Monthly State Let Construction Report For Dallas District As Of Aug 10, 2015 Page 3 Of 11

Last Update: Monday, August 10, 2015
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10 | page 11

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyDALLAS
Highway IH 345
From SOUTH OF IH 30, NB AND SB
To US 75 IN CITY OF DALLAS
CSJ 0092-14-083
Proj ID NH 1402(023)
Work Type REPAIR BENT CAPS AND GIRDERS
 
2.434 666025.00 0.00 767442.28 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-22-14
Work Began 12-08-14
Work Completed 07-10-15
Time Computed 10-08-14
Contract Working Days 126
Addl Days Granted 0
Working Days Charged 93
Percent Time Used 73
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0092-14-083
TOTAL HIGHWAY MAINTENANCE, LLC (3.23%)
BROCK ENVIRONMENTAL, LLC (0.06%)
Contract # 08143023
Totals 666025.00 0.00 767442.28 100.0

CountyNAVARRO
Highway IH 45
From SOUTH OF SH 14
To 2.1 MILES SOUTH OF BI 45F
CSJ 0093-01-098
Proj ID NH 1502(486)
Work Type GR; STR; PVMT; PVMT MKGS
 
28.820 71994840.25 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 776
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0093-01-098
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07153001
Totals 71994840.25 0.00 0.00 0.0

CountyNAVARRO
Highway SH 14
From AT UP RR
To SOUTH OF RICHLAND
CSJ 0093-02-015
Proj ID C 93-2-15
Work Type REPLACE EXISTING RAILROAD UNDERPASS
 
0.862 6571060.16 0.00 4828906.58 73.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-13-13
Work Began 12-02-13
Work Completed  
Time Computed 12-02-13
Contract Working Days 378
Addl Days Granted 0
Working Days Charged 395
Percent Time Used 104
Contractor(s)
CDM HOLDINGS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0093-02-015
SAN-ANN-CO., INC.(0.19%)
W.O.E. CONSTRUCTION(0.03%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (2.06%)
STRIPING TECHNOLOGY, L.P.(0.82%)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.20%)
FORTSON CONTRACTING, INC.(0.66%)
NE-TEX CONSTRUCTION, LTD.( 44.04%)
APAC-TEXAS, INC. (7.62%)
TEX OP CONSTRUCTION, LP(0.93%)
MESA ROD BUSTERS, INC. (0.17%)
Contract # 08133246
Totals 6571060.16 0.00 4828906.58 73.7

CountyDALLAS
Highway US 80
From CULVERT 0.3 MI E OF E FORK RD
To .
CSJ 0095-02-109
Proj ID NH 2013(381)
Work Type REPAIR SLOPE WITH HEADWALL
 
0.024 256468.00 0.00 208791.72 100.0
Work Order 04-10-13
Work Began 06-13-13
Work Completed 07-30-15
Time Computed 06-09-13
Contract Working Days 50
Addl Days Granted 15
Working Days Charged 210
Percent Time Used 323
Contractor(s)
WEST GENERAL CONTRACTORS CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0095-02-109
DALLAS LITE AND BARRICADE INC. (8.04%)
IOWA BRIDGE & CULVERT, LC( 11.40%)
CONSTRUCTION COMPANIES GROUP, LLC( 38.57%)
FARR FOUNDATION, INC.( 11.96%)
STRAIGHT LINE PAVEMENT MARKINGS(3.76%)
Contract # 02133218
Totals 256468.00 0.00 208791.72 100.0

CountyDALLAS
Highway US 80 ETC
From TOWN EAST
To IH 635
CSJ 0095-02-113
Proj ID CM 1402(024)
Work Type INSTALLATION OF WIRELESS ITS SYSTEM
 
25.893 1949706.73 0.00 1143288.23 58.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-04-14
Work Began 05-01-15
Work Completed  
Time Computed 03-04-15
Contract Working Days 160
Addl Days Granted 0
Working Days Charged 43
Percent Time Used 26
Contractor(s)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0095-02-113
ODUM SERVICES, L.P.(6.10%)
PEAK COMMUNICATIONS LLC(1.32%)
BIG DOG DRILLING, LLC(0.71%)
DOUBLE S CONSTRUCTION(1.71%)
ALTUS TRAFFIC MANAGEMENT LLC (0.62%)
Contract # 08143211
Totals 1949706.73 0.00 1143288.23 58.6

