Monthly State Let Construction Report For Dallas District As Of Jul 11, 2014 Page 3 Of 8

Last Update: Friday, July 11, 2014
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyCOLLIN
Highway US 380 ETC
From LAKE FOREST DRIVE
To SH 5
CSJ 0135-02-054
Proj ID NH 2014(392)
Work Type FULL DEPTH REPAIR
 
44.157 917408.10 169402.20 293688.20 32.0
Work Order 04-25-14
Work Began 05-19-14
Work Completed  
Time Computed 05-11-14
Contract Working Days 104
Addl Days Granted 0
Working Days Charged 26
Percent Time Used 25
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0135-02-054
W.O.E. CONSTRUCTION(3.73%)
BRENDA PRICE TRUCKING(3.77%)
ALTUS TRAFFIC MANAGEMENT LLC (0.49%)
BTA SERVICES, LTD. (0.86%)
Contract # 02143206
Totals 917408.10 169402.20 293688.20 32.0

CountyCOLLIN
Highway US 380
From WEST OF CR 608 IN FARMERSVILLE
To EAST OF FLOYD RD
CSJ 0135-05-025
Proj ID C 135-5-25
Work Type GR, STRS, PVT, CUL, CURB AND GTRS
 
1.307 18186687.16 422406.03 13041957.02 71.7
Work Order 05-10-12
Work Began 11-05-12
Work Completed  
Time Computed 11-05-12
Contract Working Days 551
Addl Days Granted 23
Working Days Charged 479
Percent Time Used 83
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0135-05-025
BREDA COMPANY, INC.(0.68%)
CONCRETE CUTTING BY BOND (0.21%)
CRAIG OLDEN, INC.(1.58%)
DUSTROL, INC.(0.63%)
FORTSON CONTRACTING, INC.(0.28%)
JUST GROOVING, LTD.(0.01%)
K & S UTILITY CONTRACTORS, INC.(4.42%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(6.11%)
SCOTT DERR PAINTING CO, LLC(0.01%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.11%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.04%)
WYLIE DRILLING & DRAINAGE, INC.(7.43%)
MCL CONTRACTING, LLC (0.77%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.18%)
BRENDA PRICE TRUCKING(0.02%)
SOUTHEAST GRINDING & GROOVING, LLC (0.01%)
GIBSON & ASSOCIATES, INC.(0.24%)
Contract # 07113204
Totals 18186687.16 422406.03 13041957.02 71.7

CountyCOLLIN
Highway FM 3537
From SH 289
To FM 2478
CSJ 0135-12-025
Proj ID C 135-12-25
Work Type WDN GR STRS & SURF
 
4.055 23788820.89 326217.53 9424627.61 39.6
Work Order 10-21-11
Work Began 06-17-13
Work Completed  
Time Computed 04-18-12
Contract Working Days 680
Addl Days Granted 0
Working Days Charged 258
Percent Time Used 37
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0135-12-025
ARLINGTON PAVERS, INC. (0.43%)
CONCRETE CUTTING BY BOND (0.33%)
DALLAS LITE AND BARRICADE INC. (0.24%)
FORTSON CONTRACTING, INC.(0.39%)
INDUS CONSTRUCTION, L.P. (0.96%)
INLET STRUCTURE SPECIALTIES LTD. (5.42%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 17.27%)
ROADWAY SOLUTIONS, INC.(6.35%)
TEX OP CONSTRUCTION, LP(0.64%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.33%)
USA EROSION, INC.(1.69%)
W.O.E. CONSTRUCTION(0.65%)
ALLIANCE GEOTECHNICAL GROUP(0.21%)
HAYWOOD BAKER(0.53%)
TEXAS STAR TRANSPORT, LP (1.24%)
CHRISTINE"S CONCERTE SAWING & SEALING LLC(0.34%)
LAUGHLEY BRIDGE & CONSTRUCTION, INC. (0.24%)
RG PAINTING(0.00%)
Contract # 06113007
Totals 23788820.89 326217.53 9424627.61 39.6

CountyNAVARRO
Highway SH 31
From 28TH STREET
To 15TH ST IN THE CITY OF CORSICANA
CSJ 0162-04-047
Proj ID C 162-4-47
Work Type STRM SEWERS & INLETS;REP CONC PAV;ADA
 
