972 ADDL DAYS GRANTED- 309 | | | | | | WORKING DAYS CHARGED- 1,225 PERCENT TIME USED- 95 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-11-210 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.05 | | | | USA EROSION, INC. | |SUB %: 0.44 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.10 | | | | ATS DRILLING, L.P. | |SUB %: 11.21 | | | | DYWIDAG-SYSTEMS INTERNATIONAL_USA,INC. | |SUB %: 0.14 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.32 | | | | S & S BRIDGE PAINTING, INC. | |SUB %: 0.06 | | | | SITESAFE PRODUCTS TEXAS | |SUB %: 0.16 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 1.11 | | | | TREVCON, INC. | |SUB %: 1.27 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.29 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.25 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 6.03 | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 3.02 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 1.37 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.16 | | | | NORTH TEXAS TRUCKING, INC. | |SUB %: 0.19 | | | | STAR OPERATIONS, INC. | |SUB %: 3.09 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 0.36 | | | | TEXAS STAR TRANSPORT, LP | |SUB %: 0.12 | | | | TEXAS MANHOLES COMPANY, INC. | |SUB %: 0.00 | | | | SKAGGS ROAD BORING INC. | |SUB %: 0.00 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 0.23 | | | | DOWN UNDER CONSTRUCTION | |SUB %: 0.01 | | | | GHR CONCRETE, INC. | |SUB %: 0.00 | | | | WALKER CONSTRUCTION | |SUB %: 0.00 | | | | CONDUIT CONSTRUCTORS | |SUB %: 0.23 | | | | CONDUIT CONSTRUCTORS | |SUB %: 0.07 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.01 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.00 | | | | | | | | | | CONTRACT 08083004 | TOTALS | 179,976,985.71| 23,531.64| 182,432,518.90| 99.9| ************************************************************************************************************************************ DALLAS W. LAWTHER DRIVE | 0.785 | 28,349,251.84| 83,444.15| 29,639,088.79| 99.9| LP 12 EAST OF GOFORTH DRIVE | | | | | | 0353-05-084 | | | | | | NH 2008(361) GRADING, STRS, ACP, SIGNING, PAVT M | | | | | | | | | | | | DALLAS W. LAWTHER DRIVE | 0.785 | 3,131,109.30| 0.00| 3,096,998.56| 98.9| LP 12 EAST OF GOFORTH DRIVE | | | | | | 0353-05-110 | | | | | | RW 353-5-110 ROW UTL. ADJ. IN CONSTRUCTION | | | | | | | | | | | | WORK ORDER- 10-22-08 WORK BEGAN- 11-17-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-20-09 | | | | | | CONTRACT WORKING DAYS- 533 ADDL DAYS GRANTED- 69 | | | | | | WORKING DAYS CHARGED- 618 PERCENT TIME USED- 102 | | | | | | | | | | | | REBCON, INC. | | | | | | CONCHO CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0353-05-084 | | | | | | ARK CONTRACTING SERVICES, LLC | |SUB %: 1.88 | | | | AUSTIN BRIDGE & ROAD, LP | |SUB %: 1.88 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.60 | | | | TEXAS SHAFTS, INC. | |SUB %: 5.55 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.12 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.00 | | | | DGI-MENARD, INC. | |SUB %: 0.55 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.38 | | | | MIKE ALBERT, INC. | |SUB %: 10.64 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.05 | | | | WEIR BROS., INC. | |SUB %: 5.05 | | | | ENVIRONMENTAL STANDARDS | |SUB %: 1.85 | | | | STAR OPERATIONS, INC. | |SUB %: 2.94 | | | | RG PAINTING | |SUB %: 0.22 | | | | J.R. DAVIS AND ASSOCIATES, INC. | |SUB %: 1.86 | | | | WEST TEXAS REBAR PLACERS INC. | |SUB %: 0.00 | | | | EAGLE AGGREGATE TRANSPORTATION, LLC. | |SUB %: 0.00 | | | | SALDANA'S TRUCKING COMPANY, INC. | |SUB %: 0.22 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.04 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.07 | | | | TEXAS INLETS, INC. | |SUB %: 0.29 | | | | SKAGGS ROAD BORING INC. | |SUB %: 0.12 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.17 | | | | | | | | | | CONTRACT 08083217 | TOTALS | 31,480,361.14| 83,444.15| 32,736,087.35| 99.9| ************************************************************************************************************************************ DALLAS NORTH OF IH 20 | 0.994 | 3,685,288.00| 0.00| 3,356,904.11| 92.6| US 67 SOUTH OF RED BIRD LN | | | | | | 0261-03-053 | | | | | | NH 2011(346) SUBGRADE,ACP BASE,CONC PAV STR | | | | | | | | | | | | WORK ORDER- 10-20-10 WORK BEGAN- 02-14-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 11-05-10 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 172 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 244 PERCENT TIME USED- 141 | |**************************************************| | | | | | | | ARK CONTRACTING SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0261-03-053 | | | | | | BUYER BARRICADES | |SUB %: 1.22 | | | | MCMAHON CONTRACTING, L.P. | |SUB %: 13.34 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.41 | | | | ANDREWS PAVING & CONSTRUCTION | |SUB %: 8.00 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.32 | | | | S & V CONSTRUCTION LLC | |SUB %: 3.75 | | | | SUPREME SAWING AND SEALING | |SUB %: 0.09 | | | | D.E.E.R. TRUCKING, LLC | |SUB %: 1.26 | | | | SCIENTIFIC CONSTRUCTION GROUP, INC. | |SUB %: 1.13 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.91 | | | | J-N CONSTRUCTION COMPANY, INC. | |SUB %: 7.89 | | | | J. LIFESTYLES | |SUB %: 0.10 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.00 | | | | N.L. SCHUTTE FOUNDATION DRILLING, INC. | |SUB %: 0.83 | | | | CONCRETE PENETRATING CO. | |SUB %: 0.28 | | | | TEXAS UTI, LLC | |SUB %: 0.04 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 1.06 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.81 | | | | DUSTROL, INC. | |SUB %: 0.20 | | | | AUGER DRILLING, INC. | |SUB %: 0.13 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.01 | | | | MICA CORPORATION | |SUB %: 0.65 | | | | | | | | | | CONTRACT 08103034 | TOTALS | 3,685,288.00| 0.00| 3,356,904.11| 92.6| ************************************************************************************************************************************ DALLAS VARIOUS ON SYSTEM LOCATIONS | 0.001 | 609,207.67| 8,885.52| 522,736.31| 85.8| VA . | | | | | | 0918-45-881 | | | | | | NH 2011(318) REFURBISH BPA'S | | | | | | | | | | | | WORK ORDER- 09-13-10 WORK BEGAN- 05-31-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-12-11 | | | | | | CONTRACT WORKING DAYS- 300 ADDL DAYS GRANTED- 15 | | | | | | WORKING DAYS CHARGED- 286 PERCENT TIME USED- 90 | | | | | | | | | | | | HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-881 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08103300 | TOTALS | 609,207.67| 8,885.52| 522,736.31| 85.8| ************************************************************************************************************************************ DALLAS AT IH 45 RAMP FROM EB IH 20 | 1.418 | 5,699,998.00| 35,425.81| 3,939,129.03| 69.1| IH 20 NB IH 45 | | | | | | 2374-03-057 | | | | | | IM 0205(151) ADD LANE TO DIRECT CONNECTION RAMP | | | | | | | | | | | | WORK ORDER- 10-07-11 WORK BEGAN- 01-12-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-06-11 | | | | | | CONTRACT WORKING DAYS- 471 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 277 PERCENT TIME USED- 58 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2374-03-057 | | | | | | ALLIANCE GEOTECHNICAL GROUP | |SUB %: 0.00 | | | | AXIS CONTRACTING, INC. | |SUB %: 1.14 | | | | BREDA COMPANY, INC. | |SUB %: 0.96 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.71 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.26 | | | | DUSTIN ALLEN, INC. | |SUB %: 1.41 | | | | DUSTROL, INC. | |SUB %: 0.87 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 1.05 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.55 | | | | LANDSCAPE CONTRACTING AND IRRIGATION, INC. | |SUB %: 1.12 | | | | MELS ELECTRIC, L.P. | |SUB %: 0.34 | | | | RG PAINTING | |SUB %: 0.00 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.93 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.06 | | | | ERWIN STEEL WORKS, LLC | |SUB %: 0.11 | | | | RG PAINTING | |SUB %: 0.39 | | | | MAGNUM SAWING | |SUB %: 0.34 | | | | D & D STUD WELDING | |SUB %: 0.17 | | | | | | | | | | CONTRACT 08113245 | TOTALS | 5,699,998.00| 35,425.81| 3,939,129.03| 69.1| ************************************************************************************************************************************ DALLAS SOUTH OF BECKLEY AVE | 1.865 | 689,823.67| 67,481.76| 600,594.02| 87.0| IH 35E NORTH OF COLORADO BLVD | | | | | | 0442-02-151 | | | | | | IM 0356(433) FULL DEPTH REPAIR | | | | | | | | | | | | WORK ORDER- 09-24-12 WORK BEGAN- 01-02-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-23-12 | | | | | | CONTRACT WORKING DAYS- 89 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 79 PERCENT TIME USED- 88 | | | | | | | | | | | | SILVER CREEK CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0442-02-151 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.31 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 8.43 | | | | COWBOY TRUCKING | |SUB %: 0.94 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.70 | | | | MELS ELECTRIC, L.P. | |SUB %: 1.41 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 1.91 | | | | | | | | | | CONTRACT 08123217 | TOTALS | 689,823.67| 67,481.76| 600,594.02| 87.0| ************************************************************************************************************************************ DALLAS DISTRICTWIDE | 0.001 | 690,174.50| 0.00| 329,930.46| 47.8| VA (ON-SYSTEM) | | | | | | 0918-00-156 | | | | | | STP 2010(038) ASBESTOS ABATEMENT ON BRIDGES | | | | | | | | | | | | WORK ORDER- 10-06-09 WORK BEGAN- 01-04-10 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-22-09 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 252 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 218 PERCENT TIME USED- 86 | |**************************************************| | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-156 | | | | | | 1 PRIORITY ENVIRONMENTAL SERVICES, INC. | |SUB %: 60.27 | | | | | | | | | | CONTRACT 09093038 | TOTALS | 690,174.50| 0.00| 329,930.46| 47.8| ************************************************************************************************************************************ DALLAS EAST OF CENTERVILLE RD. | 1.288 | 7,718,650.04| 2,145.40| 6,075,107.34| 79.3| IH 635 NORTHWEST HIGHWAY | | | | | | 2374-02-124 | | | | | | C 2374-2-124 GR, PVMT, SIGNS, PVMT MRKGS | | | | | | | | | | | | WORK ORDER- 10-12-09 WORK BEGAN- 04-05-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-10-10 | | | | | | CONTRACT WORKING DAYS- 459 ADDL DAYS GRANTED- 15 | | | | | | WORKING DAYS CHARGED- 521 PERCENT TIME USED- 109 | | | | | | | | | | | | GLENN THURMAN, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2374-02-124 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.26 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 7.66 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.06 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 0.63 | | | | AMERICAN INTELOCK & MODULAR CONSTRUCTION, INC. | |SUB %: 4.79 | | | | DT CONSTRUCTION SERVICES | |SUB %: 0.52 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.77 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.92 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.21 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.54 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 5.14 | | | | CRAIG OLDEN, INC. | |SUB %: 1.40 | | | | LARRETT, INC. | |SUB %: 21.33 | | | | CB SERVICES, INC. | |SUB %: 1.91 | | | | MIKE ALBERT, INC. | |SUB %: 6.03 | | | | | | | | | | CONTRACT 09093060 | TOTALS | 7,718,650.04| 2,145.40| 6,075,107.34| 79.3| ************************************************************************************************************************************ DALLAS GALATYN PARKWAY EXTENSION FROM US75 | 0.169 | 2,999,312.68| 181,128.00| 2,546,333.30| 86.2| CS PALISADES BLVD IN RICHARDSON | | | | | | 0918-45-821 | | | | | | CM 2007(892) ROADWAY EXTENSION | | | | | | | | | | | | DALLAS GALATYN PARKWAY EXTENSION FROM US75 | 0.027 | 63,229.80| 0.00| 19,228.40| 30.4| VA PALISADES BLVD IN RICHARDSON | | | | | | 0918-47-009 | | | | | | CC 918-47-9 ROW UTL. ADJ. | | | | | | | | | | | | WORK ORDER- 11-09-11 WORK BEGAN- 01-11-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-03-12 | | | | | | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 13 | | | | | | WORKING DAYS CHARGED- 334 PERCENT TIME USED- 118 | | | | | | | | | | | | REBCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-821 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.39 | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 6.01 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.18 | | | | N.L. SCHUTTE FOUNDATION DRILLING, INC. | |SUB %: 0.48 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.17 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.37 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.40 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 5.23 | | | | ROAD MASTER STRIPING LLC | |SUB %: 0.77 | | | | WEST TEXAS REBAR PLACERS INC. | |SUB %: 1.07 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.07 | | | | | | | | | | CONTRACT 09113011 | TOTALS | 3,062,542.48| 181,128.00| 2,565,561.70| 85.1| ************************************************************************************************************************************ DALLAS COMMERCE ST | 1.566 | 402,995.80| 0.00| 230,128.83| 57.1| IH 35E OAKLAWN AVE | | | | | | 0196-03-257 | | | | | | IM 0356(436) FULL DEPTH REPAIR | | | | | | | | | | | | WORK ORDER- 