AVERAGE LOW BID UNIT PRICE - MAINTENANCE - FORT WORTH DISTRICT

Last Update: Wednesday, April 1, 2015
ITEMS 712 2005 TO 788 2002
Items Items Bid Code Range
0100 - 0169
0216 - 0276
0316 - 0354
0401 - 0499
0500 - 0560
0644 - 0678
0712 - 0788
1122 - 1122
3267 - 3278
4159 - 4159
6473 - 6834
7206 - 7206
8251 - 8972
712 2005 - 788 2002
Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     313.090 700.00000 1
730 2002 FULL - WIDTH MOWING AC     133,078.000 25.35790 11
730 2003 SPOT MOWING AC     1,400.000 22.95286 9
735 2002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     13,084.790 23.28453 2
735 2006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     9,982.120 20.57077 2
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     175.000 1.00000 2
735 2008 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) MI     197.600 27.50000 1
735 2009 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) MI     3,452.800 30.00000 1
735 2010 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) MI     1,081.600 37.50000 1
735 2011 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (4) MI     306.800 42.50000 1
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     1,802.950 63.49095 2
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     1,847.070 63.40756 2
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     696.800 48.64237 2
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     2,000.800 69.80408 2
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     457.260 38.45952 2
738 2010 CLEANING / SWEEPING (SPOT) MI     150.000 7.00000 2
738 2011 CLEANING / SWEEPING (HANDWORK) SY     87,619.040 0.03288 2
738 2225 CLEAN / SWEEP - (HANDWORK) (BULLPEN) SY     120,515.640 0.05000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     330.400 2,191.00484 7
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     112.900 2,507.82516 7
752 2022 TREE REMOVAL (4" - 12" DIA) EA     1,740.000 65.11494 6
752 2023 TREE REMOVAL (12" - 18" DIA) EA     1,530.000 94.50980 6
752 2024 TREE REMOVAL (18" - 24" DIA) EA     820.000 163.41463 6
752 2025 TREE REMOVAL (24" - 30" DIA) EA     635.000 244.91520 7
752 2026 TREE REMOVAL (30" - 36" DIA) EA     450.000 436.44444 7
752 2027 TREE REMOVAL (36" - 42" DIA) EA     150.000 504.79860 6
752 2028 TREE REMOVAL (42" - 48" DIA) EA     42.000 691.66667 8
752 2029 TREE REMOVAL (48" - 60" DIA) EA     37.000 945.94595 7
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     52,250.000 3.38756 2
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     113.000 9.34513 2
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     82.000 8.34146 2
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     4,200.000 20.00000 2
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     50.000 20.00000 1
770 2006 REALIGN POSTS EA     1,125.000 14.44444 2
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     105.000 328.57143 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     53.000 100.00000 2
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     8,100.000 6.44444 2
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     1,045.000 20.00000 2
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     350.000 10.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     320.000 25.00000 2
770 2022 REM & RESET SGT IMPACT HEAD EA     275.000 100.00000 2
770 2023 REPLACE SGT OBJECT MARKER EA     54.000 5.37037 2
770 2024 REPLACE SGT CABLE ANCHOR EA     44.000 5.68182 2
770 2025 REPLACE SGT CABLE ASSEMBLY EA     56.000 5.53571 2
770 2026 REPLACE SGT STRUT EA     27.000 5.37037 2
770 2027 REMOVE & REPLACE BLOCKOUT EA     700.000 5.00000 2
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     100.000 7.00000 1
770 2040 RAISE RAIL ELEMENT LF     500.000 5.00000 1
772 2001 POST AND CABLE FENCE (REMOVAL) LF     105.000 3.00000 1
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     672.000 5.04762 2
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     10.000 20.00000 1
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA     4.000 50.00000 1
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     300.000 1.00000 1
774 2006 REPAIR (TRACC) EA     26.000 500.00000 2
774 2008 REPAIR (WIDE TRACC) EA     2.000 500.00000 1
774 2010 REPAIR (REACT) EA     25.000 500.00000 1
774 2035 REPAIR REACT (CYLINDERS) EA     25.000 200.00000 1
780 2001 EPOXY INJECTION (TY IX) LF 118.000 100.00000 164.000 95.79268 2
784 2002 REPAIRING STL BRIDGE MEMBER (DIAPHRAGM) EA     5.000 245.00000 1
784 2009 REPAIRING STL BRIDGE MEMBER (SHOES) EA     10.000 245.00000 1
788 2002 CONCRETE BEAM REPAIR (CFRP) EA 11.000 10,200.00000 15.000 9,560.00000 2