AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - EL PASO DISTRICT

Last Update: Tuesday, September 30, 2014
ITEMS 500 2001 TO 560 2018
Items Items Bid Code Range
0100 - 0193
0204 - 0247
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0740 - 0788
1003 - 1122
2153 - 2314
3268 - 3271
4191 - 4671
5522 - 5957
6006 - 6834
8020 - 8985
9059 - 9059
500 2001 - 560 2018
Item No Description Units Sept 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 3.000 287,706.66667 22.000 415,917.95500 22
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 31.000 10,225.80645 153.000 10,869.29026 22
502 2135 FURNISH TWO TRUCK MOUNTED ATTENUATORS DAY     100.000 155.00000 1
508 2002 CONSTRUCTING DETOURS SY 3,892.000 35.00000 20,156.000 29.27530 3
512 2004 PORT CTB (FUR & INST) (SNGL SLP) (TY 1) LF     1,165.000 6.00000 1
512 2008 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF 220.000 50.00000 812.000 21.34975 3
512 2009 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF 20.000 50.00000 140.000 16.26286 3
512 2010 PORT CTB (DES SOURCE) (SAFETY SH) (TY 1) LF     5,130.000 8.33333 2
512 2011 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) LF 4,070.000 7.00000 68,230.000 6.40723 5
512 2017 PORT CTB (DES SOURCE) (LOW PROF) (TY 1) LF 2,400.000 6.00000 3,406.000 6.00000 2
512 2018 PORT CTB (DES SOURCE) (LOW PROF) (TY 2) LF 40.000 6.00000 120.000 10.00000 2
512 2019 PORT CTB (MOVE) (SAFETY SH) (TY 1) LF     1,560.000 10.00000 1
512 2020 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     86,507.000 4.75193 3
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF     1,410.000 4.00000 1
512 2026 PORT CTB (MOVE) (LOW PROF) (TY 1) LF     404.000 14.51980 2
512 2027 PORT CTB (MOVE) (LOW PROF) (TY 2) LF     120.000 13.04333 2
512 2028 PORT CTB (STKPL) (SAFETY SH) (TY 1) LF     5,130.000 6.61404 2
512 2029 PORT CTB (STKPL) (SAFETY SH) (TY 2) LF 4,070.000 6.00000 68,530.000 5.34160 5
512 2035 PORT CTB (STKPL) (LOW PROF) (TY 1) LF 2,400.000 6.00000 3,406.000 6.00000 2
512 2036 PORT CTB (STKPL) (LOW PROF) (TY 2) LF 40.000 6.00000 120.000 10.00000 2
512 2040 PORT CTB (REMOVE) (SNGL SLP) (TY 1) LF     1,165.000 6.00000 1
512 2044 PORT CTB (REMOVE) (LOW PROF) (TY 1) LF     592.000 10.70270 2
512 2045 PORT CTB (REMOVE) (LOW PROF) (TY 2) LF     120.000 10.64000 2
512 2049 PORT CTB (DES SOURCE) (F - SHAPE) (TY 1) LF 16,687.000 10.00000 31,022.000 7.68954 2
512 2050 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF 6,970.000 7.00000 9,894.000 6.11340 2
512 2051 PORT CTB (STOCKPILE) (F - SHAPE) (TY 1) LF 16,717.000 7.00000 31,052.000 5.61507 2
514 2004 PERM CONC TRF BARR (SGL SLP) (TY 1) (42" LF     3,121.000 70.00000 1
514 2006 PERM CONC TRF BARR (SGL SLP) (TY 3) (42" LF     745.000 145.00000 1
514 2022 PERM CONC TRF BARR (SGL SLP) (TY 4) (42" LF     40.000 300.00000 1
514 2039 PERM CONC TRF BARR (F - SHAPE) (SPL) LF     17,094.500 60.00000 1
528 2001 COLORED TEXTURED CONC (4") SY 835.000 49.05000 8,028.000 46.11693 3
529 2001 CONC CURB (TY I) LF     872.000 16.00000 1
529 2002 CONC CURB (TY II) LF 6,156.000 10.65775 7,010.000 13.60914 4
529 2004 CONC CURB & GUTTER (TY II) LF 31,759.000 10.14101 61,653.000 11.09803 4
529 2006 CONC CURB (MONO) (TY II) LF     13,052.000 9.01632 5
529 2014 CONC CURB (TY C) LF     4,095.000 12.00000 1
530 2008 DRIVEWAYS (ACP) EA     1.000 3,500.00000 1
530 2010 DRIVEWAYS (CONC) SY 444.000 43.60000 1,563.500 59.01845 4
530 2011 DRIVEWAYS (ACP) SY     66.000 60.00000 1
531 2004 CONC SIDEWALKS (6") SY     142.000 95.00000 1
531 2005 CURB RAMPS (TY 1) EA 116.000 715.32328 128.000 738.88672 5
531 2006 CURB RAMPS (TY 2) EA 13.000 763.00000 13.000 763.00000 1
531 2007 CURB RAMPS (TY 3) EA 191.000 708.50000 191.000 708.50000 1
531 2009 CURB RAMPS (TY 6) EA 77.000 708.50000 77.000 708.50000 1
531 2010 CURB RAMPS (TY 7) EA 125.000 708.50000 156.000 799.75962 6