10-18-12 WORK BEGAN- 11-12-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 11-12-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 41 ADDL DAYS GRANTED- 5 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 22 PERCENT TIME USED- 47 | |**************************************************| | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0196-03-257 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.63 | | | | ARTEX ELECTRIC, INC. | |SUB %: 2.13 | | | | PENHALL COMPANY | |SUB %: 2.14 | | | | J. MUNOZ TRUCKING | |SUB %: 3.47 | | | | | | | | | | CONTRACT 09123026 | TOTALS | 402,995.80| 0.00| 230,128.83| 57.1| ************************************************************************************************************************************ DALLAS AT RIVERSIDE DRIVE | 0.250 | 114,283.74| 1,450.73| 81,355.02| 71.1| SP 348 IN IRVING | | | | | | 0353-04-093 | | | | | | NH 2013(009) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 10-12-12 WORK BEGAN- 11-14-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-28-12 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 41 PERCENT TIME USED- 91 | | | | | | | | | | | | DENALI CONSTRUCTION SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0353-04-093 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 2.83 | | | | AQUA BORE | |SUB %: 3.62 | | | | TRI DAL UTILITIES, LTD. | |SUB %: 2.18 | | | | BRENDA PRICE TRUCKING | |SUB %: 1.82 | | | | | | | | | | CONTRACT 09123207 | TOTALS | 114,283.74| 1,450.73| 81,355.02| 71.1| ************************************************************************************************************************************ DALLAS AT SH 352 (COLLINS RD) SUNNYVALE | 0.812 | 24,968,164.67| 0.00| 24,381,818.03| 99.9| US 80 . | | | | | | 0095-02-100 | | | | | | STP 2009(022)MM RECONSTRUCT, GRADING,BASE,PAVING | | | | | | | | | | | | WORK ORDER- 01-05-09 WORK BEGAN- 01-21-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-21-09 | | | | | | CONTRACT WORKING DAYS- 560 ADDL DAYS GRANTED- 35 | | | | | | WORKING DAYS CHARGED- 900 PERCENT TIME USED- 151 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0095-02-100 | | | | | | CRAIG OLDEN, INC. | |SUB %: 4.95 | | | | USA EROSION, INC. | |SUB %: 0.26 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.16 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 0.94 | | | | PREMIER PAVING, LTD. | |SUB %: 18.93 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.06 | | | | TEXAS SHAFTS, INC. | |SUB %: 1.20 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.55 | | | | ROADWAY SOLUTIONS, INC. | |SUB %: 1.75 | | | | BREDA COMPANY, INC. | |SUB %: 0.39 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.39 | | | | RAMBO CONTRACTING, INC. | |SUB %: 0.34 | | | | BEAR CREEK CONSTRUCTION, LLC | |SUB %: 0.23 | | | | FARR FOUNDATION, INC. | |SUB %: 0.18 | | | | STAR OPERATIONS, INC. | |SUB %: 0.17 | | | | | | | | | | CONTRACT 10083201 | TOTALS | 24,968,164.67| 0.00| 24,381,818.03| 99.9| ************************************************************************************************************************************ DALLAS DISTRICTWIDE | 0.001 | 1,255,000.00| 37,240.25| 1,137,545.18| 90.6| VA . | | | | | | 0918-00-161 | | | | | | STP 2011(467)ES TRAFFIC SIGNAL INSTALLATION | | | | | | | | | | | | WORK ORDER- 11-16-10 WORK BEGAN- 03-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-14-10 | | | | | | CONTRACT WORKING DAYS- 548 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 421 PERCENT TIME USED- 76 | | | | | | | | | | | | DURABLE SPECIALTIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-161 | | | | | | ROADMASTER, INC. | |SUB %: 2.73 | | | | | | | | | | CONTRACT 10103011 | TOTALS | 1,255,000.00| 37,240.25| 1,137,545.18| 90.6| ************************************************************************************************************************************ DALLAS ASH LN. | 2.134 | 170,413.86| 52,822.57| 80,103.22|100.0| SH 352 SPRING AVE. | | | | | | 0197-01-011 | | | | | | NH 2013(096) FULL DEPTH CONCRETE PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 11-09-12 WORK BEGAN- 03-13-13 | | | | | | DATE WORK COMPLETED- 05-06-13 TIME COMPUTED- 01-08-13 | | | | | | CONTRACT WORKING DAYS- 26 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 26 PERCENT TIME USED- 100 | | | | | | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0197-01-011 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10123010 | TOTALS | 170,413.86| 52,822.57| 80,103.22|100.0| ************************************************************************************************************************************ DALLAS ELLIS COUNTY LINE | 8.823 | 541,244.57| 0.00| 31,197.30| 5.7| US 67 WHEATLAND RD | | | | | | 0261-02-072 | | | | | | NH 2013(098) FDRCP AND HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 11-09-12 WORK BEGAN- 12-04-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-25-12 | | | | | | CONTRACT WORKING DAYS- 61 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 4 PERCENT TIME USED- 6 | | | | | | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0261-02-072 | | | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 34.91 | | | | W.O.E. CONSTRUCTION | |SUB %: 2.02 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 2.08 | | | | COWBOY TRUCKING | |SUB %: 0.00 | | | | XTREEME SAWING & SEALING, INC. | |SUB %: 0.49 | | | | | | | | | | CONTRACT 10123016 | TOTALS | 541,244.57| 0.00| 31,197.30| 5.7| ************************************************************************************************************************************ DALLAS 0.5 MILES WEST OF WESTMORELAND RD | 0.574 | 2,655,000.00| 380,822.21| 753,556.80| 28.3| IH 30 EAST OF WESTMORELAND RD | | | | | | 1068-04-153 | | | | | | C 1068-4-153 GRADING,PAVEMENT,SIGNS,PVMT MKGS | | | | | | | | | | | | WORK ORDER- 01-04-13 WORK BEGAN- 01-22-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-20-13 | | | | | | CONTRACT WORKING DAYS- 128 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 69 PERCENT TIME USED- 53 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1068-04-153 | | | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 8.60 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.57 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.25 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.72 | | | | BREDA COMPANY, INC. | |SUB %: 0.77 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 3.56 | | | | MELS ELECTRIC, L.P. | |SUB %: 6.28 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.64 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.27 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.18 | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 3.16 | | | | | | | | | | CONTRACT 10123213 | TOTALS | 2,655,000.00| 380,822.21| 753,556.80| 28.3| ************************************************************************************************************************************ DALLAS VALLEY VIEW LANE | 3.390 | 1,743,690.74| 67,612.85| 67,612.85| 3.8| IH 35E WHITLOCK LN/SANDY LAKE ROAD | | | | | | 0196-03-259 | | | | | | IM 0356(435) FULL DEP REP AND OV | | | | | | | | | | | | WORK ORDER- 12-12-12 WORK BEGAN- 04-08-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-10-13 | | | | | | CONTRACT WORKING DAYS- 119 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 39 PERCENT TIME USED- 32 | | | | | | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0196-03-259 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 4.97 | | | | DUSTROL, INC. | |SUB %: 4.56 | | | | COWBOY TRUCKING | |SUB %: 5.07 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 64.98 | | | | BUYERS BARRICADES, INC. | |SUB %: 0.96 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.80 | | | | A BROTHERS MILLING, LLC | |SUB %: 3.68 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.29 | | | | | | | | | | CONTRACT 10123229 | TOTALS | 1,743,690.74| 67,612.85| 67,612.85| 3.8| ************************************************************************************************************************************ DALLAS LAKERIDGE PKWY, S OF GREAT SW PKWY | 1.968 | 15,998,353.47| 349,451.47| 12,437,495.17| 77.7| CS IH 20 EB FRTG ROAD | | | | | | 0918-45-747 | | | | | | STP 2011(413)MM GR, STRS AND PVT | | | | | | | | | | | | WORK ORDER- 01-10-11 WORK BEGAN- 02-28-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-26-11 | | | | | | CONTRACT WORKING DAYS- 366 ADDL DAYS GRANTED- 293 | | | | | | WORKING DAYS CHARGED- 543 PERCENT TIME USED- 82 | | | | | | | | | | | | LONE STAR CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-747 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.54 | | | | PREMIER PAVING, LTD. | |SUB %: 9.76 | | | | A.M.S. COMPANY, INC. | |SUB %: 7.39 | | | | TEXAS STAR TRANSPORT, LP | |SUB %: 2.21 | | | | DENALI SERVICES, L.P. | |SUB %: 0.22 | | | | ALLIANCE TRUCKING | |SUB %: 0.59 | | | | SUPREME SAWING AND SEALING | |SUB %: 0.04 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 2.14 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.46 | | | | UNDERGROUND COALITION, INC. | |SUB %: 5.46 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.17 | | | | THURMAN TRANSPORTATION, INC. | |SUB %: 0.36 | | | | TRYMOR TRUCKING, INC. | |SUB %: 0.14 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 4.31 | | | | TCB FOUNDATION DRILLERS, INC. | |SUB %: 0.58 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 1.78 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.30 | | | | JM MATERIALS, INC. | |SUB %: 0.14 | | | | A BROTHERS MILLING, LLC | |SUB %: 0.06 | | | | TEXAS MANHOLES COMPANY, INC. | |SUB %: 0.03 | | | | | | | | | | CONTRACT 11103001 | TOTALS | 15,998,353.47| 349,451.47| 12,437,495.17| 77.7| ************************************************************************************************************************************ DALLAS AT HIDDEN RIDGE | 0.380 | 831,383.79| 51,322.54| 1,297,345.04| 99.9| SH 114 IN CITY OF IRVING | | | | | | 0353-06-056 | | | | | | NH 2011(574) TCP,EARTHWORK,SHORING AND MSE WALL | | | | | | | | | | | | WORK ORDER- 01-06-11 WORK BEGAN- 04-02-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-07-11 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 169 | | | | | | WORKING DAYS CHARGED- 228 PERCENT TIME USED- 99 | | | | | | | | | | | | REBCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0353-06-056 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.49 | | | | FORTSON CONTRACTING, INC. | |SUB %: 6.32 | | | | SOUTH TEXAS INDUSTRIAL COATINGS, L.L.C. | |SUB %: 0.20 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 3.02 | | | | WEST TEXAS REBAR PLACERS INC. | |SUB %: 1.32 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.24 | | | | | | | | | | CONTRACT 12103005 | TOTALS | 831,383.79| 51,322.54| 1,297,345.04| 99.9| ************************************************************************************************************************************ DALLAS BELT LINE RD. IN GRAND PRAIRIE | 0.767 | 7,282,375.53| 696,599.13| 6,105,645.04| 83.8| IH 30 N.E. 15TH ST. | | | | | | 1068-04-142 | | | | | | STP 2011(706)MM GR, STR, PVMT, SIGNS, BUILDING | | | | | | | | | | | | DALLAS BELT LINE RD. | 2.060 | 7,497,722.23| 41,876.37| 5,469,042.47| 72.9| IH 30 MACARTHUR BLVD. | | | | | | 1068-04-145 | | | | | | C 1068-4-145 GR, STR, PVMT, SIGNS | | | | | | | | | | | | WORK ORDER- 02-15-11 WORK BEGAN- 04-22-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-16-11 | | | | | | CONTRACT WORKING DAYS- 491 ADDL DAYS GRANTED- 194 | | | | | | WORKING DAYS CHARGED- 499 PERCENT TIME USED- 72 | | | | | | | | | | | | HAYDON BUILDING CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1068-04-142 | | | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.09 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.81 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 5.65 | | | | BUYERS BARRICADES, INC. | |SUB %: 0.04 | | | | THE ANCHOR GROUP, INC. | |SUB %: 0.38 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.06 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.19 | | | | FARR FOUNDATION, INC. | |SUB %: 6.20 | | | | GK CONSTRUCTION, LLC | |SUB %: 0.66 | | | | C.T. AND S. METALWORKS, INC. | |SUB %: 1.72 | | | | CENTRAL NORTH CONSTRUCTION, LLC | |SUB %: 2.17 | | | | STAR OPERATIONS, INC. | |SUB %: 3.43 | | | | MCMAHON CONTRACTING, L.P. | |SUB %: 20.81 | | | | STRIPE-A-ZONE, INC. | |SUB %: 0.61 | | | | ALLIANCE GEOTECHNICAL GROUP | |SUB %: 0.15 | | | | PIBURN & CARSON, LLC | |SUB %: 0.50 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 0.15 | | | | COWBOY TRUCKING | |SUB %: 0.13 | | | | RMI WORLDWIDE, LLC | |SUB %: 0.05 | | | | LONE STAR HIGHWAY PRODUCTS, INC. | |SUB %: 2.50 | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 0.45 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.02 | | | | SUPREME SAWING AND SEALING | |SUB %: 0.24 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.09 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.05 | | | | L & E HART ENTERPRISES, INC. | |SUB %: 2.20 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.03 | | | | | | | | | | CONTRACT 12103201 | TOTALS | 14,780,097.76| 738,475.50| 11,574,687.51| 78.3| ************************************************************************************************************************************ DALLAS ON GUS THOMASSON IN MESQUITE | 0.341 | 352,665.27| 1,700.56| 316,681.50| 89.7| CS FROM N. OF TOWN EAST TO N. MESQUITE | | | | | | 0918-45-816 | | | | | | CM 2008(398) GR, PVMT, SDWLKS, SIGNAL | | | | | | | | | | | | WORK ORDER- 02-08-12 WORK BEGAN- 04-13-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-08-12 | | | | | | CONTRACT WORKING DAYS- 52 ADDL DAYS GRANTED- 3 | | | | | | WORKING DAYS CHARGED- 52 PERCENT TIME USED- 94 | | | | | | | | | | | | KEN-DO CONTRACTING, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-816 | | | | | | MELS ELECTRIC, L.P. | |SUB %: 25.15 | | | | IOWA BRIDGE & CULVERT, LC | |SUB %: 7.56 | | | | A & A CONSTRUCTION | |SUB %: 1.87 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 2.21 | | | | BTA SERVICES, LTD. | |SUB %: 2.23 | | | | LUIS CHAPA | |SUB %: 0.61 | | | | RICE TUNNELING & BORING, INC. | |SUB %: 2.38 | | | | HOLY BROS SERVICES LP | |SUB %: 0.94 | | | | ALLIANCE TRUCKING | |SUB %: 2.83 | | | | | | | | | | CONTRACT 12113007 | TOTALS | 352,665.27| 1,700.56| 316,681.50| 89.7| ************************************************************************************************************************************ DALLAS DISTRICTWIDE | 0.001 | 883,958.00| 29,642.25| 355,455.20| 40.2| VA . | | | | | | 0918-00-160 | | | | | | C 918-00-160 SIGN AND SIGN STRUCTURE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 02-10-12 WORK BEGAN- 06-19-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-19-12 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 30 | | | | | | WORKING DAYS CHARGED- 145 PERCENT TIME USED- 36 | | | | | | | | | | | | TIME STRIPING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-160 | | | | | | GIBSON & ASSOCIATES, INC. | |SUB %: 3.84 | | | | FORTSON CONTRACTING, INC. | |SUB %: 2.27 | | | | LONG FOUNDATION DRILLING | |SUB %: 0.49 | | | | | | | | | | CONTRACT 12113212 | TOTALS | 883,958.00| 29,642.25| 355,455.20| 40.2| ************************************************************************************************************************************ DALLAS ON PLEASANT RUN RD, E OF SUNRISE RD | 0.759 | 7,719,831.64| 47,851.73| 47,851.73| 0.6| CS WEST OF IH 45 | | | | | | 0918-45-844 | | | | | | HP 2010(854) GRD, STR, PVMT, SIGNS | | | | | | | | | | | | WORK ORDER- 04-03-13 WORK BEGAN- 04-22-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-22-13 | | | | | | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | RAGLE CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-844 | | | | | | MCL CONTRACTING, LLC | |SUB %: 1.04 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 1.55 | | | | S & S BRIDGE PAINTING, INC. | |SUB %: 0.12 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.07 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.51 | | | | IOWA BRIDGE & CULVERT, LC | |SUB %: 0.32 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.19 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.07 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.10 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 8.07 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.58 | | | | COWBOY TRUCKING | |SUB %: 0.00 | | | | | | | | | | CONTRACT 12123014 | TOTALS | 7,719,831.64| 47,851.73| 47,851.73| 0.6| ************************************************************************************************************************************ DALLAS SH 78 | 2.157 | 1,070,331.10| 203,415.72| 203,415.72| 19.0| LP 12 SPUR 244 | | | | | | 0581-01-134 | | | | | | NH 2013(259) FULL DPTH REP, MILL & ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 01-29-13 WORK BEGAN- 04-08-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-30-13 | | | | | | CONTRACT WORKING DAYS- 63 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 18 PERCENT TIME USED- 28 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0581-01-134 | | | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 20.86 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 12.00 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.35 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 5.21 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.18 | | | | MEL"S ELECTRIC SERVICE, INC. | |SUB %: 0.95 | | | | W.O.E. CONSTRUCTION | |SUB %: 1.24 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.00 | | | | | | | | | | CONTRACT 12123027 | TOTALS | 1,070,331.10| 203,415.72| 203,415.72| 19.0| ************************************************************************************************************************************ TARRANT 0.5 MILES WEST OF N. FIELDER ROAD | 6.091 | 6,960,302.24| 284,447.95| 291,188.75| 4.1| IH 30 DALLAS/TARRANT COUNTY LINE | | | | | | 1068-02-135 | | | | | | C 1068-2-135 ITS, ETC, SIGNS | | | | | | | | | | | | DALLAS TARRANT/DALLAS COUNTY LINE | 12.664 | 56,121,468.07| 3,682,973.93| 4,236,018.87| 7.5| IH 30 SYLVAN AVE. | | | | | | 1068-04-147 | | | | | | IM 0305(082) STR, GR, PVMT, PVMT MKGS, SIGNS,ITS | | | | | | | | | | | | WORK ORDER- 02-28-13 WORK BEGAN- 03-25-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-16-13 | | | | | | CONTRACT WORKING DAYS- 728 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 27 PERCENT TIME USED- 3 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1068-04-147 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.04 | | | | THE ANCHOR GROUP, INC. | |SUB %: 0.02 | | | | ANTIGO CONSTRUCTION, INC. | |SUB %: 0.02 | | | | DUSTROL, INC. | |SUB %: 0.33 | | | | DUSTIN ALLEN, INC. | |SUB %: 0.41 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.02 | | | | GUIDO CONSTRUCTION, INC. DBA GUIDO"S TRUCKS | |SUB %: 0.09 | | | | PENHALL COMPANY | |SUB %: 0.06 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.13 | | | | VSTRUCTURAL LLC | |SUB %: 0.42 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.12 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.64 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.08 | | | | MICA CORPORATION | |SUB %: 19.67 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 2.65 | | | | K & S UTILITY CONTRACTORS, INC. | |SUB %: 4.66 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.56 | | | | PRESSURE CLEANING SERVICE, INC. DBA WATERBLASTING.COM | |SUB %: 0.06 | | | | RAMBO CONTRACTING, INC. | |SUB %: 1.19 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.13 | | | | HERDEZ TRUCKING, INC. | |SUB %: 0.09 | | | | | | | | | | CONTRACT 12123201 | TOTALS | 63,081,770.31| 3,967,421.88| 4,527,207.62| 7.1| ************************************************************************************************************************************ DALLAS SPUR 408 | 2.846 | 1,270,329.41| 151,787.97| 1,132,151.09| 89.1| LP 12 IH 30 | | | | | | 0581-02-134 | | | | | | NH 2013(260) REFURBISH ILLUMINATION | | | | | | | | | | | | WORK ORDER- 02-08-13 WORK BEGAN- 02-25-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-25-13 | | | | | | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 38 PERCENT TIME USED- 36 | | | | | | | | | | | | MICA CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0581-02-134 | | | | | | DYNAMIC VISION CO., INC. | |SUB %: 9.01 | | | | | | | | | | CONTRACT 12123212 | TOTALS | 1,270,329.41| 151,787.97| 1,132,151.09| 89.1| ************************************************************************************************************************************ DENTON W. OF CHIN CHAPEL | 1.369 | 5,419,912.44| 201,466.15| 5,189,609.35| 95.7| FM 407 W. OF BRIARHILL BLVD. | | | | | | 1950-01-026 | | | | | | C 1950-1-26 GRADING, STRUCTURES, BAND AND SURF | | | | | | | | | | | | WORK ORDER- 02-16-10 WORK BEGAN- 09-21-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-17-10 | | | | | | CONTRACT WORKING DAYS- 300 ADDL DAYS GRANTED- 189 | | | | | | WORKING DAYS CHARGED- 397 PERCENT TIME USED- 81 | | | | | | | | | | | | TISEO PAVING CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1950-01-026 | | | | | | AXIS CONTRACTING, INC. | |SUB %: 1.90 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.38 | | | | BUYERS BARRICADES, INC. | |SUB %: 0.52 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 1.95 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.02 | | | | IOWA BRIDGE & CULVERT, LC | |SUB %: 1.45 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 17.25 | | | | STRIPE-A-ZONE, INC. | |SUB %: 1.19 | | | | T & R EXCAVATION, INC. | |SUB %: 21.56 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.21 | | | | TOMAS REYES TRUCKING, INC. | |SUB %: 2.93 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.14 | | | | TEXAS INLETS, INC. | |SUB %: 3.48 | | | | DUSTROL, INC. | |SUB %: 3.03 | | | | | | | | | | CONTRACT 01103007 | TOTALS | 5,419,912.44| 201,466.15| 5,189,609.35| 95.7| ************************************************************************************************************************************ DENTON NORTH OF BUS 114 | 1.649 | 33,333,333.33| 338,990.08| 30,247,955.62| 90.7| SH 114 WEST OF TROPHY CLUB DR | | | | | | 0353-02-060 | | | | | | C 353-2-60 GR, STRS, BASE & SURF | | | | | | | | | | | | WORK ORDER- 02-15-11 WORK BEGAN- 03-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-14-11 | | | | | | CONTRACT WORKING DAYS- 650 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 540 PERCENT TIME USED- 83 | | | | | | | | | | | | SEMA CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0353-02-060 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.09 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 1.12 | | | | INTERSTATE FOUNDATION, LLC | |SUB %: 0.87 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.06 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.73 | | | | WRIGHT CONSTRUCTION CO., INC. | |SUB %: 11.11 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.20 | | | | J. E. GUZMAN CONSTRUCTION, INC. | |SUB %: 0.82 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 1.69 | | | | THE LANE CONSTRUCTION CORPORATION | |SUB %: 7.26 | | | | CRAIG OLDEN, INC. | |SUB %: 0.95 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.02 | | | | S & V CONSTRUCTION LLC | |SUB %: 1.33 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.24 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.02 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.65 | | | | CHOCTAW ERECTORS, INC. | |SUB %: 1.30 | | | | GLENN THURMAN, INC. | |SUB %: 15.64 | | | | VSTRUCTURAL LLC | |SUB %: 0.08 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.14 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.07 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 1.27 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.58 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.14 | | | | | | | | | | CONTRACT 01113205 | TOTALS | 33,333,333.33| 338,990.08| 30,247,955.62| 90.7| ************************************************************************************************************************************ DENTON VARIOUS LOCATIONS ON STATE HIGHWAYS | 0.001 | 1,930,243.96| 0.00| 0.00| 0.0| VA IN DENTON COUNTY | | | | | | 0918-46-263 | | | | | | STP 2013(385) CONSTRUCT CURB RAMPS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 288 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-46-263 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133011 | TOTALS | 1,930,243.96| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DENTON 0.2 MILES SOUTH OF EAGLE POINT RD | 1.016 | 158,400.00| 0.00| 0.00| 0.0| IH 35E 0.04 MILES NORTH OF EAGLE POINT RD | | | | | | 0196-02-122 | | | | | | IM 0356(439) INSTALL SAFETY LIGHTING | | | | | | | | | | | | WORK ORDER- 04-03-13 WORK BEGAN- 04-29-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-29-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ROADWAY SOLUTIONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0196-02-122 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133209 | TOTALS | 158,400.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DENTON WEST OF US 377 | 7.011 | 45,721,253.16| 0.00| 0.00| 0.0| FM 1171 WEST OF SHILOH RD | | | | | | 1311-01-034 | | | | | | C 1311-1-34 GR,STRS,BASE,CRCP,PVMT MKGS,SIGNS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 693 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1311-01-034 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133002 | TOTALS | 45,721,253.16| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DENTON TARRANT COUNTY LINE | 48.258 | 1,297,695.08| 0.00| 0.00| 0.0| IH 35W ETC IH 35E INTERCHANGE | | | | | | 0081-13-052 | | | | | | IM 0356(440) PAVEMENT MARKINGS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 143 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TRP CONSTRUCTION GROUP, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0081-13-052 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133216 | TOTALS | 1,297,695.08| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DENTON SHILOH RD | 12.177 | 628,000.00| 2,083.75| 614,406.45|100.0| FM 1171 GARDEN RIDGE RD IN FLOWER MOUND | | | | | | 1311-01-051 | | | | | | STP 2012(579) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 06-21-12 WORK BEGAN- 07-24-12 | | | | | | DATE WORK COMPLETED- 04-30-13 TIME COMPUTED- 07-07-12 | | | | | | CONTRACT WORKING DAYS- 129 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 120 PERCENT TIME USED- 93 | | | | | | | | | | | | LEGENDS LANDSCAPES LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1311-01-051 | | | | | | LONE STAR TRAFFIC SERVICE, INC. | |SUB %: 1.14 | | | | AQUA BORE | |SUB %: 2.29 | | | | TEJAS COMMERCIAL CONSTRUCTION, LLC | |SUB %: 2.38 | | | | MELS ELECTRIC, L.P. | |SUB %: 3.16 | | | | | | | | | | CONTRACT 05123014 | TOTALS | 628,000.00| 2,083.75| 614,406.45|100.0| ************************************************************************************************************************************ DENTON FINSBURY TRAIL | 1.160 | 524,000.00| 0.00| 0.00| 0.0| FM 720 FM 423 | | | | | | 1567-01-035 | | | | | | STP 2013(666) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 83 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LEGENDS LANDSCAPES LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1567-01-035 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133010 | TOTALS | 524,000.