Monthly State Let Construction Report For Dallas District As Of Feb 09, 2018 Page 1 Of 7

Last Update: Friday, February 09, 2018
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyDALLAS
HighwaySH 78
FromGARLAND RD FROM SOUTH OF TRANQUILLA
ToSP 244 (NORTHWEST HIGHWAY)
CSJ0009-02-045
Proj IDCM 2009(433)
Work Type9 INTERSECTION IMPROVEMENTS
 
2.8636587481.9656112.730.8
CountyDALLAS
HighwaySH 78
FromGARLAND RD FROM SOUTH OF TRANQUILLA
ToSP 244 (NORTHWEST HIGHWAY)
CSJ0009-02-056
Proj IDCM 2010(230)
Work TypeROW ACQ RELO ASSIST & UTIL ADJ
 
0.0011192134.570.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-20-15
Work Began00-00-00
Work Completed
Time Computed08-18-15
Contract Working Days491
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0009-02-045
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02153028
Totals7779616.530.0056112.730.7

CountyDALLAS
HighwaySH 66
FromWESTERN CITY LIMIT OF ROWLET
ToDALROCK RD
CSJ0009-03-045
Proj IDNH 1702(443)
Work TypeLANDSCAPE ENHANCEMENT
 
4.4841398334.69804149.1057.5
CountyROCKWALL
HighwaySH 66
FromDALROCK ROAD
ToHERITAGE PARKWAY
CSJ0009-04-068
Proj IDNH 1702(443)
Work TypeLANDSCAPE ENHANCEMENT
 
0.890351665.31108911.8930.9
Work Order07-14-17
Work Began08-07-17
Work Completed
Time Computed08-07-17
Contract Working Days253
Addl Days Granted0
Working Days Charged117
Percent Time Used46
Contractor(s)
AALC, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0009-03-045
BUYERS BARRICADES, INC. (0.79)
DOWN UNDER CONSTRUCTION (2.76)
WRECKHOUSE DEMOLITION, LLC (10.00)
KICKER UNDERGROUND CONSTRUCTION, LLC (3.25)
Contract #06173245
Totals1750000.00221538.36913060.9952.1

CountyROCKWALL
HighwaySH 66
From0.1 MILE WEST OF FM 1141
ToCOLLIN COUNTY LINE
CSJ0009-04-061
Proj IDSTP 2016(819)HES
Work TypeGR, BASE, PVMT, PVMT MKGS, SIGNS
 
8.92510521700.236175053.2458.6
CountyROCKWALL
HighwaySH 66
FromFM 1141
ToE COUNTY LINE ROAD (COUNTY LINE)
CSJ0009-04-065
Proj IDCC 9-4-65
Work TypeADD TURN LANES
 
8.7722605686.771016702.4339.0
CountyCOLLIN
HighwaySH 66
FromROCKWALL COUNTY LINE
ToHUNT COUNTY LINE
CSJ0009-05-011
Proj IDSTP 2016(820)
Work TypeGR,BASE, PVMT, PVMT MKGS, SIGNS
 
2.1562744978.341352321.3749.2
Work Order12-07-16
Work Began03-22-17
Work Completed
Time Computed03-20-17
Contract Working Days505
Addl Days Granted0
Working Days Charged208
Percent Time Used41
Contractor(s)
OLDCASTLE MATERIALS TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0009-04-061
MICA CORPORATION (0.62)
SYNERGY SIGNS & SERVICES, LLC (0.91)
FORTSON CONTRACTING, INC. (1.21)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (3.05)
TEX OP CONSTRUCTION, LP (4.72)
DUSTROL, INC. (1.01)
DALLAS LITE AND BARRICADE INC. (0.48)
C & J TREE SERVICE (0.26)
TOTAL HIGHWAY MAINTENANCE, LLC (1.28)
J & M CONTRACTING, COMPANY (9.93)
DURABLE SPECIALTIES, INC. (0.56)
ALTUS TRAFFIC MANAGEMENT LLC (0.06)
W.O.E. CONSTRUCTION (0.00)
AR DANIEL CONSTRUCTION SERVICES, INC. (0.37)
Contract #03163001
Totals15872365.34192682.208544077.0453.8

