AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - FORT WORTH DISTRICT

Last Update: Friday, September 28, 2018
ITEMS 192 2015 TO 193 6007
ItemsItemsBid Code Range
0100 - 0193
0216 - 0275
0305 - 0368
0400 - 0496
0500 - 0560
0610 - 0690
0720 - 0785
0800 - 0800
1002 - 1016
2000 - 2003
3002 - 3028
4001 - 4225
5000 - 5432
6000 - 6602
7012 - 7155
100 2001 - 192 2014
192 2015 - 193 6007
Item NoDescriptionUnitsSept 30, 2018Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
192 2015LANDSCAPE EDGELF  550.00018.320001
192 2016PLANT BED PREPARATIONSY  1,956.0001.000001
192 2017VEGETATION BARRIERSY  2,378.000.980001
192 2031PLANT MATERIAL (5 GAL) (SHRUB)EA  1,539.00014.803102
192 2046PLANT MATERIAL (MIN 3" CAL) (B&B)EA  75.000285.290001
192 6001PLANT MATERIAL (4" CNTR)EA  6,458.0001.000001
192 6002PLANT MATERIAL (1-GAL)EA  159.0004.000001
192 6003PLANT MATERIAL (3-GAL)EA  609.00012.000001
192 6004PLANT MATERIAL (5-GAL)EA  330.00052.061452
192 6005PLANT MATERIAL (15-GAL)EA  8.000120.000001
192 6012MULCHCY  693.00030.000001
192 6013MULCHSY  740.0002.850001
192 6014PLANT SOIL MIXCY  310.00026.322582
192 6015LANDSCAPE EDGELF  2,599.00014.067723
192 6016PLANT BED PREPARATIONSY  3,514.0008.551713
192 6017VEGETATION BARRIERSY  2,766.0005.000001
192 6024PLANT MATERIAL (30 GAL) (TREE)EA  139.000246.043173
192 6025PLANT MATERIAL (45 GAL) (TREE)EA  35.000329.428573
192 6026PLANT MATERIAL (65 GAL) (TREE)EA  23.000675.000001
192 6028PLANT MATERIAL (1 GAL) (SHRUB)EA  2,845.0004.047452
192 6030PLANT MATERIAL (3 GAL) (SHRUB)EA  200.00011.000001
192 6031PLANT MATERIAL (5 GAL) (SHRUB)EA  78.0005.000001
192 6048PLANT MATERIAL (MIN 4" CAL) (B&B)EA  11.000600.000001
192 6067LANDSCAPE EDGE (TYPE I)LF  1,111.00019.000001
192 6068LANDSCAPE EDGE (TYPE II)LF  2,696.00027.728492
192 6084PLANT MATERIAL (200 GAL) (TREE)EA  5.0002,800.000001
192 6097CONC LNDSCP EDG (12 IN WIDTH)LF  1,780.00019.000001
193 6001PLANT MAINTENANCEMO  60.0001,238.768005
193 6007IRRIGATION SYSTEM OPER AND MAINTMO  60.000665.156005