1.351 9138952.54 341660.41 9227827.44 99.9
Work Order 09-14-10
Work Began 07-22-11
Work Completed  
Time Computed 03-13-11
Contract Working Days 532
Addl Days Granted 85
Working Days Charged 757
Percent Time Used 122
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0162-04-047
DALLAS LITE AND BARRICADE INC. (0.51%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.98%)
ALLSTATE SIGNAL & CONSTRUCTION, LLC(0.98%)
BIG CREEK CONSTRUCTION, LTD. (8.65%)
UNDERGROUND COALITION, INC.( 12.39%)
A BROTHERS (0.97%)
RIVER CITIES SAWING, LLC (0.00%)
INDUS CONSTRUCTION, L.P. (0.49%)
W.O.E. CONSTRUCTION(0.41%)
C & C DIRECTIONAL BORING (0.07%)
INLET STRUCTURE SPECIALTIES LTD. (2.35%)
DANRIDGE CONSTRUCTION, LLC.(2.45%)
Contract # 08103003
Totals 9138952.54 341660.41 9227827.44 99.9

CountyNAVARRO
Highway FM 709
From WACO ST. NEAR DAWSON
To 0.7 MILE NORTH OF FM 2555
CSJ 0162-09-035
Proj ID STP 2013(828)HES
Work Type GR, BASE, PVMT, PVMT MARKINGS
 
21.446 4787587.88 127707.08 3099874.13 64.7
Work Order 09-26-13
Work Began 10-23-13
Work Completed  
Time Computed 10-23-13
Contract Working Days 276
Addl Days Granted 0
Working Days Charged 171
Percent Time Used 61
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0162-09-035
J & M CONTRACTING, COMPANY (6.13%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.81%)
TEXAS ALTERNATIVE GRASSER, INC.(0.46%)
SAN-ANN-CO., INC.(0.92%)
STRIPING TECHNOLOGY, L.P.(2.77%)
ALPHA EROSION PRODUCTS, LLC(0.06%)
Contract # 07133232
Totals 4787587.88 127707.08 3099874.13 64.7

CountyNAVARRO
Highway SH 31
From IH 45
To FM 1393
CSJ 0163-01-061
Proj ID STP 2013(778)
Work Type OVERLAY
 
19.693 11564843.88 859568.20 7932632.45 68.5
Work Order 08-19-13
Work Began 09-24-13
Work Completed  
Time Computed 09-24-13
Contract Working Days 317
Addl Days Granted 0
Working Days Charged 194
Percent Time Used 61
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0163-01-061
SIGNATURE CONTRACTING SERVICES, L.L.C. (0.30%)
COWBELL TRAFFIC SERVICES, INC. (0.26%)
LONE STAR BARRIER SERVICES, LLC(0.11%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.19%)
O. TREVINO CONSTRUCTION, LLC ( 13.78%)
STRIPING TECHNOLOGY, L.P.(1.88%)
Contract # 06133204
Totals 11564843.88 859568.20 7932632.45 68.5

CountyELLIS
Highway US 287
From BUS US 287 IN ENNIS
To SOUTH OF SH 34
CSJ 0172-08-050
Proj ID DMO 2005(474)
Work Type WIDENING OF A NON - FREEWAY FACILITY
 
3.181 34561014.77 0.00 33780245.23 98.7
CountyELLIS
Highway US 287
From BUS US 287 IN ENNIS
To SOUTH OF SH 34
CSJ 0172-08-054
Proj ID RW 172-8-54
Work Type ROW ACQ., AND UTL. ADJ.
 