CountyDALLAS
Highway US 80
From EAST OF TOWN EAST BLVD
To KAUFMAN COUNTY LINE
CSJ 0095-02-114
Proj ID STP 2015(840)HES
Work Type INSTALL PROTECTION
 
23.645 936969.50 240972.00 316509.50 33.7
Work Order 05-19-15
Work Began 06-22-15
Work Completed  
Time Computed 06-19-15
Contract Working Days 127
Addl Days Granted 0
Working Days Charged 25
Percent Time Used 19
Contractor(s)
ODUM SERVICES, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0095-02-114
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04153033
Totals 936969.50 240972.00 316509.50 33.7

CountyKAUFMAN
Highway US 80
From 0.4 MI WEST OF FM 460
To EAST OF FM 548
CSJ 0095-03-088
Proj ID NH 2014(870)
Work Type BS, CMT TR, FLX BS, STR, HMAC, WDN, MRKS
 
8.162 9634025.22 742936.80 5061473.46 52.5
Work Order 09-30-14
Work Began 01-14-15
Work Completed  
Time Computed 11-29-14
Contract Working Days 281
Addl Days Granted 0
Working Days Charged 148
Percent Time Used 52
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0095-03-088
VIKING CONSTRUCTION, INC.(0.55%)
SAMMY G. SMALLWOOD (0.83%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.16%)
STRIPING TECHNOLOGY, L.P.(0.76%)
O. TREVINO CONSTRUCTION, LLC (0.86%)
CROSSROADS, L.P. (0.00%)
FORTSON CONTRACTING, INC.(1.86%)
CLLA GROUP, LLC(1.84%)
HIGHWAY 19 CONSTRUCTION, LLC (4.20%)
DUSTROL, INC.(4.75%)
W.O.E. CONSTRUCTION(0.01%)
Contract # 07143007
Totals 9634025.22 742936.80 5061473.46 52.5

CountyKAUFMAN
Highway US 80
From AT PROPOSED FORNEY PARKWAY
To .
CSJ 0095-04-064
Proj ID C 95-4-64
Work Type GR, STR, DRAINAGE, PVMT, SIGNS
 
1.030 17050215.03 0.00 19675678.73 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-06-12
Work Began 04-09-12
Work Completed 05-20-15
Time Computed 03-22-12
Contract Working Days 473
Addl Days Granted 82
Working Days Charged 555
Percent Time Used 100
Contractor(s)
HAYDON BUILDING CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0095-04-064
BEAIRD DRILLING(2.99%)
BUYERS BARRICADES, INC.(0.19%)
DUSTROL, INC.(0.14%)
FORTSON CONTRACTING, INC.(0.57%)
PEACHTREE CONSTRUCTION, LTD. (3.69%)
STAR OPERATIONS, INC.(1.93%)
STORM WATER MANAGEMENT, INC. (0.08%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.32%)
SOUTH TEXAS PAINTING COMPANY (1.00%)
CONCRETE CUTTING BY BOND (0.07%)
USA SWPPP INSPECTIONS, INC.(0.66%)
W. W. FOUNDATION DRILLING, LTD.(2.82%)
J.L. STEEL REINFORCING, LLC(1.20%)
COWBOY TRUCKING(0.00%)
CHRISTINE"S CONCERTE SAWING & SEALING LLC(0.06%)
SUNNYVALE FENCE COMPANY(0.10%)
Contract # 01123202
Totals 17050215.03 0.00 19675678.73 100.0

CountyDALLAS
Highway US 80
From IH 30
To TOWN EAST BLVD
CSJ 0095-10-053
Proj ID NH 2015(391)
Work Type CONCRETE FULL DEPTH REPAIR
 
2.686 1322287.50 0.00 0.00 0.0
Work Order 02-24-15
Work Began 07-24-15
Work Completed  
Time Computed 04-25-15
Contract Working Days 105
Addl Days Granted 0
Working Days Charged 15
Percent Time Used 14
Contractor(s)
SILVER CREEK CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0095-10-053
PEACHTREE CONSTRUCTION, LTD. (6.83%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.52%)
COWBOY TRUCKING(1.18%)
TEXOP CONSTRUCTION (0.79%)
Contract # 12143210
Totals 1322287.50 0.00 0.00 0.0