CountyDALLAS
HighwayIH 30
FromIH 635
ToCHAHA RD.
CSJ0009-11-227
Proj IDCM 1402(021)
Work TypeITS INSTALLATION
 
8.4002749311.962213833.7480.5
Work Order05-08-15
Work Began08-10-15
Work Completed
Time Computed08-06-15
Contract Working Days200
Addl Days Granted0
Working Days Charged153
Percent Time Used76
Contractor(s)
MICA CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0009-11-227
LAYFIELD CONSTRUCTION, INC (0.49)
BUYERS BARRICADES, INC. (1.25)
DYNAMIC VISION CO., INC. (3.88)
KLP COMMERCIAL, LLC (3.65)
WOLFE CONSTRUCTION GROUP, INC. (0.17)
PANIOLO CONSTRUCTION SERVICES, LLC (0.63)
Contract #08143015
Totals2749311.960.002213833.7480.5

CountyDALLAS
HighwayIH 30
FromAT ST FRANCIS
To.
CSJ0009-11-233
Proj IDSTP 1602(322)HES
Work TypeCONSTRUCT PEDESTRIAN OVER/UNDERPASS
 
0.1742254488.45905844.3940.1
Work Order09-15-16
Work Began05-12-17
Work Completed
Time Computed09-15-16
Contract Working Days247
Addl Days Granted0
Working Days Charged123
Percent Time Used49
Contractor(s)
RAMA ENTERPRISES, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0009-11-233
TOTAL HIGHWAY MAINTENANCE, LLC (1.03)
WYLIE DRILLING & DRAINAGE, INC. (2.08)
BOWMAN ENGINEERING & CONSTRUCTION, INC. (0.10)
ODUM SERVICES, L.P. (1.67)
Contract #07163026
Totals2254488.4519700.00905844.3940.1

CountyROCKWALL
HighwayIH 30
FromAT FM 3549
To.
CSJ0009-12-072
Proj IDPTF 2015(062)
Work TypeSTR, GRD, BASE & CONC PAVT
 
1.70432882301.0014780929.2344.9
Work Order08-05-16
Work Began09-20-16
Work Completed
Time Computed09-20-16
Contract Working Days600
Addl Days Granted0
Working Days Charged392
Percent Time Used65
Contractor(s)
SEMA CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0009-12-072
HAYDON BUILDING CORP. (19.74)
TOTAL HIGHWAY MAINTENANCE, LLC (0.82)
SOUTH TEXAS PAINTING COMPANY (0.24)
K & S UTILITY CONTRACTORS, INC. (7.08)
FARR FOUNDATION, INC. (0.73)
MARCOM"S MOWING SERVICE, LLC (0.13)
HOUSTON SAWING & DRILLING (0.01)
MEL"S ELECTRIC SERVICE, INC. (1.48)
PRIMATE CONSTRUCTION, INC. (0.07)
WOLFE CONSTRUCTION GROUP, INC. (0.85)
MCL CONTRACTING, LLC (0.09)
LINDAMOOD DEMOLITION, INC. (0.19)
WYLIE DRILLING & DRAINAGE, INC. (0.46)
FORTSON CONTRACTING, INC. (0.28)
BRJ PAVING INCORPORATION (1.01)
PREMIER PAVING, LTD. (11.94)
RAMBO CONTRACTING, INC. (1.24)
PERFORMANCE EQUIPMENT SERVICE (1.47)
W.O.E. CONSTRUCTION (0.15)
ROYAL REBAR (0.44)
OSCAR ORDUNO, INC. (0.57)
ROADWAY SPECIALTIES, INC. (0.07)
FISHER SAND & GRAVEL CO. (0.72)
BOWMAN ENGINEERING & CONSULTING, INC (0.02)
URBAN INFRACONSTRUCTION, LLC. (0.01)
SLATON BROTHERS, INC. (2.86)
SOUTHEAST GRINDING & GROOVING, LLC (0.00)
Contract #02163002
Totals32882301.001158059.3014780929.2344.9