2.797 93744.00 0.00 93658.00 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-07-10
Work Began 03-09-10
Work Completed  
Time Computed 03-09-10
Contract Working Days 563
Addl Days Granted 195
Working Days Charged 888
Percent Time Used 117
Contractor(s)
SAFECO INSURANCE COMPANIES
SUBCONTRACTOR(S) FOR CCSJ: 0172-08-050
COWTOWN TRAFFIC CONTROL, INC.(0.04%)
FORTSON CONTRACTING, INC.(0.42%)
MURRAY CONSTRUCTION(0.19%)
GIBSON & ASSOCIATES, INC.(0.03%)
SCOTT DERR PAINTING CO (0.06%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.38%)
AK MILLING, LLC(0.46%)
WEBBER BARRIER SERVICES, INC.(0.61%)
F & W ELECTRICAL CONTRACTORS, INC. (0.65%)
JAMES CONSTRUCTION GROUP, L.L.C. ( 10.21%)
JAG TRUCKING INC (6.20%)
SAR TRANSPORTATION, LLC(2.64%)
S & S TRUCKING (0.17%)
APAC-TEXAS, INC. ( 25.44%)
V. FERNANDEZ TRUCKING, INC.(0.43%)
EAGLE AGGREGATE TRANSPORTATION, LLC. (1.00%)
ALLIED FENCE COMPANY (0.04%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.00%)
GREAT WESTERN ERECTORS (0.05%)
WEBBER BARRIER SERVICES, INC.(0.32%)
WYLIE DRILLING & DRAINAGE, INC.(0.76%)
RIVER CITIES SAWING LLC(0.02%)
SCOTT DERR PAINTING CO (0.01%)
J.L. STEEL REINFORCING, LLC(0.19%)
METRO CUTTING AND SEALING, INC.(0.00%)
CIRCLE H CONTRACTORS, L.P. (0.05%)
COWBOY CORING CORPORATION(0.00%)
GEORGETOWN GRASS AND LAWN COMPANY, INC.(0.02%)
LINDSEY CONTRACTORS, INC.(0.17%)
EXTREME ENVIRONMENTAL SERVICES (0.00%)
ANDERSON COLUMBIA CO., INC.( 63.13%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.94%)
RANGER EXCAVATING, L.P.(4.12%)
DUSTROL, INC.(0.09%)
BRENDA PRICE TRUCKING(1.68%)
EMPIRE CIVIL CONSTRUCTION, L.L.C.(9.74%)
BIG CREEK CONSTRUCTION, LTD. ( 16.41%)
UNDERGROUND COALITION, INC.(2.26%)
ECO-REBAR CO (0.02%)
NORTH TEXAS REBAR, LLC (0.07%)
CLAYCON CONSTRUCTION, LLC(1.22%)
MP GRINDING & GROOVING, LLC(0.02%)
MTM EXCAVATION (0.06%)
GREAT AMERICAN INSURANCE COMPANY (2.19%)
WEST TEXAS RUMBLE STRIP(0.01%)
Contract # 10093001
Totals 34654758.77 0.00 33873903.23 98.7

CountyKAUFMAN
Highway SH 34 ETC
From 0.418 MI N OF ELLIS CO LINE
To 1.732 MI SW OF FM 1388
CSJ 0173-02-070
Proj ID STP 2014(647)HESG
Work Type PROFILE PAVEMENT MARKINGS
 
67.094 838275.06 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-16-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 61
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TOTAL HIGHWAY MAINTENANCE, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0173-02-070
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05143022
Totals 838275.06 0.00 0.00 0.0

CountyKAUFMAN
Highway SH 34
From US 175 INTERCHANGE
To SH 243 (MULBERRY STREET) IN KAUFMAN
CSJ 0173-03-015
Proj ID DMO 1102(478)
Work Type GR, STRS & SURF
 
1.842 23009384.99 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 506
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
AUSTIN BRIDGE & ROAD, LP
SUBCONTRACTOR(S) FOR CCSJ: 0173-03-015
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03143202
Totals 23009384.99 0.00 0.00 0.0

CountyKAUFMAN
Highway SH 34
From AIRPORT RD
To HIGH ST IN TERRELL
CSJ 0173-04-024
Proj ID RW 173-4-24
Work Type ACQUISITION OF ROW
 
0.303 663290.10 0.00 693465.56 99.9
CountyKAUFMAN
Highway SH 34
From AIRPORT RD
To HIGH ST. IN TERRELL
CSJ 0173-04-025
Proj ID STP 2011(798)
Work Type GR, PVMT, & GRADE SEP RR O / P
 
1.032 14656545.90 0.00 15063515.34 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-14-11
Work Began 10-04-11
Work Completed  
Time Computed 09-12-11
Contract Working Days 440
Addl Days Granted 114
Working Days Charged 554
Percent Time Used 100
Contractor(s)
AUI CONTRACTORS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0173-04-025
DUSTROL, INC.(0.51%)
HAYWARD BAKER, INC.(1.49%)
INLET STRUCTURE SPECIALTIES LTD. (3.97%)
NORTH TEXAS REBAR, LLC (7.18%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(6.66%)
SCOTT DERR PAINTING CO (0.90%)
STORM WATER MANAGEMENT, INC. (0.68%)
T-BAR FENCE, INC.(0.48%)
TEXAS SHAFTS, INC. (1.11%)
DURABLE SPECIALTIES, INC.(2.31%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.86%)
THELIN RECYCLING CO., LLC(0.23%)
TRAC-WORK, INC.(1.46%)
CROSSROADS, L.P. (0.26%)
MCALLISTER"S LANDSCAPE MANAGEMENT(0.67%)
RIVER CITIES SAWING, LLC (0.29%)
RAIL LABOR PROVIDERS (0.05%)
STRAIGHT LINE SAWING & SEALING (0.19%)
EL CALA CONSTRUCTION LLC (2.11%)
S1 SOD (0.32%)
WEBBER BARRIER SERVICES, LLC.(0.57%)
ARLINGTON PAVERS, INC. (0.04%)
SUNNYVALE FENCE COMPANY(0.75%)
AQUA BORE(0.01%)
Contract # 03113211
Totals 15319836.00 0.00 15756980.90 99.9