CountyKAUFMAN
Highway FM 688
From US 80
To FM 548
CSJ 0095-11-008
Proj ID STP 2015(842)
Work Type SPT BS REP, MILL, LVLUP, OV PAV MRKS
 
2.313 832284.88 514189.11 514189.11 61.7
Work Order 05-21-15
Work Began 06-28-15
Work Completed  
Time Computed 06-21-15
Contract Working Days 61
Addl Days Granted 0
Working Days Charged 24
Percent Time Used 39
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0095-11-008
ALTUS TRAFFIC MANAGEMENT LLC (0.49%)
TOTAL HIGHWAY MAINTENANCE, LLC (3.94%)
USA SWPPP INSPECTIONS, INC.(2.01%)
Contract # 04153223
Totals 832284.88 514189.11 514189.11 61.7

CountyDALLAS
Highway IH 20
From I.H. 635
To SEAGOVILLE ROAD.
CSJ 0095-13-025
Proj ID IM 0205(146)
Work Type GRADING, PAVING, SIGNING, LANDSCAPING
 
0.841 4972861.19 0.00 4955546.91 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-21-12
Work Began 10-01-12
Work Completed 02-10-15
Time Computed 10-01-12
Contract Working Days 147
Addl Days Granted 70
Working Days Charged 217
Percent Time Used 100
Contractor(s)
HAYDON BUILDING CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0095-13-025
NORTH TEXAS REBAR, LLC (0.68%)
FORTSON CONTRACTING, INC.(1.00%)
INTEGRATED ROADWAY SERVICES, INC.(1.49%)
S & S PAINTING (0.25%)
W.O.E. CONSTRUCTION(0.21%)
AXIS CONTRACTING, INC. (8.00%)
HOUSTON SAWING & DRILLING(0.05%)
USA SWPPP INSPECTIONS, INC.(0.47%)
DUSTROL, INC.(0.54%)
DALLAS LITE AND BARRICADE INC. (0.28%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.23%)
THELIN RECYCLING COMPANY, L.P. (0.24%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(9.28%)
W. W. FOUNDATION DRILLING, LTD.(2.12%)
THE ANCHOR GROUP, INC. (0.78%)
NORTH TEXAS REBAR, LLC (0.09%)
COWBOY TRUCKING(0.40%)
MCALLISTER"S LANDSCAPE MANAGEMENT(3.25%)
S & S BRIDGE PAINTING, INC.(0.25%)
STAR OPERATIONS, INC.(0.24%)
Contract # 05123247
Totals 4972861.19 0.00 4955546.91 100.0

CountyKAUFMAN
Highway IH 20 ETC
From FM 2932
To SP 557
CSJ 0095-14-023
Proj ID NH 2015(170)
Work Type SEAL COAT, PVMT MKGS
 
210.557 10697868.93 5035169.32 8512821.93 79.5
Work Order 10-14-14
Work Began 06-23-15
Work Completed  
Time Computed 12-13-14
Contract Working Days 153
Addl Days Granted 1
Working Days Charged 112
Percent Time Used 72
Contractor(s)
BRANNAN PAVING CO., LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0095-14-023
STRIPE-A-ZONE, INC.( 11.94%)
Contract # 09143011
Totals 10697868.93 5035169.32 8512821.93 79.5

CountyNAVARRO
Highway US 287
From FM 637 NORTH, EAST OF FM 739
To CR 2040 IN MILDRED
CSJ 0122-01-039
Proj ID STP 1502(090)
Work Type WIDEN ROADWAY; PVMT MKGS
 
2.871 3949887.50 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 07-22-15
Work Began 00-00-00
Work Completed  
Time Computed 08-22-15
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0122-01-039
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05153039
Totals 3949887.50 0.00 0.00 0.0

CountyDENTON
Highway US 380
From DENTON/WISE COUNTY LINE ROAD
To WEST OF FM 156
CSJ 0134-09-029
Proj ID STP 2012(184)SB
Work Type GR, STR, DRAINAGE, BASE, PVMT, AND
 