531 2013 CURB RAMPS (TY 20) EA 5.000 872.00000 5.000 872.00000 1
531 2014 CURB RAMPS (TY 22) EA 8.000 1,308.00000 12.000 1,672.00000 2
531 2015 CONC SIDEWALKS (4") SY 11,083.000 29.44039 11,083.000 29.44039 2
531 2017 CURB RAMPS (TY 21) EA 35.000 1,090.00000 37.000 1,104.05405 2
531 2024 CONC SIDEWALK (5") SY     28.700 392.26969 1
531 2035 CONCRETE SIDEWALKS (5') (4") LF     616.000 22.00000 1
531 2040 CURB RAMPS (TY 5) EA     3.000 1,933.33333 2
531 2041 CURB RAMPS (TY 10) EA 8.000 708.50000 8.000 708.50000 1
531 2054 CURB RAMPS SY     48.800 684.95000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     299,380.000 .13527 2
536 2004 CONC DIRECTIONAL ISLAND SY     671.000 42.00000 1
536 2006 CONC MEDIAN (MONO NOSE) SY     24.000 90.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 1,869.000 20.26766 11,870.000 19.19775 7
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     45,392.000 18.81146 4
540 2005 TERMINAL ANCHOR SECTION EA     3.000 916.66667 2
540 2007 MTL W - BEAM GD FEN ADJUSTMENT LF     21,526.500 2.02265 2
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     212.000 1,452.73585 6
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     75.000 50.00000 1
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF     35.000 50.00000 1
540 2032 MTL BM GD FN TRANSITION (REMOVE & RESET) EA     1.000 750.00000 1
540 2034 MTL W - BEAM GD FEN (SPECIAL) LF     326.000 38.84969 2
540 2035 MTL W - BEAM GD FEN (SALVAGE & REUSE) LF 675.000 22.00000 675.000 22.00000 1
540 2036 DRIVEWAY TERMINAL ANCHOR SECTION EA     2.000 750.00000 1
540 2037 MTL W - BEAM GD FEN (CRT POST) (SHRT RAD LF     150.000 31.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA 7.000 1,300.00000 214.000 994.74299 9
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF     275.000 26.00000 1
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     26.000 800.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF 1,586.000 3.01839 56,459.000 2.78859 11
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     159.000 175.84906 8
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     38.000 346.84211 3
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 7.000 2,300.00000 208.000 1,902.78846 8
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA 1.000 2,000.00000 12.000 1,145.83333 3
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     159.000 447.35849 6
544 2006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     5.000 2,700.00000 1
544 2017 GUARDRAIL END TREATMENT (INSTALL) (OPT1) EA     2.000 1,950.00000 1
544 2019 GUARDRAIL END TREATMENT (INSTALL) (OPT2) EA     2.000 2,100.00000 1
545 2001 CRASH CUSH ATTEN (INSTL) EA     20.000 11,740.00000 4
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     36.000 1,200.00000 2
545 2003 CRASH CUSH ATTEN (REMOVE) EA     14.000 678.57143 4
545 2022 CRASH CUSH ATTEN (INSTL) (REACT) (N) EA     6.000 21,000.00000 1
545 2023 CRASH CUSH ATTEN (MOVE & RESET) (REACT) (N EA     6.000 2,700.00000 1
545 2024 CRASH CUSH ATTEN (REMOVE) (REACT) (N) EA     7.000 1,000.00000 1
545 2046 CRASH CUSH ATTEN (INSTAL) (ABSORB 350) EA     1.000 9,000.00000 1
545 2048 CRASH CUSH ATTEN (REMOVE) (ABSORB 350) EA     1.000 600.00000 1
545 2049 CRASH CUSH ATTEN (INSTL) (WORK ZONE) EA 5.000 10,000.00000 28.000 9,957.14286 5
545 2050 CRASH CUSH ATTEN (MOV & RESET) (WORK ZONE) EA 2.000 1,200.00000 37.000 1,282.16216 4
545 2051 CRASH CUSH ATTEN (REMOVE) (WORK ZONE) EA 5.000 700.00000 28.000 584.71429 5
545 2083 CRASH CUSH ATTEN (INSTL) (L) (N) (TL3) EA     1.000 20,000.00000 1
550 2001 CHAIN LINK FENCE (INSTALL) (6') LF 20.000 109.00000 20.000 109.00000 1
550 2003 CHAIN LINK FENCE (REMOVE) LF 145.000 12.44138 7,996.000 4.04865 4
560 2018 MAILBOX INSTALL - S (TWG - POST) TY 4 FND EA 2.000 327.00000 2.000 327.00000 1