CountyKAUFMAN
Highway SH 34
From US 80
To N. FRANCES STREET IN TERRELL
CSJ 0173-05-032
Proj ID STP 2013(665)
Work Type HOT MIX OVLY, BASE, BLADE, PAV MARKS
 
0.977 1979270.82 94174.20 1078429.73 54.4
Work Order 08-19-13
Work Began 01-06-14
Work Completed  
Time Computed 12-17-13
Contract Working Days 152
Addl Days Granted 5
Working Days Charged 116
Percent Time Used 73
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0173-05-032
MELS ELECTRIC, L.P.(1.30%)
INLET STRUCTURE SPECIALTIES LTD. (0.70%)
BUYERS BARRICADES, INC.(1.16%)
CHRISTINE"S CONCERTE SAWING & SEALING LLC(0.11%)
DUSTROL, INC.(4.17%)
PEACHTREE CONSTRUCTION, LTD. ( 38.86%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (2.46%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.97%)
BRENDA PRICE TRUCKING(1.45%)
Contract # 05133023
Totals 1979270.82 94174.20 1078429.73 54.4

CountyDALLAS
Highway IH 35E
From AT DNT
To .
CSJ 0196-03-264
Proj ID CC 196-3-264
Work Type INSTALLATION OF SIGNS
 
0.003 166732.59 0.00 0.00 0.0
Work Order 09-11-13
Work Began 00-00-00
Work Completed  
Time Computed 11-10-13
Contract Working Days 33
Addl Days Granted 0
Working Days Charged 23
Percent Time Used 69
Contractor(s)
SIEMENS INDUSTRY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0196-03-264
ALTUS TRAFFIC MANAGEMENT LLC ( 25.06%)
SYNERGY SIGNS & SERVICES ( 36.66%)
Contract # 08133218
Totals 166732.59 0.00 0.00 0.0

CountyDALLAS
Highway IH 35E
From EMPIRE CENTRAL
To SL 12
CSJ 0196-03-267
Proj ID NH 2014(654)
Work Type INSTALLATION OF ITS SYSTEM
 
2.832 364833.69 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-10-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
FLORIDA TRAFFIC CONTROL DEVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0196-03-267
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05143231
Totals 364833.69 0.00 0.00 0.0

CountyDALLAS
Highway SL 354
From MANANA DRIVE
To NORTH OF ROYAL LANE
CSJ 0196-06-028
Proj ID STP 2014(655)MM
Work Type PEDESTRIAN STRUCTURES AND SIDEWALKS
 
1.704 4677810.85 0.00 0.00 0.0
CountyDALLAS
Highway SL 354
From MANANA DRIVE
To NORTH OF ROYAL LANE
CSJ 0196-06-029
Proj ID RW 196-6-29
Work Type ACQUISITION AND UTILITIES
 
1.614 172634.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 220
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
THE FAIN GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0196-06-028
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07143042
Totals 4850444.85 0.00 0.00 0.0

CountyDALLAS
Highway US 175
From LAKE JUNE ROAD
To IH 20
CSJ 0197-02-106
Proj ID NH 2013(317)
Work Type FDR, ACP OVERLAY AND PVMNT MARKING
 
5.198 2490572.71 60798.60 2368750.59 95.1
Work Order 02-26-13
Work Began 04-30-13
Work Completed  
Time Computed 04-27-13
Contract Working Days 166
Addl Days Granted 28
Working Days Charged 193
Percent Time Used 99
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0197-02-106
STRAIGHT LINE SAWING & SEALING (2.27%)
BRENDA PRICE TRUCKING(3.21%)
HIGHWAY TECHNOLOGIES, INC. (0.58%)
DUSTROL, INC.(5.81%)
APAC-TEXAS, INC. ( 28.53%)
DURABLE SPECIALTIES, INC.(0.39%)
ENVIRONMENTAL STANDARDS, INC.(0.20%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.89%)
Contract # 01133215
Totals 2490572.71 60798.60 2368750.59 95.1

CountyDALLAS
Highway US 175
From AT IH 20
To .
CSJ 0197-02-110
Proj ID NH 2014(391)
Work Type REPAIR CONNECTOR RAMP
 