7.860 26379472.05 0.00 26490901.07 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 02-22-12
Work Began 05-14-12
Work Completed  
Time Computed 05-14-12
Contract Working Days 588
Addl Days Granted 6
Working Days Charged 593
Percent Time Used 99
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0134-09-029
GLENN THURMAN, INC.( 14.17%)
HIGHWAY TECHNOLOGIES, INC. (1.04%)
BROCK ENVIRONMENTAL, LLC (0.65%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.42%)
CEN CONCRETE CONSTRUCTION COMPANY, INC.(2.02%)
DUSTROL, INC.(0.64%)
FORTSON CONTRACTING, INC.(0.87%)
MIKE ALBERT, INC.(2.69%)
MURRAY CONSTRUCTION(0.35%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.85%)
IOWA BRIDGE & CULVERT, LC(0.33%)
TEXAS SHAFTS, INC. (0.15%)
MCL CONTRACTING, LLC (0.01%)
LKT & ASSOCIATES (2.33%)
BUYERS BARRICADES, INC.(0.09%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.79%)
CLARK CONSTRUCTION OF TEXAS, INC.(0.76%)
DURABLE SPECIALTIES, INC.(0.03%)
Contract # 12113201
Totals 26379472.05 0.00 26490901.07 99.9

CountyDENTON
Highway US 380
From WEST OF BONNIE BRAE ST
To US 377
CSJ 0134-09-034
Proj ID STP 2013(181)
Work Type STRUCTURES, BASE, PAVEMENT
 
1.625 15088445.93 539457.29 4923308.97 32.6
Work Order 04-03-13
Work Began 11-07-14
Work Completed  
Time Computed 12-29-13
Contract Working Days 420
Addl Days Granted 0
Working Days Charged 174
Percent Time Used 41
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0134-09-034
BUYERS BARRICADES, INC.(0.27%)
FORTSON CONTRACTING, INC.(0.10%)
IOWA BRIDGE & CULVERT, LC(0.23%)
MIKE ALBERT, INC.( 12.30%)
ROADWAY SOLUTIONS, INC.(6.58%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.09%)
TRANSPORT TRUST(0.43%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.56%)
TEX OP CONSTRUCTION, LP(0.30%)
CEN CONCRETE CONSTRUCTION COMPANY, INC.(4.33%)
LINDAMOOD DEMOLITION, INC. (0.41%)
TOMAS REYES TRUCKING, INC. (0.37%)
W.O.E. CONSTRUCTION(0.33%)
BREDA COMPANY, INC.(0.61%)
Contract # 11123002
Totals 15088445.93 539457.29 4923308.97 32.6

CountyDENTON
Highway US 380
From WEST OF FM 156
To IH 35
CSJ 0134-09-063
Proj ID NH 2012(635)
Work Type GR, STR, DRAINAGE, PVMT, C & G, SIGNS
 
4.702 39346679.90 1217301.25 27312318.30 69.4
Work Order 03-12-13
Work Began 05-28-13
Work Completed  
Time Computed 05-28-13
Contract Working Days 755
Addl Days Granted 70
Working Days Charged 551
Percent Time Used 66
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0134-09-063
BROCK ENVIRONMENTAL, LLC (0.23%)
BUYERS BARRICADES, INC.(0.19%)
FORTSON CONTRACTING, INC.(0.67%)
THELIN RECYCLING COMPANY, L.P. (0.29%)
CRAIG OLDEN, INC.(0.26%)
JAGOE-PUBLIC COMPANY ( 13.71%)
NORTH TEXAS BOMANITE, INC. (0.70%)
TEXAS INLETS, INC. (2.35%)
TEX OP CONSTRUCTION, LP(0.64%)
TRAC-WORK, INC.(1.82%)
WYLIE DRILLING & DRAINAGE, INC.(1.19%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (2.08%)
CHOCTAW ERECTORS, INC. (0.76%)
INDEPENDENT UTILITY CONSTRUCTION INCORPORATED(1.04%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.94%)
INLET STRUCTURE SPECIALTIES LTD. (0.96%)
MCL CONTRACTING, LLC (1.02%)
W.O.E. CONSTRUCTION(4.07%)
ALLIED DRILLING COMPANY(0.01%)
TX DOWN UNDER CONSTRUCTION LLC (0.04%)
SAR TRANSPORTATION, LLC(1.04%)
GRANADOS (0.73%)
DCCS, LLC(0.23%)
SCOTT DERR PAINTING CO, LLC(0.06%)
SOUTHEAST GRINDING & GROOVING, LLC (0.00%)
GLOBAL FENCE AND GATE, LLC (0.04%)
MOBILE ENTERPRISES, INC. (0.08%)
A-CORE CONCRETE CUTTING, INC.(0.02%)
Contract # 07123002
Totals 39346679.90 1217301.25 27312318.30 69.4