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DENTON WEST OF FM 2499 (BARREL STRAP RD) | 3.358 | 23,555,699.11| 0.00| 0.00| 0.0| FM 2181 WEST FRTG ROAD OF I35E IN CORINTH | | | | | | 2054-02-016 | | | | | | STP 2013(667)MM GRADING, BASE ACP AND STRUCTURES | | | | | | | | | | | | DENTON WEST OF FM 2499 (BARREL STRAP RD) | 0.001 | 46,500.00| 0.00| 0.00| 0.0| FM 2181 WEST FRTG RD OF IH 35E IN CORINTH | | | | | | 2054-02-018 | | | | | | RW 2054-2-18 ROW ACQ., UTL. ADJ.; RELOC. ASSIST. | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2054-02-016 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133201 | TOTALS | 23,602,199.11| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DENTON FISH HATCHERY RD AT MCWHORTER CREEK | 0.066 | 749,275.58| 8,400.00| 675,586.49| 90.9| CR IN LEWISVILLE | | | | | | 0918-46-180 | | | | | | BR 2008(625) REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 09-13-11 WORK BEGAN- 05-21-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-12-11 | | | | | | CONTRACT WORKING DAYS- 152 ADDL DAYS GRANTED- 22 | | | | | | WORKING DAYS CHARGED- 185 PERCENT TIME USED- 106 | | | | | | | | | | | | LONE STAR CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-46-180 | | | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.35 | | | | BANDA TRUCKING COMPANY | |SUB %: 2.12 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 4.63 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.72 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 5.42 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.74 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.66 | | | | HJC FARMS, INC. | |SUB %: 2.17 | | | | | | | | | | CONTRACT 06113232 | TOTALS | 749,275.58| 8,400.00| 675,586.49| 90.9| ************************************************************************************************************************************ DENTON WEST OF COUNTY LINE ROAD | 4.638 | 28,612,477.14| 1,480,308.67| 1,639,608.67| 5.7| SH 114 WEST OF FM 156 | | | | | | 0353-02-029 | | | | | | C 353-2-29 GR STRS & SURF | | | | | | | | | | | | WORK ORDER- 08-28-12 WORK BEGAN- 04-22-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-25-13 | | | | | | CONTRACT WORKING DAYS- 569 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 9 PERCENT TIME USED- 1 | | | | | | | | | | | | SEMA CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0353-02-029 | | | | | | FOUNDATION DRILLERS, INC. | |SUB %: 0.31 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.19 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 2.34 | | | | THE LANE CONSTRUCTION CORPORATION | |SUB %: 35.42 | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 8.47 | | | | TRP CONSTRUCTION GROUP, LLC | |SUB %: 0.85 | | | | W.O.E. CONSTRUCTION | |SUB %: 4.17 | | | | FOWLER UNLIMITED, LLC | |SUB %: 0.17 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 2.04 | | | | | | | | | | CONTRACT 06123201 | TOTALS | 28,612,477.14| 1,480,308.67| 1,639,608.67| 5.7| ************************************************************************************************************************************ DENTON AT HARTS BRANCH | 0.080 | 1,726,268.66| 2,883.01| 530,423.70| 30.7| FM 720 . | | | | | | 1567-01-021 | | | | | | BR 2010(983) REPL BR & APPRS | | | | | | | | | | | | DENTON AT LITTLE ELM CREEK BRANCH OF LAKE | 0.484 | 15,758,790.61| 74,897.08| 8,709,048.93| 55.2| FM 720 LEWISVILLE | | | | | | 1567-01-022 | | | | | | BR 2010(983) REPL BR & APPRS | | | | | | | | | | | | DENTON 0.2 MI W OF GARZA LANE (W OF LAKE L | 4.493 | 33,538,923.64| 793,844.19| 12,904,404.47| 38.4| FM 720 0.1 MI WEST OF FM 423 | | | | | | 1567-01-029 | | | | | | STP 2010(982)MM GRADING, STR, PVMT, SIGNS | | | | | | | | | | | | DENTON 0.2 MILE WEST OF GARZA LANE | 0.001 | 3,297,279.80| 0.00| 42,859.00| 1.2| FM 720 0.1 MILE WEST OF FM 423 | | | | | | 1567-01-032 | | | | | | RW 1567-1-32 ROW ACQ. AND UTIL. ADJUST. | | | | | | | | | | | | WORK ORDER- 09-13-10 WORK BEGAN- 07-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-12-11 | | | | | | CONTRACT WORKING DAYS- 577 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 241 PERCENT TIME USED- 41 | | | | | | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1567-01-029 | | | | | | ATS DRILLING, L.P. | |SUB %: 5.77 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.22 | | | | CRAIG OLDEN, INC. | |SUB %: 0.61 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.11 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.21 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.31 | | | | L & E HART ENTERPRISES, INC. | |SUB %: 2.09 | | | | MICA CORPORATION | |SUB %: 4.78 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 5.54 | | | | PENHALL COMPANY | |SUB %: 0.05 | | | | RAMBO CONTRACTING, INC. | |SUB %: 2.62 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 6.26 | | | | S & V CONSTRUCTION LLC | |SUB %: 0.05 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.15 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.10 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.28 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.99 | | | | WEIR BROS.,INC. | |SUB %: 5.19 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.12 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 1.39 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.01 | | | | | | | | | | CONTRACT 07103001 | TOTALS | 54,321,262.71| 871,624.28| 22,186,736.10| 40.8| ************************************************************************************************************************************ DENTON FM 1830 | 6.126 | 12,873,212.87| 395,094.62| 8,498,856.02| 66.0| FM 407 WEST OF LANTANA TRAIL | | | | | | 1785-01-028 | | | | | | C 1785-1-28 GR, STRS & PVT. | | | | | | | | | | | | WORK ORDER- 09-16-11 WORK BEGAN- 03-01-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-01-12 | | | | | | CONTRACT WORKING DAYS- 497 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 312 PERCENT TIME USED- 62 | | | | | | | | | | | | THE LANE CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1785-01-028 | | | | | | BREDA COMPANY, INC. | |SUB %: 1.11 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.00 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.50 | | | | FARR FOUNDATION, INC. | |SUB %: 0.24 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.13 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.54 | | | | IOWA BRIDGE & CULVERT, LC | |SUB %: 1.16 | | | | MICA CORPORATION | |SUB %: 2.69 | | | | MIKE ALBERT, INC. | |SUB %: 4.47 | | | | TEXAS CURB CUT, LP | |SUB %: 0.05 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.82 | | | | THELIN RECYCLING CO., LLC | |SUB %: 0.23 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.45 | | | | C.T. AND S. METALWORKS, INC. | |SUB %: 0.00 | | | | CEN CONCRETE CONSTRUCTION COMPANY, INC. | |SUB %: 2.03 | | | | PENHALL COMPANY | |SUB %: 0.00 | | | | | | | | | | CONTRACT 07113205 | TOTALS | 12,873,212.87| 395,094.62| 8,498,856.02| 66.0| ************************************************************************************************************************************ DENTON WEST OF FM 156 | 4.702 | 39,346,679.90| 0.00| 0.00| 0.0| US 380 IH 35 | | | | | | 0134-09-063 | | | | | | NH 2012(635) GR, STR, DRAINAGE, PVMT, C&G, SIGNS | | | | | | | | | | | | WORK ORDER- 03-12-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 755 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0134-09-063 | | | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.23 | | | | BUYERS BARRICADES, INC. | |SUB %: 0.19 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.67 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.29 | | | | CRAIG OLDEN, INC. | |SUB %: 0.26 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 13.71 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 0.70 | | | | TEXAS INLETS, INC. | |SUB %: 2.35 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.64 | | | | TRAC-WORK, INC. | |SUB %: 1.82 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 1.19 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.08 | | | | CHOCTAW ERECTORS, INC. | |SUB %: 0.76 | | | | INDEPENDENT UTILITY CONSTRUCTION INCORPORATED | |SUB %: 1.04 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.94 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 0.96 | | | | MCL CONTRACTING, LLC | |SUB %: 1.02 | | | | | | | | | | CONTRACT 07123002 | TOTALS | 39,346,679.90| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DENTON 0.8 MI. S. OF FM 2934 | 3.470 | 29,931,000.00| 7,807.69| 27,575,761.50| 92.1| FM 423 STEWARTS CREEK ROAD | | | | | | 1567-02-027 | | | | | | C 1567-2-27 WIDEN TO 6 LANE DIVIDED URBAN | | | | | | | | | | | | WORK ORDER- 09-14-09 WORK BEGAN- 12-10-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-13-10 | | | | | | CONTRACT WORKING DAYS- 536 ADDL DAYS GRANTED- 28 | | | | | | WORKING DAYS CHARGED- 557 PERCENT TIME USED- 98 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1567-02-027 | | | | | | J.T. DERSNER INC. | |SUB %: 14.78 | | | | BREDA COMPANY, INC. | |SUB %: 1.00 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.19 | | | | CONCRETE PAVER SYSTEMS, INC. | |SUB %: 0.01 | | | | CRAIG OLDEN, INC. | |SUB %: 0.05 | | | | CROSSROADS, L.P. | |SUB %: 0.54 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 2.22 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.26 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.93 | | | | IOWA BRIDGE & CULVERT, LC | |SUB %: 0.43 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 0.12 | | | | ROADWAY SOLUTIONS, INC. | |SUB %: 5.76 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.31 | | | | RUNNING HORSE CONSTRUCTION, INC. | |SUB %: 0.15 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.02 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.35 | | | | TEXAS SHAFTS, INC. | |SUB %: 0.22 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.65 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 0.26 | | | | WEIR BROS.,INC. | |SUB %: 7.55 | | | | KDAT | |SUB %: 0.14 | | | | | | | | | | CONTRACT 08093002 | TOTALS | 29,931,000.00| 7,807.69| 27,575,761.50| 92.1| ************************************************************************************************************************************ DENTON AT TRAIL CREEK | 0.136 | 1,303,237.77| 224,315.86| 853,000.13| 65.4| FM 407 . | | | | | | 1568-02-007 | | | | | | BR 2012(682) REPLACE BR AND APPRS | | | | | | | | | | | | WORK ORDER- 09-13-12 WORK BEGAN- 12-03-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-12-12 | | | | | | CONTRACT WORKING DAYS- 189 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 109 PERCENT TIME USED- 57 | | | | | | | | | | | | MCMAHON CONTRACTING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1568-02-007 | | | | | | TEXAS SHAFTS, INC. | |SUB %: 3.33 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.99 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.24 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 10.46 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.88 | | | | EROSION CONTROL MANAGEMENT SYSTEMS | |SUB %: 0.64 | | | | DUSTIN ALLEN, INC. | |SUB %: 6.10 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 2.16 | | | | MCL CONTRACTING, LLC | |SUB %: 0.12 | | | | SOUTHEAST GRINDING & GROOVING, LLC | |SUB %: 0.11 | | | | | | | | | | CONTRACT 08123239 | TOTALS | 1,303,237.77| 224,315.86| 853,000.13| 65.4| ************************************************************************************************************************************ DENTON STEWARTS CREEK ROAD | 3.761 | 43,849,314.67| 6,833.18| 877,567.78| 2.0| FM 423 SH 121 | | | | | | 1567-02-020 | | | | | | C 1567-2-20 WIDEN TO 6 LANE DIVIDED URBAN | | | | | | | | | | | | DENTON STEWARTS CREEK ROAD | 3.794 | 8,015,048.33| 0.00| 0.00| 0.0| FM 423 SH 121 | | | | | | 1567-02-030 | | | | | | RW 1567-2-30 ROW ACQ, RELOC & UTILITIES | | | | | | | | | | | | WORK ORDER- 12-05-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-02-12 | | | | | | CONTRACT WORKING DAYS- 642 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | BALFOUR BEATTY INFRASTRUCTURE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1567-02-020 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09113202 | TOTALS | 51,864,363.00| 6,833.18| 877,567.78| 1.6| ************************************************************************************************************************************ DENTON EAST OF FM 156 | 1.830 | 15,384,182.11| 348,885.38| 11,827,771.42| 76.8| SH 114 WEST OF IH 35W | | | | | | 0353-02-062 | | | | | | C 353-2-62 GR,STR,PAV,STRM SEWER,PAV MRK, SIG | | | | | | | | | | | | WORK ORDER- 11-16-10 WORK BEGAN- 04-22-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-15-11 | | | | | | CONTRACT WORKING DAYS- 562 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 368 PERCENT TIME USED- 65 | | | | | | | | | | | | MARIO SINACOLA & SONS EXCAVATING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0353-02-062 | | | | | | ARLINGTON PAVERS, INC. | |SUB %: 0.03 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.24 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.04 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.41 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.93 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 11.50 | | | | MUSTANG TURF & LANDSCAPE, LLC | |SUB %: 2.47 | | | | RMI WORLDWIDE, LLC | |SUB %: 0.19 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.36 | | | | SOUTH TEXAS INDUSTRIAL COATINGS, L.L.C. | |SUB %: 0.12 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.17 | | | | S & V CONSTRUCTION LLC | |SUB %: 0.35 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.96 | | | | TEXAS SHAFTS, INC. | |SUB %: 0.18 | | | | PENHALL COMPANY | |SUB %: 0.01 | | | | MARKSMAN CONTRACTING, LLC | |SUB %: 0.52 | | | | RAMBO CONTRACTING, INC. | |SUB %: 1.30 | | | | TEXAS INLETS, INC. | |SUB %: 2.55 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 0.04 | | | | LLANO UTILITY SERVICES, INC. | |SUB %: 0.10 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.01 | | | | MELS ELECTRIC, L.P. | |SUB %: 0.05 | | | | | | | | | | CONTRACT 10103001 | TOTALS | 15,384,182.11| 348,885.38| 11,827,771.42| 76.8| ************************************************************************************************************************************ DENTON ETC US 77 | 172.893 | 10,957,185.08| 694,411.80| 1,845,105.99| 16.8| IH 35 ETC COOKE COUNTY LINE; FRONTAGE ROADS | | | | | | 0195-02-067 | | | | | | IM 0356(437) SEAL COAT, PVMT MKGS, & MAILBOXES | | | | | | | | | | | | WORK ORDER- 11-09-12 WORK BEGAN- 02-26-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-02-13 | | | | | | CONTRACT WORKING DAYS- 189 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 49 PERCENT TIME USED- 25 | | | | | | | | | | | | BRANNAN PAVING CO., LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0195-02-067 | | | | | | SOUTHWEST ENVIRONMENT SERVICES, INC. | |SUB %: 0.10 | | | | STRIPE-A-ZONE, INC. | |SUB %: 18.82 | | | | | | | | | | CONTRACT 10123215 | TOTALS | 10,957,185.08| 694,411.80| 1,845,105.99| 16.8| ************************************************************************************************************************************ DENTON WEST OF BONNIE BRAE ST | 1.625 | 15,088,445.93| 0.00| 0.00| 0.0| US 380 US 377 | | | | | | 0134-09-034 | | | | | | STP 2013(181) STRUCTURES, BASE, PAVEMENT | | | | | | | | | | | | WORK ORDER- 04-03-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 420 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0134-09-034 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11123002 | TOTALS | 15,088,445.93| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DENTON TARRANT COUNTY LINE | 15.648 | 4,479,766.95| 686,943.50| 712,299.90| 15.9| US 377 HICKORY CREEK | | | | | | 0081-03-052 | | | | | | STP 2013(180) BASE REP, OV | | | | | | | | | | | | WORK ORDER- 01-03-13 WORK BEGAN- 03-25-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-04-13 | | | | | | CONTRACT WORKING DAYS- 222 ADDL DAYS GRANTED- 1 | | | | | | WORKING DAYS CHARGED- 40 PERCENT TIME USED- 17 | | | | | | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0081-03-052 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.36 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 3.33 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 2.63 | | | | | | | | | | CONTRACT 11123009 | TOTALS | 4,479,766.95| 686,943.50| 712,299.90| 15.9| ************************************************************************************************************************************ DENTON 0.1 MI N OF FM 2450 | 4.682 | 4,152,523.54| 43,706.06| 4,423,907.11| 99.9| FM 156 IH 35 | | | | | | 0718-01-052 | | | | | | C 718-1-52 ADD 10' SHOULDERS AND REHAB | | | | | | | | | | | | WORK ORDER- 01-11-11 WORK BEGAN- 04-20-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-12-11 | | | | | | CONTRACT WORKING DAYS- 175 ADDL DAYS GRANTED- 35 | | | | | | WORKING DAYS CHARGED- 175 PERCENT TIME USED- 83 | | | | | | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0718-01-052 | | | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.21 | | | | HJC FARMS, INC. | |SUB %: 1.61 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.97 | | | | MIKE ALBERT, INC. | |SUB %: 23.83 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.75 | | | | TEXAS SHAFTS, INC. | |SUB %: 0.66 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.04 | | | | GARY A. CRAIN, INC. | |SUB %: 0.14 | | | | | | | | | | CONTRACT 12103219 | TOTALS | 4,152,523.54| 43,706.06| 4,423,907.11| 99.9| ************************************************************************************************************************************ DENTON DENTON/WISE COUNTY LINE ROAD | 7.860 | 26,379,472.05| 1,052,813.73| 10,142,991.72| 38.4| US 380 WEST OF FM 156 | | | | | | 0134-09-029 | | | | | | STP 2012(184)SB GR, STR, DRAINAGE, BASE, PVMT, AND | | | | | | | | | | | | WORK ORDER- 02-22-12 WORK BEGAN- 05-14-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-14-12 | | | | | | CONTRACT WORKING DAYS- 588 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 236 PERCENT TIME USED- 40 | | | | | | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0134-09-029 | | | | | | GLENN THURMAN, INC. | |SUB %: 14.17 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.04 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.65 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.42 | | | | CEN CONCRETE CONSTRUCTION COMPANY, INC. | |SUB %: 2.02 | | | | DUSTROL, INC. | |SUB %: 0.64 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.87 | | | | MIKE ALBERT, INC. | |SUB %: 2.69 | | | | MURRAY CONSTRUCTION | |SUB %: 0.35 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.85 | | | | IOWA BRIDGE & CULVERT, LC | |SUB %: 0.33 | | | | TEXAS SHAFTS, INC. | |SUB %: 0.15 | | | | MCL CONTRACTING, LLC | |SUB %: 0.01 | | | | LKT & ASSOCIATES | |SUB %: 2.33 | | | | | | | | | | CONTRACT 12113201 | TOTALS | 26,379,472.05| 1,052,813.73| 10,142,991.72| 38.4| ************************************************************************************************************************************ ELLIS AT RAILPORT PARKWAY | 1.459 | 8,811,943.85| 677,771.87| 7,285,581.56| 82.6| US 67 . | | | | | | 0260-02-038 | | | | | | PTF 2011(809) GRADING,BASE,ACP PVMNT,STRUCTURES | | | | | | | | | | | | WORK ORDER- 04-05-11 WORK BEGAN- 04-22-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-22-11 | | | | | | CONTRACT WORKING DAYS- 303 ADDL DAYS GRANTED- 243 | | | | | | WORKING DAYS CHARGED- 517 PERCENT TIME USED- 94 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0260-02-038 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.69 | | | | RAMBO CONTRACTING, INC. | |SUB %: 2.21 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 0.94 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.21 | | | | BUILDER SERVICES CO. | |SUB %: 0.59 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.71 | | | | MELS ELECTRIC, L.P. | |SUB %: 0.45 | | | | J. T. LANSFORD & SONS, INC. | |SUB %: 0.34 | | | | BAKER BRIDGE, L.P. | |SUB %: 16.29 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 1.30 | | | | GARY A. CRAIN, INC. | |SUB %: 0.23 | | | | ENVIRONMENTAL STANDARDS, INC. | |SUB %: 0.14 | | | | SAN-ANN-CO., INC. | |SUB %: 0.24 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.12 | | | | PENHALL COMPANY | |SUB %: 0.06 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.10 | | | | DUSTROL, INC. | |SUB %: 0.20 | | | | REBCON, INC. | |SUB %: 10.24 | | | | N.L. SCHUTTE FOUNDATION DRILLING, INC. | |SUB %: 0.24 | | | | A R DANIEL CONSTRUCTION SERVICES, INC. | |SUB %: 0.39 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.11 | | | | WEST TEXAS REBAR PLACERS INC. | |SUB %: 0.25 | | | | WEBBER BARRIER SERVICES, LLC. | |SUB %: 0.58 | | | | | | | | | | CONTRACT 02113005 | TOTALS | 8,811,943.85| 677,771.87| 7,285,581.56| 82.6| ************************************************************************************************************************************ ELLIS SARDIS | 7.301 | 5,279,326.58| 20,125.00| 4,839,505.04| 91.6| US 287 PARKS SCHOOL HOUSE ROAD | | | | | | 0172-05-108 | | | | | | NH 2012(395) REPAIR AND OVERLAY | | | | | | | | | | | | WORK ORDER- 06-04-12 WORK BEGAN- 08-02-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-02-12 | | | | | | CONTRACT WORKING DAYS- 83 ADDL DAYS GRANTED- 8 | | | | | | WORKING DAYS CHARGED- 91 PERCENT TIME USED- 100 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0172-05-108 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.12 | | | | DUSTROL, INC. | |SUB %: 0.34 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.72 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.07 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.68 | | | | BRENDA PRICE TRUCKING | |SUB %: 2.27 | | | | | | | | | | CONTRACT 03123205 | TOTALS | 5,279,326.58| 20,125.00| 4,839,505.04| 91.6| ************************************************************************************************************************************ ELLIS HILL COUNTY LINE | 9.649 | 2,429,911.04| 0.00| 0.00| 0.0| FM 66 FM 916 | | | | | | 0596-02-041 | | | | | | STP 2013(450) BASE & PVMT REPAIR, HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 191 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0596-02-041 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133006 | TOTALS | 2,429,911.04| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ELLIS ON PRATT RD, SE OF SH 342 | 0.207 | 804,599.21| 0.00| 0.00| 0.0| CS AT BEAR CREEK IN RED OAK | | | | | | 0918-22-142 | | | | | | BR 1102(575) REPL BR & APPR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 187 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | REBCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-22-142 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133028 | TOTALS | 804,599.21| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ELLIS SOUTH OF US 287 | 0.568 | 4,728,943.55| 0.00| 0.00| 0.0| FM 663 NORTH OF US 287 | | | | | | 0815-08-027 | | | | | | PTF 2013(451) STR, PVMT, PVMT MKGS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 161 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0815-08-027 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133216 | TOTALS | 4,728,943.55| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ELLIS FARLEY ROAD PEDESTRIAN CONNECTION | 0.662 | 603,652.85| 42,797.19| 533,364.29| 94.2| CS BROWN/SINGLETON PK TO US 287 | | | | | | 0918-22-139 | | | | | | STP 2011(224)TE SIDEWALK AND BRIDGE WIDENING | | | | | | | | | | | | WORK ORDER- 05-15-12 WORK BEGAN- 08-06-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-14-12 | | | | | | CONTRACT WORKING DAYS- 101 ADDL DAYS GRANTED- 25 | | | | | | WORKING DAYS CHARGED- 184 PERCENT TIME USED- 146 | | | | | | | | | | | | LEGENDS LANDSCAPES LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-22-139 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 2.52 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.97 | | | | BEAIRD DRILLING | |SUB %: 2.07 | | | | VIKING FENCE COMPANY, INC. | |SUB %: 3.81 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.14 | | | | | | | | | | CONTRACT 04123014 | TOTALS | 603,652.85| 42,797.19| 533,364.29| 94.2| ************************************************************************************************************************************ ELLIS WEST OF KENSINGTON DR | 0.925 | 4,091,255.00| 0.00| 0.00| 0.0| FM 1387 EAST OF WALNUT GROVE RD | | | | | | 1394-02-023 | | | | | | CC 1394-2-23 GRADING, PAVING, STRUCTURES, SIGNS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 309 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TISEO PAVING CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1394-02-023 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133010 | TOTALS | 4,091,255.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ELLIS SH 34 | 17.893 | 376,016.55| 0.00| 0.00| 0.0| IH 45 FM 879 | | | | | | 0092-04-070 | | | | | | IM 0453(132) INSTALL GUIDE SIGNS | | | | | | | | | | | | ELLIS FM 1182 | 6.780 | 63,617.45| 0.00| 0.00| 0.0| IH 45 FM 1181 | | | | | | 0092-05-049 | | | | | | STP 2013(530)MM TRUCK LANE RESTRICTIONS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 96 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SIEMENS INDUSTRY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0092-05-049 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133011 | TOTALS | 439,634.