CountyROCKWALL
HighwayIH 30
FromDALLAS COUNTY LINE
ToHUNT COUNTY LINE
CSJ0009-12-212
Proj IDNH 1702(084)
Work TypePAVEMENT REPAIR & PAVEMENT MARKINGS
 
14.9932315893.571594932.5368.8
Work Order06-14-17
Work Began09-05-17
Work Completed
Time Computed09-05-17
Contract Working Days121
Addl Days Granted0
Working Days Charged91
Percent Time Used75
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0009-12-212
TOTAL HIGHWAY MAINTENANCE, LLC (8.48)
W.O.E. CONSTRUCTION (4.20)
BRENDA PRICE TRUCKING (5.89)
DUSTROL, INC. (1.16)
ALTUS TRAFFIC MANAGEMENT LLC (0.14)
Contract #05173035
Totals2315893.57174414.501594932.5368.8

CountyROCKWALL
HighwayIH 30
FromDALLAS COUNTY LINE
ToHUNT COUNTY LINE
CSJ0009-12-216
Proj IDCM 2017(081)
Work TypeINSTALLATION OF WIRELESS ITS SYSTEM
 
14.9931105995.621104813.3699.8
Work Order10-21-16
Work Began02-07-17
Work Completed
Time Computed01-19-17
Contract Working Days70
Addl Days Granted0
Working Days Charged65
Percent Time Used92
Contractor(s)
FLORIDA TRAFFIC CONTROL DEVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0009-12-216
ALTUS TRAFFIC MANAGEMENT LLC (4.66)
ODUM SERVICES, L.P. (0.73)
DALLAS FOUNDATION DRILLING CO., INC. (1.74)
TX DOWN UNDER CONSTRUCTION LLC (1.22)
Contract #09163016
Totals1105995.620.001104813.3699.8

CountyCOLLIN
HighwayUS 75
FromPGBT
ToPARK BLVD
CSJ0047-06-133
Proj IDSTP 1502(083)MM
Work TypeSTR, PVMT, SIGNS, PVMT MKGS
 
1.39137466722.1816911007.1245.1
Work Order02-26-16
Work Began05-09-16
Work Completed
Time Computed05-09-16
Contract Working Days750
Addl Days Granted0
Working Days Charged500
Percent Time Used66
Contractor(s)
ZACHRY CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0047-06-133
MOBILE ENTERPRISES, INC. (0.11)
HIRSCHFELD STEEL CO. (2.12)
HEIDENFELS ENTERPRISES (2.95)
HERDEZ TRUCKING, INC. (2.44)
MICA CORPORATION (5.14)
TOTAL HIGHWAY MAINTENANCE, LLC (1.49)
ANTIGO CONSTRUCTION, INC. (0.15)
EROSION CONTROL MANAGEMENT SERVICES (0.25)
UNDER CONSTRUCTION INC. (0.14)
PREMIER PAVING, LTD. (3.74)
PANIOLO CONSTRUCTION SERVICES, LLC (1.65)
ANCORTEX, INC. (8.32)
ROYAL REBAR (5.66)
DURABLE SPECIALTIES, INC. (1.36)
LAYFIELD CONSTRUCTION, INC (0.15)
RG PAINTING, INC. (0.12)
ACT SAW CUTTING & REMOVAL (0.00)
A-CORE CONCRETE CUTTING, INC. (0.10)
A & A CONSTRUCTION (0.08)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.29)
DUSTROL, INC. (0.25)
Contract #11153202
Totals37466722.181224946.4316911007.1245.1

CountyCOLLIN
HighwayUS 75
FromSPRING CREEK PARKWAY
ToSH 121 (SAM RAYBURN TOLLWAY)
CSJ0047-06-139
Proj IDC 47-6-139
Work TypeGRADE, PAVEMENT, DRAINAGE, STRUCTUR
 