CountyCOLLIN
Highway US 380
From CR 73 (LOVERS LANE)
To COIT RD (CR 72/CR 74)
CSJ 0135-02-044
Proj ID C 135-2-44
Work Type GR, DR, STR, PAV, SIGN, PAV MRKS, CON PAV
 
3.440 17277016.95 904500.27 6663480.51 38.5
Work Order 08-07-14
Work Began 09-08-14
Work Completed  
Time Computed 08-23-14
Contract Working Days 380
Addl Days Granted 0
Working Days Charged 238
Percent Time Used 62
Contractor(s)
MARIO SINACOLA & SONS EXCAVATING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0135-02-044
IRON CONCRETE CONSTRUCTION COMPANY, INC. (2.87%)
MIKE ALBERT, INC.(2.96%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.14%)
FORTSON CONTRACTING, INC.(0.40%)
FNH CONSTRUCTION, LLC(1.79%)
TEXOP CONSTRUCTION (0.56%)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.(2.15%)
JAGOE-PUBLIC COMPANY ( 31.18%)
W.O.E. CONSTRUCTION(1.66%)
Contract # 06143001
Totals 17277016.95 904500.27 6663480.51 38.5

CountyCOLLIN
Highway US 380 ETC
From LAKE FOREST DRIVE
To SH 5
CSJ 0135-02-054
Proj ID NH 2014(392)
Work Type FULL DEPTH REPAIR
 
44.157 917408.10 0.00 974048.78 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-25-14
Work Began 05-19-14
Work Completed 11-20-14
Time Computed 05-11-14
Contract Working Days 104
Addl Days Granted 2
Working Days Charged 106
Percent Time Used 100
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0135-02-054
W.O.E. CONSTRUCTION(3.73%)
BRENDA PRICE TRUCKING(3.77%)
ALTUS TRAFFIC MANAGEMENT LLC (0.49%)
BTA SERVICES, LTD. (0.86%)
Contract # 02143206
Totals 917408.10 0.00 974048.78 100.0

CountyCOLLIN
Highway US 380
From WEST OF CR 608 IN FARMERSVILLE
To EAST OF FLOYD RD
CSJ 0135-05-025
Proj ID C 135-5-25
Work Type GR, STRS, PVT, CUL, CURB AND GTRS
 
1.307 18186687.16 553483.06 18100426.43 99.9
Work Order 05-10-12
Work Began 11-05-12
Work Completed  
Time Computed 11-05-12
Contract Working Days 551
Addl Days Granted 156
Working Days Charged 797
Percent Time Used 112
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0135-05-025
BREDA COMPANY, INC.(0.68%)
CONCRETE CUTTING BY BOND (0.21%)
CRAIG OLDEN, INC.(1.58%)
DUSTROL, INC.(0.63%)
FORTSON CONTRACTING, INC.(0.28%)
JUST GROOVING, LTD.(0.01%)
K & S UTILITY CONTRACTORS, INC.(4.42%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(6.11%)
SCOTT DERR PAINTING CO, LLC(0.01%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.11%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.04%)
WYLIE DRILLING & DRAINAGE, INC.(7.43%)
MCL CONTRACTING, LLC (0.77%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.18%)
BRENDA PRICE TRUCKING(0.02%)
SOUTHEAST GRINDING & GROOVING, LLC (0.01%)
GIBSON & ASSOCIATES, INC.(0.24%)
Contract # 07113204
Totals 18186687.16 553483.06 18100426.43 99.9

CountyDENTON
Highway US 377
From AT FISH TRAP / MOSELEY RD
To .
CSJ 0135-10-053
Proj ID NH 2015(065)G
Work Type TRAFFIC SIGNAL INSTALLATION
 
0.001 256066.00 0.00 263155.53 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-28-14
Work Began 02-04-15
Work Completed 06-04-15
Time Computed 02-04-15
Contract Working Days 40
Addl Days Granted 0
Working Days Charged 40
Percent Time Used 100
Contractor(s)
FNH CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0135-10-053
STRIPING TECHNOLOGY, L.P.(6.81%)
Contract # 09143021
Totals 256066.00 0.00 263155.53 100.0