0.717 380242.11 251922.07 436373.95 99.9
Work Order 03-07-14
Work Began 04-28-14
Work Completed  
Time Computed 04-28-14
Contract Working Days 66
Addl Days Granted 0
Working Days Charged 42
Percent Time Used 63
Contractor(s)
GIBSON & ASSOCIATES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0197-02-110
NELSON INDUSTRIAL SERVICES, INC. (2.96%)
TOTAL HIGHWAY MAINTENANCE, LLC (3.09%)
Contract # 02143009
Totals 380242.11 251922.07 436373.95 99.9

CountyDALLAS
Highway US 175
From AT ST. AUGUSTINE RD.
To .
CSJ 0197-02-111
Proj ID NH 2014(351)
Work Type REPAIR DAMAGED 33" STORM DRAIN RCP
 
0.181 207035.00 58083.15 197463.85 95.9
Work Order 02-25-14
Work Began 04-28-14
Work Completed  
Time Computed 04-26-14
Contract Working Days 15
Addl Days Granted 0
Working Days Charged 17
Percent Time Used 113
Contractor(s)
NORTH TEXAS CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0197-02-111
STRIPING TECHNOLOGY, L.P.(1.31%)
FORTSON CONTRACTING, INC.(6.00%)
COWBELL TRAFFIC SERVICES, INC. (1.93%)
BUYERS BARRICADES, INC.(1.99%)
IOWA BRIDGE & CULVERT, LC( 12.57%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (4.60%)
Contract # 01143006
Totals 207035.00 58083.15 197463.85 95.9

CountyDALLAS
Highway US 175
From IH 20
To KAUFMAN COUNTY LINE
CSJ 0197-02-112
Proj ID NH 2014(762)
Work Type MILL, FDR AND ACP OVERLAY
 
7.165 2707488.60 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 154
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0197-02-112
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06143034
Totals 2707488.60 0.00 0.00 0.0

CountyDALLAS
Highway US 175
From 0.5 MI WEST OF SIMONDS
To 1800' EAST OF MALLOY BRIDGE RD
CSJ 0197-02-114
Proj ID STP 2014(696)HESG
Work Type INSTALL SAFETY LIGHTING
 
2.320 446622.51 0.00 0.00 0.0
CountyKAUFMAN
Highway US 175
From 0.5 MI WEST OF FM 1389
To 0.5 MI EAST OF FM 1389
CSJ 0197-03-068
Proj ID NH 2014(796)
Work Type INSTALL SAFETY LIGHTING
 
1.000 171097.15 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-05-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SOUTH TEXAS ILLUMINATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0197-02-114
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04143231
Totals 617719.66 0.00 0.00 0.0

CountyELLIS
Highway US 67
From AT RAILPORT PARKWAY
To .
CSJ 0260-02-038
Proj ID PTF 2011(809)
Work Type GRADING, BASE, ACP PVMNT, STRUCTURES
 
1.459 8811943.85 581.89 8826481.21 99.9
Work Order 04-05-11
Work Began 04-22-11
Work Completed  
Time Computed 04-22-11
Contract Working Days 303
Addl Days Granted 243
Working Days Charged 652
Percent Time Used 119
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0260-02-038
STRIPING TECHNOLOGY, L.P.(0.69%)
RAMBO CONTRACTING, INC.(2.21%)
RICE ENVIRONMENTAL SERVICES(0.94%)
HIGHWAY TECHNOLOGIES, INC. (0.21%)
BUILDER SERVICES CO. (0.59%)
FORTSON CONTRACTING, INC.(0.71%)
MELS ELECTRIC, L.P.(0.45%)
J. T. LANSFORD & SONS, INC.(0.34%)
BAKER BRIDGE, L.P. ( 16.29%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (1.30%)
GARY A. CRAIN, INC.(0.23%)
ENVIRONMENTAL STANDARDS, INC.(0.14%)
SAN-ANN-CO., INC.(0.24%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.12%)
PENHALL COMPANY(0.06%)
TEX OP CONSTRUCTION, LP(0.10%)
DUSTROL, INC.(0.20%)
REBCON, INC. ( 10.24%)
N.L. SCHUTTE FOUNDATION DRILLING, INC. (0.24%)
A R DANIEL CONSTRUCTION SERVICES, INC. (0.39%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (2.11%)
WEST TEXAS REBAR PLACERS INC.(0.25%)
WEBBER BARRIER SERVICES, LLC.(0.58%)
RG PAINTING(0.18%)
HOUSTON SAWING & DRILLING(0.04%)
TED ALVAREZ TRUCKING (0.34%)
GIBSON & ASSOCIATES, INC.(0.05%)
CHRISTINE"S CONCERTE SAWING & SEALING LLC(0.02%)
Contract # 02113005
Totals 8811943.85 581.89 8826481.21 99.9

page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8