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ELLIS OVERHILL DRIVE | 2.122 | 1,755,231.90| 0.00| 0.00| 0.0| US 77 NORTH OF US 287 IN WAXAHACHIE | | | | | | 0048-03-080 | | | | | | STP 2013(527)HES INSTALL RAISED MEDIAN | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 93 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | O. TREVINO CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0048-03-080 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133212 | TOTALS | 1,755,231.90| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ELLIS OVERLOOK DRIVE | 0.585 | 8,956,100.80| 653,709.85| 3,036,541.62| 33.9| US 67 EIGHTH ST | | | | | | 0261-01-037 | | | | | | C 261-1-37 CONSTRUCT NEW FRONTAGE ROADS | | | | | | | | | | | | WORK ORDER- 08-20-12 WORK BEGAN- 10-29-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-19-12 | | | | | | CONTRACT WORKING DAYS- 367 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 133 PERCENT TIME USED- 36 | | | | | | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0261-01-037 | | | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.56 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.15 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.63 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.09 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.16 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.14 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 1.77 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 10.35 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.84 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.44 | | | | FARR FOUNDATION, INC. | |SUB %: 3.98 | | | | PANTHER CREEK TRANSPORTATION, INC. | |SUB %: 1.30 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.14 | | | | | | | | | | CONTRACT 06123005 | TOTALS | 8,956,100.80| 653,709.85| 3,036,541.62| 33.9| ************************************************************************************************************************************ ELLIS JOHNSON C/L | 14.992 | 4,420,536.84| 10,670.00| 5,005,524.31|100.0| US 287 BU 287Q (OLD FT. WORTH HWY) | | | | | | 0172-04-042 | | | | | | NH 2012(631) ACP OVERLAY AND PAVEMENT MARKINGS | | | | | | | | | | | | WORK ORDER- 07-16-12 WORK BEGAN- 10-15-12 | | | | | | DATE WORK COMPLETED- 04-12-13 TIME COMPUTED- 09-14-12 | | | | | | CONTRACT WORKING DAYS- 73 ADDL DAYS GRANTED- 11 | | | | | | WORKING DAYS CHARGED- 97 PERCENT TIME USED- 115 | | | | | | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0172-04-042 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 2.83 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.18 | | | | | | | | | | CONTRACT 06123224 | TOTALS | 4,420,536.84| 10,670.00| 5,005,524.31|100.0| ************************************************************************************************************************************ ELLIS 0.97 MI NORTH OF JOHNSTON RD | 2.707 | 21,720,233.47| 0.00| 20,367,816.01| 93.9| IH 35E US 77 SOUTH OF WAXAHACHIE | | | | | | 0048-08-044 | | | | | | IM 0356(422) GR,STRS,CONC PAVEMENT OVERLAY | | | | | | | | | | | | WORK ORDER- 09-21-10 WORK BEGAN- 10-07-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-01-12 | | | | | | CONTRACT WORKING DAYS- 417 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 436 PERCENT TIME USED- 104 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0048-08-044 | | | | | | FARR FOUNDATION, INC. | |SUB %: 0.76 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.55 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.04 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.82 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 12.29 | | | | RESONANT MACHINES | |SUB %: 0.44 | | | | S & V CONSTRUCTION LLC | |SUB %: 0.04 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.16 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.45 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.69 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 0.26 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 1.47 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 3.26 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.14 | | | | BEAR CREEK CONSTRUCTION, LLC | |SUB %: 0.19 | | | | CTBX, INC. | |SUB %: 0.22 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.00 | | | | | | | | | | CONTRACT 07103047 | TOTALS | 21,720,233.47| 0.00| 20,367,816.01| 93.9| ************************************************************************************************************************************ ELLIS BUS US 287 IN ENNIS | 3.181 | 34,561,014.77| 600,992.26| 31,142,626.99| 90.2| US 287 SOUTH OF SH 34 | | | | | | 0172-08-050 | | | | | | DMO 2005(474) WIDENING OF A NON-FREEWAY FACILITY | | | | | | | | | | | | ELLIS BUS US 287 IN ENNIS | 2.797 | 93,744.00| 0.00| 93,658.00| 99.9| US 287 SOUTH OF SH 34 | | | | | | 0172-08-054 | | | | | | RW 172-8-54 ROW ACQ., AND UTL. ADJ. | | | | | | | | | | | | WORK ORDER- 01-07-10 WORK BEGAN- 03-09-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-09-10 | | | | | | CONTRACT WORKING DAYS- 563 ADDL DAYS GRANTED- 195 | | | | | | WORKING DAYS CHARGED- 780 PERCENT TIME USED- 102 | | | | | | | | | | | | SAFECO INSURANCE COMPANIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0172-08-050 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.04 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.42 | | | | MURRAY CONSTRUCTION | |SUB %: 0.19 | | | | GIBSON & ASSOCIATES, INC. | |SUB %: 0.03 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.06 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.38 | | | | AK MILLING, LLC | |SUB %: 0.46 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 0.61 | | | | F & W ELECTRICAL CONTRACTORS, INC. | |SUB %: 0.65 | | | | JAMES CONSTRUCTION GROUP, L.L.C. | |SUB %: 10.21 | | | | JAG TRUCKING INC | |SUB %: 6.20 | | | | SAR TRANSPORTATION, LLC | |SUB %: 2.64 | | | | S & S TRUCKING | |SUB %: 0.17 | | | | APAC-TEXAS, INC. | |SUB %: 25.44 | | | | V. FERNANDEZ TRUCKING, INC. | |SUB %: 0.43 | | | | EAGLE AGGREGATE TRANSPORTATION, LLC. | |SUB %: 1.00 | | | | ALLIED FENCE COMPANY | |SUB %: 0.04 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.00 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.05 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 0.32 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.76 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.02 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.01 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.19 | | | | METRO CUTTING AND SEALING, INC. | |SUB %: 0.00 | | | | CIRCLE H CONTRACTORS, L.P. | |SUB %: 0.05 | | | | COWBOY CORING CORPORATION | |SUB %: 0.00 | | | | GEORGETOWN GRASS AND LAWN COMPANY, INC. | |SUB %: 0.02 | | | | LINDSEY CONTRACTORS, INC. | |SUB %: 0.17 | | | | EXTREME ENVIRONMENTAL SERVICES | |SUB %: 0.00 | | | | ANDERSON COLUMBIA CO., INC. | |SUB %: 63.13 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.94 | | | | RANGER EXCAVATING, L.P. | |SUB %: 4.12 | | | | DUSTROL, INC. | |SUB %: 0.09 | | | | BRENDA PRICE TRUCKING | |SUB %: 1.68 | | | | EMPIRE CIVIL CONSTRUCTION, L.L.C. | |SUB %: 9.74 | | | | BIG CREEK CONSTRUCTION, LTD. | |SUB %: 16.41 | | | | UNDERGROUND COALITION, INC. | |SUB %: 2.26 | | | | ECO-REBAR CO | |SUB %: 0.02 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.07 | | | | CLAYCON CONSTRUCTION, LLC | |SUB %: 1.22 | | | | MP GRINDING & GROOVING, LLC | |SUB %: 0.02 | | | | MTM EXCAVATION | |SUB %: 0.06 | | | | | | | | | | CONTRACT 10093001 | TOTALS | 34,654,758.77| 600,992.26| 31,236,284.99| 90.3| ************************************************************************************************************************************ ELLIS EAST OF HACIENDA DR IN WAXAHACHIE | 6.326 | 4,983,944.03| 80,709.86| 5,322,564.27| 99.9| FM 813 FM 983 | | | | | | 1139-01-041 | | | | | | STP 2011(468)SB PAV SHLDRS | | | | | | | | | | | | WORK ORDER- 01-03-11 WORK BEGAN- 01-21-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-19-11 | | | | | | CONTRACT WORKING DAYS- 337 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 523 PERCENT TIME USED- 155 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1139-01-041 | | | | | | FORTSON CONTRACTING, INC. | |SUB %: 2.06 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.92 | | | | COLD CREEK CONSTRUCTION, LTD | |SUB %: 0.02 | | | | J & M CONTRACTING, COMPANY | |SUB %: 15.90 | | | | DANRIDGE CONSTRUCTION, LLC. | |SUB %: 0.41 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 0.45 | | | | TEXAS ENVIRONMENTAL MANAGEMENT, INC | |SUB %: 2.10 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.25 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.02 | | | | SAN-ANN-CO., INC. | |SUB %: 1.02 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.23 | | | | SOUTHEAST GRINDING & GROOVING, LLC | |SUB %: 0.45 | | | | | | | | | | CONTRACT 10103006 | TOTALS | 4,983,944.03| 80,709.86| 5,322,564.27| 99.9| ************************************************************************************************************************************ ELLIS FM 983 | 5.871 | 4,664,634.84| 16,346.50| 4,803,578.97|100.0| FM 813 FM 878 IN PALMER | | | | | | 1139-01-042 | | | | | | STP 2011(469)SB PAV SHLDRS | | | | | | | | | | | | WORK ORDER- 01-06-11 WORK BEGAN- 01-24-11 | | | | | | DATE WORK COMPLETED- 05-08-13 TIME COMPUTED- 01-22-11 | | | | | | CONTRACT WORKING DAYS- 297 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 425 PERCENT TIME USED- 142 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1139-01-042 | | | | | | J & M CONTRACTING, COMPANY | |SUB %: 16.20 | | | | COLD CREEK CONSTRUCTION, LTD | |SUB %: 0.28 | | | | FORTSON CONTRACTING, INC. | |SUB %: 2.42 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.83 | | | | DANIEL CONSTRUCTION SERVICES, INC. (AR DANIEL...) | |SUB %: 0.63 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 0.52 | | | | ANALYTICAL TECHNOLOGY CONSULTANTS, INC. | |SUB %: 0.31 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 5.15 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.27 | | | | PENHALL COMPANY | |SUB %: 0.32 | | | | | | | | | | CONTRACT 10103207 | TOTALS | 4,664,634.84| 16,346.50| 4,803,578.97|100.0| ************************************************************************************************************************************ ELLIS US 287 | 5.313 | 7,458,514.93| 586,166.31| 3,472,456.85| 46.5| IH 35E SOUTH OF US 77 NORTH | | | | | | 0048-04-083 | | | | | | HP 2013(099) BASE REPAIR AND OVERLAY | | | | | | | | | | | | WORK ORDER- 11-09-12 WORK BEGAN- 02-04-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-08-13 | | | | | | CONTRACT WORKING DAYS- 124 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 78 PERCENT TIME USED- 62 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0048-04-083 | | | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.12 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.15 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.62 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 3.86 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.51 | | | | | | | | | | CONTRACT 10123005 | TOTALS | 7,458,514.93| 586,166.31| 3,472,456.85| 46.5| ************************************************************************************************************************************ KAUFMAN AT PROPOSED FORNEY PARKWAY | 1.030 | 17,050,215.03| 107,963.84| 13,115,532.61| 76.9| US 80 . | | | | | | 0095-04-064 | | | | | | C 95-4-64 GR, STR, DRAINAGE, PVMT, SIGNS | | | | | | | | | | | | WORK ORDER- 03-06-12 WORK BEGAN- 04-09-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-22-12 | | | | | | CONTRACT WORKING DAYS- 473 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 311 PERCENT TIME USED- 65 | | | | | | | | | | | | HAYDON BUILDING CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0095-04-064 | | | | | | BEAIRD DRILLING | |SUB %: 2.99 | | | | BUYERS BARRICADES, INC. | |SUB %: 0.19 | | | | DUSTROL, INC. | |SUB %: 0.14 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.57 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 3.69 | | | | STAR OPERATIONS, INC. | |SUB %: 1.93 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.08 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.32 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 1.00 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.07 | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 0.64 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 2.82 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 1.20 | | | | PETERSON CONTRACTORS, INC. | |SUB %: 0.00 | | | | COWBOY TRUCKING | |SUB %: 0.00 | | | | | | | | | | CONTRACT 01123202 | TOTALS | 17,050,215.03| 107,963.84| 13,115,532.61| 76.9| ************************************************************************************************************************************ KAUFMAN AT FM 740 SOUTH | 0.002 | 247,839.23| 0.00| 0.00| 0.0| US 80 IN FORNEY | | | | | | 0095-03-086 | | | | | | NH 2013(382) REHABILITATION OF TRAFFIC SIGNALS | | | | | | | | | | | | WORK ORDER- 04-03-13 WORK BEGAN- 05-06-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ROADWAY SOLUTIONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0095-03-086 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133021 | TOTALS | 247,839.23| 0.00| 0.00| 0.0| ************************************************************************************************************************************ KAUFMAN AIRPORT RD | 0.303 | 663,290.10| 0.00| 572,679.35| 86.3| SH 34 HIGH ST IN TERRELL | | | | | | 0173-04-024 | | | | | | RW 173-4-24 ACQUISITION OF ROW | | | | | | | | | | | | KAUFMAN AIRPORT RD | 1.032 | 14,656,545.90| 921,157.74| 12,351,581.92| 84.2| SH 34 HIGH ST. IN TERRELL | | | | | | 0173-04-025 | | | | | | STP 2011(798) GR, PVMT, & GRADE SEP RR O/P | | | | | | | | | | | | WORK ORDER- 06-14-11 WORK BEGAN- 10-04-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-12-11 | | | | | | CONTRACT WORKING DAYS- 440 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 388 PERCENT TIME USED- 87 | | | | | | | | | | | | AUI CONTRACTORS, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0173-04-025 | | | | | | DUSTROL, INC. | |SUB %: 0.51 | | | | HAYWARD BAKER, INC. | |SUB %: 1.49 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 3.97 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 7.18 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 6.66 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.90 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.68 | | | | T-BAR FENCE, INC. | |SUB %: 0.48 | | | | TEXAS SHAFTS, INC. | |SUB %: 1.11 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 2.31 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.86 | | | | THELIN RECYCLING CO., LLC | |SUB %: 0.23 | | | | TRAC-WORK, INC. | |SUB %: 1.46 | | | | CROSSROADS, L.P. | |SUB %: 0.26 | | | | MCALLISTER"S LANDSCAPE MANAGEMENT | |SUB %: 0.67 | | | | RIVER CITIES SAWING, LLC | |SUB %: 0.29 | | | | RAIL LABOR PROVIDERS | |SUB %: 0.05 | | | | STRAIGHT LINE SAWING & SEALING | |SUB %: 0.19 | | | | EL CALA CONSTRUCTION LLC | |SUB %: 2.11 | | | | | | | | | | CONTRACT 03113211 | TOTALS | 15,319,836.00| 921,157.74| 12,924,261.27| 84.3| ************************************************************************************************************************************ KAUFMAN CR 310 AT MUDDY CEDAR CREEK AND | 0.460 | 1,974,519.71| 54,683.79| 1,465,433.51| 74.2| CR MUDDY CEDAR CREEK TRIB | | | | | | 0918-11-076 | | | | | | BR 1102(516) REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 05-01-12 WORK BEGAN- 07-25-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-25-12 | | | | | | CONTRACT WORKING DAYS- 413 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 176 PERCENT TIME USED- 42 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-11-076 | | | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 3.35 | | | | SAMMY G. SMALLWOOD | |SUB %: 3.71 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.92 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 5.42 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.27 | | | | | | | | | | CONTRACT 03123010 | TOTALS | 1,974,519.71| 54,683.79| 1,465,433.51| 74.2| ************************************************************************************************************************************ KAUFMAN FM 740 | 1.976 | 298,102.56| 0.00| 0.00| 0.0| FM 741 MONITOR BLVD. IN FORNEY | | | | | | 1092-01-018 | | | | | | STP 2013(453) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 92 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LANDSCAPE CONTRACTING AND IRRIGATION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1092-01-018 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133221 | TOTALS | 298,102.56| 0.00| 0.00| 0.0| ************************************************************************************************************************************ KAUFMAN LACY FORK CREEK, UNNAMED TRIBUTARY | 0.378 | 3,447,254.17| 17,416.00| 3,459,238.54| 99.9| FM 90 TO LACY FORK CREEK, AND CANEY CREEK | | | | | | 0697-04-015 | | | | | | BR 2011(878) REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 05-13-11 WORK BEGAN- 10-11-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-12-11 | | | | | | CONTRACT WORKING DAYS- 262 ADDL DAYS GRANTED- 47 | | | | | | WORKING DAYS CHARGED- 299 PERCENT TIME USED- 96 | | | | | | | | | | | | EAST TEXAS BRIDGE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0697-04-015 | | | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.45 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.28 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.77 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 8.43 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.62 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.15 | | | | ATS DRILLING, L.P. | |SUB %: 2.89 | | | | RG PAINTING | |SUB %: 0.23 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.23 | | | | SOUTHEAST GRINDING & GROOVING, LLC | |SUB %: 0.15 | | | | | | | | | | CONTRACT 04113213 | TOTALS | 3,447,254.17| 17,416.00| 3,459,238.54| 99.9| ************************************************************************************************************************************ KAUFMAN RANCH ROAD IN FORNEY | 6.023 | 5,599,999.92| 0.00| 0.00| 0.0| FM 740 ROCKWALL COUNTY LINE | | | | | | 1091-01-019 | | | | | | STP 2013(318) GR, BASE, PVMT, HMAC, PVMT MKGS, SI | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 210 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BILLY CUMMINGS CONSTRUCTION INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1091-01-019 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133223 | TOTALS | 5,599,999.92| 0.00| 0.00| 0.0| ************************************************************************************************************************************ KAUFMAN US 80 | 0.977 | 1,979,270.82| 0.00| 0.00| 0.0| SH 34 N. FRANCES STREET IN TERRELL | | | | | | 0173-05-032 | | | | | | STP 2013(665) HOT MIX OVLY,BASE,BLADE,PAV MARKS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 152 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0173-05-032 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133023 | TOTALS | 1,979,270.82| 0.00| 0.00| 0.0| ************************************************************************************************************************************ KAUFMAN AT NINTH ST AND SP 87 (DELLIS ST) | 1.462 | 184,862.00| 0.00| 0.00| 0.0| US 80 IN TERRELL | | | | | | 0095-05-056 | | | | | | STP 2013(728) REHABILITATION OF TRAFFIC SIGNALS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SIEMENS INDUSTRY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0095-05-056 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133225 | TOTALS | 184,862.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ KAUFMAN AT SH 243 | 4.866 | 153,652.45| 0.00| 156,318.70| 99.9| US 175 . | | | | | | 0197-04-076 | | | | | | NH 1102(089) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 07-22-11 WORK BEGAN- 10-13-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-07-11 | | | | | | CONTRACT WORKING DAYS- 64 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 59 PERCENT TIME USED- 92 | | | | | | | | | | | | TEXAS TREE & LANDSCAPE, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0197-04-076 | | | | | | TX DOWN UNDER CONSTRUCTION LLC | |SUB %: 3.35 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.95 | | | | CEN-TEX IRRIGATION SYSTEMS | |SUB %: 27.33 | | | | | | | | | | CONTRACT 06113012 | TOTALS | 153,652.45| 0.00| 156,318.70| 99.9| ************************************************************************************************************************************ KAUFMAN BUFFALO CREEK | 0.323 | 2,856,520.65| 0.00| 3,422,048.41| 99.9| FM 740 ' | | | | | | 1091-01-016 | | | | | | STP 2009(601)ES REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 09-28-09 WORK BEGAN- 02-16-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-14-09 | | | | | | CONTRACT WORKING DAYS- 389 ADDL DAYS GRANTED- 18 | | | | | | WORKING DAYS CHARGED- 463 PERCENT TIME USED- 124 | | | | | | | | | | | | DOUGHTIE CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1091-01-016 | | | | | | BTA SERVICES, LTD. | |SUB %: 0.58 | | | | PREMIER PAVING, LTD. | |SUB %: 10.17 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.30 | | | | CENTRAL TEXAS ENVIRONMENTAL SERVICES, LLC | |SUB %: 0.42 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 3.98 | | | | D & E CONTRACTORS | |SUB %: 8.87 | | | | HOLES INCORPORATED | |SUB %: 0.98 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.35 | | | | JUST GROOVING, LTD. | |SUB %: 0.19 | | | | LONE STAR HIGHWAY PRODUCTS, INC. | |SUB %: 3.67 | | | | CLEMONS TRUCKING | |SUB %: 0.36 | | | | SOUTHWEST CRUSHING, LLC | |SUB %: 0.36 | | | | BREDA COMPANY, INC. | |SUB %: 0.24 | | | | INTERSTATE SAFETY SYSTEMS, INC. | |SUB %: 3.92 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 3.07 | | | | ODUM SERVICES, L.P. | |SUB %: 0.74 | | | | | | | | | | CONTRACT 07093216 | TOTALS | 2,856,520.65| 0.00| 3,422,048.41| 99.9| ************************************************************************************************************************************ KAUFMAN FM 987 | 7.278 | 8,387,714.05| 9,376.92| 8,487,115.38| 99.9| FM 148 US 175 IN CRANDALL | | | | | | 0751-01-033 | | | | | | C 751-1-33 HOT MIX OVERLAY, BASE AND PAV MRKS | | | | | | | | | | | | KAUFMAN MAIN LANE AT BUFFALO CREEK | 0.051 | 797,026.18| 480.00| 920,806.98| 99.9| FM 148 . | | | | | | 0751-01-034 | | | | | | BR 2011(084) REPLACE BR AND APPRS | | | | | | | | | | | | WORK ORDER- 09-16-10 WORK BEGAN- 11-09-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-09-10 | | | | | | CONTRACT WORKING DAYS- 596 ADDL DAYS GRANTED- 42 | | | | | | WORKING DAYS CHARGED- 616 PERCENT TIME USED- 96 | | | | | | | | | | | | KNIFE RIVER CORPORATION - SOUTH | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0751-01-034 | | | | | | LONE STAR EQUIPMENT CO. INC. (INACTIVE--SEE 12687) | |SUB %: 2.51 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.27 | | | | ATS DRILLING, L.P. | |SUB %: 2.60 | | | | BREDA COMPANY, INC. | |SUB %: 0.41 | | | | RK HALL, LLC | |SUB %: 13.32 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.38 | | | | JUST GROOVING, LTD. | |SUB %: 0.06 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.02 | | | | HJC FARMS, INC. | |SUB %: 2.13 | | | | AARON CONCRETE CONTRACTORS, L.P. | |SUB %: 1.63 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 0.79 | | | | J & M CONTRACTING, COMPANY | |SUB %: 9.73 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.67 | | | | GIBSON & ASSOCIATES, INC. | |SUB %: 0.43 | | | | A BROTHERS | |SUB %: 1.49 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.16 | | | | TRADE RESOURCES, INC. | |SUB %: 1.25 | | | | LINDAMOOD DEMOLITION, INC. | |SUB %: 0.79 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.01 | | | | CARRUTH NURSERY IRRIGATION & LANDSCAPE, INC. | |SUB %: 0.16 | | | | | | | | | | CONTRACT 08103005 | TOTALS | 9,184,740.23| 9,856.92| 9,407,922.36| 99.9| ************************************************************************************************************************************ KAUFMAN FM 148 | 5.239 | 3,172,491.78| 0.00| 3,573,123.29| 99.9| FM 1641 FM 548 | | | | | | 1217-01-014 | | | | | | STP 2011(470)ES OVERLAY,REWORK BASE,BLADING,PVT MRK | | | | | | | | | | | | WORK ORDER- 12-01-10 WORK BEGAN- 02-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-30-11 | | | | | | CONTRACT WORKING DAYS- 252 ADDL DAYS GRANTED- 73 | | | | | | WORKING DAYS CHARGED- 308 PERCENT TIME USED- 94 | | | | | | | | | | | | KNIFE RIVER CORPORATION - SOUTH | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1217-01-014 | | | | | | LONE STAR EQUIPMENT CO. INC. (INACTIVE--SEE 12687) | |SUB %: 5.11 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.83 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 2.66 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 20.72 | | | | CATOCON, INC. | |SUB %: 0.54 | | | | HJC FARMS, INC. | |SUB %: 7.65 | | | | J & M CONTRACTING, COMPANY | |SUB %: 15.04 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 2.12 | | | | A BROTHERS | |SUB %: 0.19 | | | | TRADE RESOURCES, INC. | |SUB %: 2.21 | | | | | | | | | | CONTRACT 10103215 | TOTALS | 3,172,491.78| 0.00| 3,573,123.29| 99.9| ************************************************************************************************************************************ KAUFMAN DALLAS/KAUFMAN COUNTY LINE | 13.189 | 3,165,908.57| 205,588.57| 1,875,345.54| 59.2| IH 20 0.21 MI WEST OF ROSEHILL ROAD | | | | | | 0095-14-016 | | | | | | IM 0205(127) 2" HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 11-16-11 WORK BEGAN- 04-10-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-15-12 | | | | | | CONTRACT WORKING DAYS- 83 ADDL DAYS GRANTED- 89 | | | | | | WORKING DAYS CHARGED- 119 PERCENT TIME USED- 69 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0095-14-016 | | | | | | BUYERS BARRICADES, INC. | |SUB %: 0.27 | | | | DUSTROL, INC. | |SUB %: 1.34 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 5.17 | | | | W.O.E. CONSTRUCTION | |SUB %: 1.62 | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 2.27 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.09 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.37 | | | | | | | | | | CONTRACT 10113014 | TOTALS | 3,165,908.57| 205,588.57| 1,875,345.54| 59.2| ************************************************************************************************************************************ NAVARRO CR NE 0070, 3.5 MI E OF IH 45 | 0.320 | 1,416,000.00| 82,994.58| 593,011.56| 41.8| CR CHAMBERS CREEK | | | | | | 0918-18-123 | | | | | | BR 2011(796) REPL BR & APPR | | | | | | | | | | | | WORK ORDER- 05-22-12 WORK BEGAN- 08-21-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-21-12 | | | | | | CONTRACT WORKING DAYS- 251 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 182 PERCENT TIME USED- 72 | | | | | | | | | | | | EMPIRE CIVIL CONSTRUCTION, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-18-123 | | | | | | FORTSON CONTRACTING, INC. | |SUB %: 3.13 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.58 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.97 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 3.52 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 8.51 | | | | N.L. SCHUTTE FOUNDATION DRILLING, INC. | |SUB %: 5.11 | | | | | | | | | | CONTRACT 04123225 | TOTALS | 1,416,000.00| 82,994.58| 593,011.56| 41.8| ************************************************************************************************************************************ NAVARRO FREESTONE COUNTY LINE | 3.377 | 2,218,764.93| 0.00| 0.00| 0.0| IH 45 CR 507 | | | | | | 0166-01-047 | | | | | | IM 0453(133) EDGE RP, BS REP, LEV-UP OV | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 124 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0166-01-047 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133021 | TOTALS | 2,218,764.93| 0.00| 0.00| 0.0| ************************************************************************************************************************************ NAVARRO VARIOUS LOCATIONS ON STATE HIGHWAYS | 0.002 | 2,030,182.90| 0.00| 1,848,934.15| 91.3| VA IN NAVARRO COUNTY | | | | | | 0918-18-102 | | | | | | STP 1102(028) CURB RAMPS | | | | | | | | | | | | WORK ORDER- 07-06-11 WORK BEGAN- 07-20-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-22-11 | | | | | | CONTRACT WORKING DAYS- 225 ADDL DAYS GRANTED- 11 | | | | | | WORKING DAYS CHARGED- 