6.50947531666.9451353544.2199.9
Work Order03-04-14
Work Began04-24-14
Work Completed
Time Computed03-20-14
Contract Working Days766
Addl Days Granted104
Working Days Charged870
Percent Time Used100
Contractor(s)
MCM
SUBCONTRACTOR(S) FOR CCSJ: 0047-06-139
DALLAS LITE AND BARRICADE INC. (3.21)
RUSSO CORPORATION (0.66)
TOTAL HIGHWAY MAINTENANCE, LLC (1.07)
INTEGRATED ROADWAY SERVICES, INC. (12.66)
FORTSON CONTRACTING, INC. (0.79)
GHB EQUIPMENT COMPANY, L.L.C. (0.36)
W.O.E. CONSTRUCTION (7.22)
USA SWPPP INSPECTIONS, INC. (1.34)
ROBERTS TRUCKING (1.66)
SIERRA HORIZONTAL BORING, LLC (0.05)
SLATON BROTHERS, INC. (14.18)
CRAIG OLDEN, INC. (3.06)
JAGOE-PUBLIC COMPANY (3.57)
GREENER PASTURES LANDSCAPE, INC. (1.25)
Contract #12133001
Totals47531666.9440706.3551353544.2199.9

CountyCOLLIN
HighwayUS 75
FromDALLAS COUNTY LINE
ToFM 3038
CSJ0047-06-159
Proj IDNH 2017(885)
Work TypeFULL DEPTH CONCRETE REPAIR
 
14.601564877.00593429.3299.9
CountyCOLLIN
HighwayUS 75
FromFM 3038
ToTELEPHONE RD
CSJ0047-14-083
Proj IDNH 2017(885)
Work TypeFULL DEPTH CONCRETE REPAIR
 
5.86292932.0096562.6099.9
Work Order04-24-17
Work Began09-07-17
Work Completed
Time Computed09-07-17
Contract Working Days74
Addl Days Granted0
Working Days Charged73
Percent Time Used98
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0047-06-159
W.O.E. CONSTRUCTION (8.47)
BRENDA PRICE TRUCKING (3.12)
Contract #03173022
Totals657809.0058643.08689991.9299.9

CountyDALLAS
HighwayUS 75
FromSP 366/WOODALL RODGERS FWY
ToIH 635 IN DALLAS
CSJ0047-07-229
Proj IDNH 2016(511)
Work TypeLANDSCAPE
 
9.113834793.50289359.6038.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-15-16
Work Began11-29-16
Work Completed
Time Computed10-31-16
Contract Working Days148
Addl Days Granted0
Working Days Charged197
Percent Time Used133
Contractor(s)
DBI SERVICES, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0047-07-229
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08163219
Totals834793.500.00289359.6038.2

CountyCOLLIN
HighwayUS 75
FromNORTH OF MELISSA RD
ToSOUTH OF FM 455 INTERCHANGE
CSJ0047-14-069
Proj IDC 47-14-69
Work TypeGRADING, BASE, PVMT, STR, SIGNS
 
5.94779417673.4337442192.4347.1
Work Order03-16-16
Work Began07-05-16
Work Completed
Time Computed06-14-16
Contract Working Days884
Addl Days Granted0
Working Days Charged457
Percent Time Used51
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0047-14-069
DALLAS LITE AND BARRICADE INC. (0.18)
ENVIRONMENTAL SAFETY SERVICES, INC. (0.41)
GJ SEEDING, LLC (0.28)
HOUSTON SAWING & DRILLING (0.02)
JAGOE-PUBLIC COMPANY (0.86)
LAYFIELD CONSTRUCTION, INC (0.48)
MICA CORPORATION (1.11)
NE-TEX CONSTRUCTION, LTD. (0.15)
NORTH TEXAS CONTRACTING, INC. (4.64)
PANIOLO CONSTRUCTION SERVICES, LLC (1.22)
ROYAL REBAR (1.72)
SOUTHERN CROSS CONTRACTORS, LLC (0.39)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (4.00)
TEXAS SHAFTS, INC. (0.92)
RMI WORLDWIDE, LLC (0.09)
STRIPING TECHNOLOGY, L.P. (0.67)
RG PAINTING (0.07)
LMH SAW & SEAL, LLC (0.25)
MCL CONTRACTING, LLC (0.04)
ANCORTEX, INC. (0.19)
W.O.E. CONSTRUCTION (1.72)
HULCHER SERVICES INC. (0.02)
Contract #12153234
Totals79417673.431836609.3537442192.4347.1

