AVERAGE LOW BID UNIT PRICE - MAINTENANCE - FORT WORTH DISTRICT

Last Update: Friday, October 3, 2014
ITEMS 712 2002 TO 788 2002
Items Items Bid Code Range
0100 - 0169
0216 - 0276
0305 - 0361
0401 - 0496
0500 - 0560
0620 - 0690
0712 - 0788
1122 - 1122
3267 - 3278
5049 - 5049
6006 - 6834
7205 - 7224
8251 - 8946
712 2002 - 788 2002
Item No Description Units Septembe 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     28.630 756.09501 2
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     2,862.100 511.45784 9
730 2002 FULL - WIDTH MOWING AC     133,078.000 25.35790 11
730 2003 SPOT MOWING AC     1,400.000 22.95286 9
735 2002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     13,084.790 23.28453 2
735 2006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     9,982.120 20.57077 2
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     175.000 1.00000 2
735 2008 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) MI     197.600 27.50000 1
735 2009 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) MI     3,452.800 30.00000 1
735 2010 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) MI     1,081.600 37.50000 1
735 2011 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (4) MI     306.800 42.50000 1
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     1,802.950 63.49095 2
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     1,847.070 63.40756 2
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     696.800 48.64237 2
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     2,000.800 69.80408 2
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     457.260 38.45952 2
738 2010 CLEANING / SWEEPING (SPOT) MI     150.000 7.00000 2
738 2011 CLEANING / SWEEPING (HANDWORK) SY     87,619.040 0.03288 2
738 2225 CLEAN / SWEEP - (HANDWORK) (BULLPEN) SY     120,515.640 0.05000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     77,250.000 4.87120 4
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     178.000 6.88483 4
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     142.000 5.95775 4
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     10,700.000 11.44299 4
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     150.000 29.58333 3
770 2006 REALIGN POSTS EA     1,625.000 14.61538 3
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     200.000 323.59250 4
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     123.000 59.75610 4
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     21,600.000 4.32292 4
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     2,695.000 12.02226 4
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     703.000 7.58890 3
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     695.000 17.03597 4
770 2017 REPAIR RAIL ELEMENT (T4S) LF     150.000 4.00000 1
770 2022 REM & RESET SGT IMPACT HEAD EA     725.000 65.89310 4
770 2023 REPLACE SGT OBJECT MARKER EA     154.000 5.65909 4
770 2024 REPLACE SGT CABLE ANCHOR EA     281.000 1.80815 4
770 2025 REPLACE SGT CABLE ASSEMBLY EA     256.000 2.55664 4
770 2026 REPLACE SGT STRUT EA     102.000 2.28431 4
770 2027 REMOVE & REPLACE BLOCKOUT EA     1,800.000 4.80556 4
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     1,100.000 5.18182 2
770 2040 RAISE RAIL ELEMENT LF     20,500.000 3.78049 2
772 2001 POST AND CABLE FENCE (REMOVAL) LF     130.000 2.99808 2
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA     1.000 20.00000 1
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     722.000 4.90582 3
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA     1.000 45.00000 1
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     60.000 15.83333 2
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA     5.000 46.00000 2
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     2,100.000 1.17143 2
774 2001 REMOVE AND REPLACE (TRACC) EA     1.000 500.00000 1
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA     1.000 500.00000 1
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA     1.000 1,000.00000 1
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA     1.000 500.00000 1
774 2006 REPAIR (TRACC) EA     52.000 456.50962 4
774 2008 REPAIR (WIDE TRACC) EA     8.000 430.90625 3
774 2010 REPAIR (REACT) EA     55.000 431.60909 3
774 2023 REPAIR REACT (N) (MISC HARDWARE) EA     1.000 300.00000 1
774 2024 REPAIR REACT (N) (REAR SEC "S") EA     1.000 350.00000 1
774 2025 REPAIR REACT (N) (REAR SEC "B") EA     1.000 350.00000 1
774 2026 REPAIR REACT (N) (FRONT SECTION) EA     1.000 750.00000 1
774 2027 REPAIR REACT (N) (CYLINDERS) EA     1.000 400.00000 1
774 2035 REPAIR REACT (CYLINDERS) EA     50.000 174.78500 2
780 2001 EPOXY INJECTION (TY IX) LF     46.000 85.00000 1
784 2002 REPAIRING STL BRIDGE MEMBER (DIAPHRAGM) EA     5.000 245.00000 1
784 2009 REPAIRING STL BRIDGE MEMBER (SHOES) EA     10.000 245.00000 1
788 2002 CONCRETE BEAM REPAIR (CFRP) EA     9.000 7,883.33333 2