242 PERCENT TIME USED- 102 | | | | | | | | | | | | ENCINO LANDSCAPE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-18-102 | | | | | | ROAD MASTER STRIPING LLC | |SUB %: 1.36 | | | | CLASSIC TEJAS CONSTRUCTION, INC. | |SUB %: 1.28 | | | | HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, CORP. | |SUB %: 0.00 | | | | | | | | | | CONTRACT 05113221 | TOTALS | 2,030,182.90| 0.00| 1,848,934.15| 91.3| ************************************************************************************************************************************ NAVARRO FREESTONE COUNTY LINE (WEST) | 9.318 | 2,482,686.04| 930,258.52| 1,190,500.77| 47.9| FM 416 FREESTONE COUNTY LINE (EAST) | | | | | | 0998-03-024 | | | | | | STP 2012(636)HES GR, BASE, PVMT, PVMT MARKINGS | | | | | | | | | | | | WORK ORDER- 08-21-12 WORK BEGAN- 03-08-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-20-12 | | | | | | CONTRACT WORKING DAYS- 73 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 39 PERCENT TIME USED- 53 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0998-03-024 | | | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 9.89 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.24 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 2.79 | | | | J & M CONTRACTING, COMPANY | |SUB %: 1.34 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.91 | | | | | | | | | | CONTRACT 07123222 | TOTALS | 2,482,686.04| 930,258.52| 1,190,500.77| 47.9| ************************************************************************************************************************************ NAVARRO 28TH STREET | 1.351 | 9,138,952.54| 311,165.77| 5,010,049.64| 54.8| SH 31 15TH ST IN THE CITY OF CORSICANA | | | | | | 0162-04-047 | | | | | | C 162-4-47 STRM SEWERS&INLETS;REP CONC PAV;ADA | | | | | | | | | | | | WORK ORDER- 09-14-10 WORK BEGAN- 07-22-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-13-11 | | | | | | CONTRACT WORKING DAYS- 532 ADDL DAYS GRANTED- 73 | | | | | | WORKING DAYS CHARGED- 455 PERCENT TIME USED- 75 | | | | | | | | | | | | LONE STAR CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0162-04-047 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.51 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.98 | | | | ALLSTATE SIGNAL & CONSTRUCTION, LLC | |SUB %: 0.98 | | | | BIG CREEK CONSTRUCTION, LTD. | |SUB %: 8.65 | | | | UNDERGROUND COALITION, INC. | |SUB %: 12.39 | | | | A BROTHERS | |SUB %: 0.97 | | | | RIVER CITIES SAWING, LLC | |SUB %: 0.00 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.49 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.41 | | | | C & C DIRECTIONAL BORING | |SUB %: 0.07 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 2.35 | | | | | | | | | | CONTRACT 08103003 | TOTALS | 9,138,952.54| 311,165.77| 5,010,049.64| 54.8| ************************************************************************************************************************************ NAVARRO ELLIS COUNTY LINE | 9.694 | 2,796,268.18| 201,208.96| 1,493,177.48| 53.3| FM 55 SH 22 | | | | | | 1451-03-013 | | | | | | STP 2012(753)HES GR, BASE, PVMT, PVMT MARKINGS | | | | | | | | | | | | WORK ORDER- 09-24-12 WORK BEGAN- 11-28-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-23-12 | | | | | | CONTRACT WORKING DAYS- 193 ADDL DAYS GRANTED- 7 | | | | | | WORKING DAYS CHARGED- 101 PERCENT TIME USED- 50 | | | | | | | | | | | | KNIFE RIVER CORPORATION - SOUTH | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1451-03-013 | | | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.50 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 11.30 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 2.66 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.73 | | | | 3LW MANAGEMENT, LLC | |SUB %: 2.49 | | | | | | | | | | CONTRACT 08123032 | TOTALS | 2,796,268.18| 201,208.96| 1,493,177.48| 53.3| ************************************************************************************************************************************ ROCKWALL INTERCHANGE AT ERBY CAMPBELL BLVD | 1.383 | 19,988,908.62| 237,829.09| 577,446.91| 2.8| IH 30 . | | | | | | 0009-12-074 | | | | | | IM 0301(058) STR,GRD,BASE,CON PVMT,SIGNS,MRKS | | | | | | | | | | | | WORK ORDER- 03-28-12 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-24-12 | | | | | | CONTRACT WORKING DAYS- 503 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-12-074 | | | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.59 | | | | STRAIGHT LINE SAWING & SEALING | |SUB %: 0.22 | | | | MASTERPIECE GRINDING & GROOVING, LLC | |SUB %: 0.02 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.95 | | | | SOUTHERN CRUSHED CONCRETE LLC | |SUB %: 0.10 | | | | USA EROSION, INC. | |SUB %: 0.78 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 1.19 | | | | SOUTHERN CRUSHED CONCRETE LLC | |SUB %: 0.10 | | | | WEBBER BARRIER SERVICES, LLC. | |SUB %: 0.61 | | | | PREMIER PAVING, LTD. | |SUB %: 16.34 | | | | DUSTROL, INC. | |SUB %: 0.33 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.00 | | | | | | | | | | CONTRACT 01123002 | TOTALS | 19,988,908.62| 237,829.09| 577,446.91| 2.8| ************************************************************************************************************************************ ROCKWALL FM 3097 | 2.403 | 507,682.92| 33,327.50| 236,641.28| 46.6| FM 740 FM 1140 | | | | | | 1014-03-057 | | | | | | STP 2012(566) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 06-14-12 WORK BEGAN- 10-09-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-30-12 | | | | | | CONTRACT WORKING DAYS- 109 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 106 PERCENT TIME USED- 97 | | | | | | | | | | | | LANDSCAPE CONTRACTING AND IRRIGATION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1014-03-057 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.65 | | | | AQUA BORE | |SUB %: 5.05 | | | | | | | | | | CONTRACT 05123243 | TOTALS | 507,682.92| 33,327.50| 236,641.28| 46.6| ************************************************************************************************************************************ ROCKWALL INTERCHANGE AT JOHN KING BLVD. | 1.619 | 19,585,218.01| 0.00| 19,311,156.71|100.0| IH 30 . | | | | | | 0009-12-073 | | | | | | C 9-12-73 STR, GRD, BASE & CONC PVT | | | | | | | | | | | | WORK ORDER- 09-29-09 WORK BEGAN- 09-13-10 | |**************************************************| | DATE WORK COMPLETED- 04-25-13 TIME COMPUTED- 03-28-10 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 452 ADDL DAYS GRANTED- 53 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 499 PERCENT TIME USED- 98 | |**************************************************| | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-12-073 | | | | | | SCOTT DERR PAINTING CO | |SUB %: 0.44 | | | | RESONANT MACHINES | |SUB %: 0.19 | | | | BREDA COMPANY, INC. | |SUB %: 0.86 | | | | CRAIG OLDEN, INC. | |SUB %: 0.66 | | | | EVANS ENVIRONMENTAL CONTRACTING, LLC. | |SUB %: 1.89 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.06 | | | | LONGHORN UTILITIES, INC. | |SUB %: 4.12 | | | | MELS ELECTRIC, L.P. | |SUB %: 2.17 | | | | SOUTHWEST CRUSHING, LLC | |SUB %: 0.37 | | | | PREMIER PAVING, LTD. | |SUB %: 9.60 | | | | TEXAS INLETS, INC. | |SUB %: 1.39 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.44 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.58 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 1.60 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.29 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.20 | | | | C.B. SERVICES, INC. | |SUB %: 0.41 | | | | RICE TUNNELING & BORING, INC. | |SUB %: 0.04 | | | | HOLY BROS SERVICES LP | |SUB %: 0.02 | | | | JERRY"S PIER DRILLING | |SUB %: 0.00 | | | | SYNERGY SIGNS & SERVICES | |SUB %: 0.27 | | | | | | | | | | CONTRACT 07093022 | TOTALS | 19,585,218.01| 0.00| 19,311,156.71|100.0| ************************************************************************************************************************************ ROCKWALL FM 3097 | 2.403 | 12,283,664.39| 0.00| 13,689,672.22| 99.9| FM 740 FM 1140 | | | | | | 1014-03-039 | | | | | | C 1014-3-39 GRADING STRS, BASE & SURF | | | | | | | | | | | | WORK ORDER- 09-14-09 WORK BEGAN- 09-23-10 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 03-13-10 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 476 ADDL DAYS GRANTED- 110 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 581 PERCENT TIME USED- 99 | |**************************************************| | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1014-03-039 | | | | | | CRAIG OLDEN, INC. | |SUB %: 0.70 | | | | BRENDA PRICE TRUCKING | |SUB %: 2.50 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.39 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.35 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.02 | | | | LARRETT, INC. | |SUB %: 6.96 | | | | MELS ELECTRIC, L.P. | |SUB %: 3.18 | | | | METRO CUTTING AND SEALING, INC. | |SUB %: 0.33 | | | | PREMIER PAVING, LTD. | |SUB %: 12.27 | | | | SOUTHWEST CRUSHING, LLC | |SUB %: 0.11 | | | | TEXAS INLETS, INC. | |SUB %: 2.61 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.70 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.56 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 1.39 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.21 | | | | TEXAS ENVIRONMENTAL MANAGEMENT, INC | |SUB %: 1.08 | | | | BREDA COMPANY, INC. | |SUB %: 0.81 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.75 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.02 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.02 | | | | RICE TUNNELING & BORING, INC. | |SUB %: 0.06 | | | | HOLY BROS SERVICES LP | |SUB %: 0.10 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.17 | | | | | | | | | | CONTRACT 08093205 | TOTALS | 12,283,664.39| 0.00| 13,689,672.22| 99.9| ************************************************************************************************************************************ ROCKWALL SH 205 | 5.364 | 3,714,076.80| 130,786.88| 4,028,181.93| 99.9| FM 552 SH 66 | | | | | | 1017-01-014 | | | | | | STP 1102(262)HES GR, BASE, PVMT, PVMT MKGS, SIGNS | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 01-06-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-13-11 | | | | | | CONTRACT WORKING DAYS- 188 ADDL DAYS GRANTED- 29 | | | | | | WORKING DAYS CHARGED- 330 PERCENT TIME USED- 152 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1017-01-014 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.71 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.42 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.47 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.73 | | | | USA EROSION, INC. | |SUB %: 0.85 | | | | J & M CONTRACTING, COMPANY | |SUB %: 11.14 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.41 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.02 | | | | | | | | | | CONTRACT 08113050 | TOTALS | 3,714,076.80| 130,786.88| 4,028,181.93| 99.9| ************************************************************************************************************************************ ROCKWALL AT BERRY CREEK | 0.172 | 1,969,764.96| 1,000.00| 120,695.00| 6.1| SH 205 . | | | | | | 0451-01-047 | | | | | | BR 2012(680) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 10-12-12 WORK BEGAN- 03-05-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-11-12 | | | | | | CONTRACT WORKING DAYS- 334 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 69 PERCENT TIME USED- 20 | | | | | | | | | | | | IOWA BRIDGE & CULVERT, LC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0451-01-047 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.93 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 4.61 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.82 | | | | A.M.S. COMPANY, INC. | |SUB %: 4.66 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 4.59 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.14 | | | | FORTSON CONTRACTING, INC. | |SUB %: 3.41 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 11.44 | | | | | | | | | | CONTRACT 08123034 | TOTALS | 1,969,764.96| 1,000.00| 120,695.00| 6.1| ************************************************************************************************************************************ ROCKWALL AT LONG BRANCH | 0.208 | 2,519,945.88| 525,918.50| 1,506,164.93| 59.7| FM 550 . | | | | | | 1014-03-050 | | | | | | BR 2012(681) REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 09-17-12 WORK BEGAN- 01-09-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-03-12 | | | | | | CONTRACT WORKING DAYS- 502 ADDL DAYS GRANTED- 190 | | | | | | WORKING DAYS CHARGED- 94 PERCENT TIME USED- 30 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1014-03-050 | | | | | | FOUNDATION DRILLERS, INC. | |SUB %: 4.95 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.13 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 14.82 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.60 | | | | FORTSON CONTRACTING, INC. | |SUB %: 3.02 | | | | DUSTROL, INC. | |SUB %: 0.32 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 1.05 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.14 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 2.08 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.74 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.29 | | | | | | | | | | CONTRACT 08123235 | TOTALS | 2,519,945.88| 525,918.50| 1,506,164.93| 59.7| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 1,615,916,020.63 DISTRICT ESTIMATES THIS MONTH 27,944,579.94 DISTRICT TOTAL ESTIMATES PAID TO DATE 787,020,396.66