CountyCOLLIN
HighwayUS 75
FromSOUTH OF US 380
ToNORTH OF FM 455
CSJ0047-14-080
Proj IDCM 2017(920)
Work TypeINSTALLATION OF WIRELESS ITS
 
10.258966634.97115392.6511.9
CountyDALLAS
HighwayIH 20
FromIH 635
ToKAUFMAN COUNTY LINE
CSJ0095-13-037
Proj IDCM 2017(920)
Work TypeINSTALLATION OF WIRELESS ITS
 
6.415697636.681021933.9299.9
CountyKAUFMAN
HighwayIH 20
FromDALLAS COUNTY LINE
ToROSEHILL RD
CSJ0095-14-026
Proj IDCM 2017(920)
Work TypeINSTALLATION OF WIRELESS ITS
 
12.895830467.70145640.5017.5
CountyKAUFMAN
HighwayIH 20
FromROSEHILL RD
ToVAN ZANDT COUNTY LINE
CSJ0495-01-072
Proj IDCM 2017(920)
Work TypeINSTALLATION OF WIRELESS ITS
 
14.044919417.69134736.9114.6
Work Order07-20-17
Work Began10-18-17
Work Completed
Time Computed10-18-17
Contract Working Days218
Addl Days Granted0
Working Days Charged51
Percent Time Used23
Contractor(s)
FLORIDA TRAFFIC CONTROL DEVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0047-14-080
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC (1.71)
ALTUS TRAFFIC MANAGEMENT LLC (1.46)
COMEN ENTERPRISE LLC (1.87)
DALLAS FOUNDATION DRILLING CO., INC. (1.34)
TX DOWN UNDER CONSTRUCTION LLC (1.13)
Contract #06173209
Totals3414157.04188550.881417703.9841.5

CountyCOLLIN
HighwayUS 75
FromAT SH 121 INTERCHANGE
To.
CSJ0047-14-082
Proj IDNH 1702(450)
Work TypeLANDSCAPE ENHANCEMENT
 
0.9302750000.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-23-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days378
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
AALC, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0047-14-082
BUYERS BARRICADES, INC. (0.47)
STOIC CIVIL CONSTRUCTION, INC. (2.96)
Contract #07173222
Totals2750000.000.000.000.0

CountyDALLAS ETC
HighwaySH 342 ETC
FromELLIS COUNTY LINE
ToWEST BELTLINE
CSJ0048-01-064
Proj IDNH 2018(118)
Work TypeSEAL COAT,PVMT MKGS
 
248.25211384511.202631913.2523.1
Work Order11-10-17
Work Began01-22-18
Work Completed
Time Computed01-22-18
Contract Working Days150
Addl Days Granted0
Working Days Charged4
Percent Time Used2
Contractor(s)
BRANNAN PAVING CO., LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0048-01-064
BARRICADES PLUS, LLC (1.53)
STRIPE-A-ZONE, INC. (16.77)
Contract #10173202
Totals11384511.20907874.522631913.2523.1

CountyELLIS
HighwayUS 77
FromSOUTH COLLEGE STREET
ToPARK HILLS DRIVE
CSJ0048-03-091
Proj IDSTP 2018(541)
Work TypePVMT REPAIR,LEVEL-UP AND OVERLAY
 
2.740829774.110.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days81
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
KNIFE RIVER CORPORATION - SOUTH
SUBCONTRACTOR(S) FOR CCSJ: 0048-03-091
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02183211
Totals829774.110.000.000.0

CountyELLIS ETC
HighwaySH 342 ETC
FromUS 77
ToDALLAS COUNTY LINE
CSJ0048-03-093
Proj IDNH 2017(183)
Work TypeSEAL COAT,PVMT MARKINGS
 
234.25111359831.3411055290.67100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order12-05-16
Work Began02-21-17
Work Completed01-30-18
Time Computed02-21-17
Contract Working Days120
Addl Days Granted6
Working Days Charged125
Percent Time Used99
Contractor(s)
BRANNAN PAVING CO., LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0048-03-093
BARRICADES PLUS, LLC (1.19)
STRIPE-A-ZONE, INC. (14.26)
Contract #10163202
Totals11359831.340.0011055290.67100.0

CountyELLIS
HighwayIH 35E
FromUS 77 SOUTH OF WAXAHACHIE
ToUS 77 NORTH OF WAXAHACHIE
CSJ0048-04-079
Proj IDNH 1502(531)
Work TypeGR, STRS & PAVT
 
10.976126414963.9745550518.4236.0
Work Order01-29-16
Work Began03-15-16
Work Completed
Time Computed03-15-16
Contract Working Days797
Addl Days Granted18
Working Days Charged449
Percent Time Used57
Contractor(s)
OHL USA, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0048-04-079
GJ SEEDING, LLC (0.12)
ALTUS TRAFFIC MANAGEMENT LLC (0.08)
TOTAL HIGHWAY MAINTENANCE, LLC (1.07)
PREMIER PAVING, LTD. (12.43)
A BROTHERS MILLING, LLC (0.81)
INTEGRATED ROADWAY SERVICES, INC. (4.30)
AVANZA CONSTRUCTION & EARTHWORKS, LLC (0.53)
W.O.E. CONSTRUCTION (7.93)
A & R DEMOLITION (0.44)
P G SERVICES (0.07)
DBI SERVICES, LLC (0.03)
AR DANIEL CONSTRUCTION SERVICES, INC. (0.90)
HOUSTON SAWING & DRILLING (0.02)
UNDER CONSTRUCTION INC. (0.31)
OSAGE COMPANIES, LLC (0.18)
ANCORTEX, INC. (1.66)
EL CAMINO TRUCKING, INC. (1.95)
SAR TRANSPORTATION, LLC (1.94)
BREDA COMPANY, INC. (0.72)
A-CORE CONCRETE CUTTING OF TEXAS, INC. (0.07)
PANTHER CREEK TRANSPORTATION, INC. (4.01)
BIG BIRD TREE SERVICE, INC. (0.00)
Contract #08153201
Totals126414963.971166102.2045550518.4236.0

CountyELLIS
HighwayIH 35E
From2 MILES SOUTH OF FM 566 (HILL C/L)
ToUS 77 SOUTH OF WAXAHACHIE
CSJ0048-08-049
Proj IDNH 2016(091)
Work TypeCONC,PAV MRKS
 
18.48135775602.9334625174.0696.9
Work Order12-15-15
Work Began02-01-16
Work Completed
Time Computed02-01-16
Contract Working Days453
Addl Days Granted9
Working Days Charged480
Percent Time Used103
Contractor(s)
OHL USA, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0048-08-049
ALTUS TRAFFIC MANAGEMENT LLC (0.06)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (3.17)
PREMIER PAVING, LTD. (14.36)
TEXOP CONSTRUCTION (1.55)
AVANZA CONSTRUCTION & EARTHWORKS, LLC (1.89)
INTEGRATED ROADWAY SERVICES, INC. (12.47)
BREDA COMPANY, INC. (5.14)
ANCORTEX, INC. (0.43)
STRIPING TECHNOLOGY, L.P. (1.81)
UNDER CONSTRUCTION INC. (0.17)
P G SERVICES (0.24)
DBI SERVICES, LLC (0.19)
MR. DIRT (0.00)
SAR TRANSPORTATION, LLC (0.77)
EL CAMINO TRUCKING, INC. (0.31)
PANTHER CREEK TRANSPORTATION, INC. (0.61)
S&S BRIDGE PAINTING (0.34)
PENHALL COMPANY (0.15)
STRIPES & STOPS COMPANY, INC. (0.67)
SWEEPER KING SERVICES, LLC (0.21)
BLASTERS, INC. (0.12)
Contract #09153002
Totals35775602.93390866.7934625174.0696.9

page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7