AVERAGE LOW BID UNIT PRICE - MAINTENANCE - FORT WORTH DISTRICT

Last Update: Monday, February 8, 2016
ITEMS 712 2005 TO 772 6007
Items Items Bid Code Range
0100 - 0169
0216 - 0247
0316 - 0361
0427 - 0499
0500 - 0550
0644 - 0690
0712 - 0788
1122 - 1122
3267 - 3278
4159 - 4159
5414 - 5414
6001 - 6834
7012 - 7206
8251 - 8972
712 2005 - 772 6007
772 6009 - 788 2002
Item No Description Units January 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     626.180 700.00000 2
712 6005 JT / CRCK SEAL (RUBBER - ASPHALT) LF     377.830 400.00000 1
712 6008 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,052.550 654.61593 2
730 6002 FULL - WIDTH MOWING AC     146,430.000 33.09199 11
730 6003 SPOT MOWING AC     1,000.000 23.49800 6
731 6007 PAVEMENT EDGES, STRUCTURES & FIXTURES MI     1,732.200 81.48020 3
731 6011 BROADCAST APPLICATION AC     12,321.400 55.63304 3
735 6002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     14,006.310 29.34621 4
735 6006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     9,451.010 25.40405 2
735 6007 DEBRIS REMOVAL (SPOT DEBRIS) MI     250.000 45.30000 4
735 6008 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) MI     182.400 39.00000 1
735 6009 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) MI     3,187.200 39.00000 1
735 6010 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) MI     998.400 39.00000 1
735 6011 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (4) MI     283.200 39.00000 1
735 6012 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (5) MI     231.600 39.00000 1
735 6013 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (6) MI     123.600 39.00000 1
735 6014 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (7) MI     150.000 39.00000 1
735 6015 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (8) MI     258.000 39.00000 1
735 6016 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (9) MI     399.600 39.00000 1
735 6017 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (10 MI     422.400 39.00000 1
738 6002 CLEANING / SWEEPING (CENTER MEDIAN) MI     2,058.760 75.57447 3
738 6004 CLEANING / SWEEPING (OUTSIDE MAIN LANE MI     2,670.280 80.01202 4
738 6006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     682.800 76.26714 2
738 6008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP MI     2,127.260 83.00718 2
738 6009 CLEANING / SWEEPING (AGGREGATE REMOVAL MI     402.920 142.64668 3
738 6010 CLEANING / SWEEPING (SPOT) MI     400.000 93.12500 4
738 6011 CLEANING / SWEEPING (HANDWORK) SY     188,721.900 0.09073 2
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     660.800 2,191.00484 14
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     225.800 2,507.82516 14
752 2022 TREE REMOVAL (4" - 12" DIA) EA     3,480.000 65.11494 12
752 2023 TREE REMOVAL (12" - 18" DIA) EA     3,060.000 94.50980 12
752 2024 TREE REMOVAL (18" - 24" DIA) EA     1,640.000 163.41463 12
752 2025 TREE REMOVAL (24" - 30" DIA) EA     1,270.000 244.91520 14
752 2026 TREE REMOVAL (30" - 36" DIA) EA     900.000 436.44444 14
752 2027 TREE REMOVAL (36" - 42" DIA) EA     300.000 504.79860 12
752 2028 TREE REMOVAL (42" - 48" DIA) EA     84.000 691.66667 16
752 2029 TREE REMOVAL (48" - 60" DIA) EA     74.000 945.94595 14
752 6003 TREE TRIMMING / BRUSH REMOVAL MI     100.000 1,595.00000 1
752 6004 TREE TRIMMING / BRUSH REMOVAL (CHANNELS AC     20.000 1,695.00000 1
752 6005 TREE REMOVAL (4" - 12" DIA) EA     100.000 60.00000 1
752 6006 TREE REMOVAL (12" - 18" DIA) EA     100.000 79.00000 1
752 6007 TREE REMOVAL (18" - 24" DIA) EA     100.000 137.00000 1
752 6008 TREE REMOVAL (24" - 30" DIA) EA     10.000 245.00000 1
752 6009 TREE REMOVAL (30" - 36" DIA) EA     10.000 365.00000 1
752 6010 TREE REMOVAL (36" - 42" DIA) EA     2.000 543.95500 1
752 6011 TREE REMOVAL (42" - 48" DIA) EA     2.000 795.00000 1
752 6012 TREE REMOVAL (48" - 60" DIA) EA     2.000 1,295.00000 1
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF     100,000.000 2.20000 1
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF     37,500.000 12.60000 2
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     575.000 30.21739 2
770 6003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM LF     1,200.000 33.33333 2
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF     150.000 25.00000 1
770 6006 RAISE RAIL ELEMENT LF     1,150.000 9.60870 2
770 6008 REALIGN EXISTING RAIL LF     2,000.000 10.00000 1
770 6009 REPAIR RAIL ELEMENT (T4S) LF     2,500.000 130.00000 1
770 6010 REM / REPL TIMBER / STL POST W / O CONC FN EA     2,550.000 45.29412 2
770 6011 REM / REPL TIMBER / STL POST W / CONC FN EA     2,510.000 89.90040 2
770 6016 REPAIR STEEL POST WITH BASE PLATE EA     20.000 250.00000 1
770 6017 REALIGN POSTS EA     4,000.000 15.00000 1
770 6019 REMOVE & REPLACE BLOCKOUT EA     1,050.000 24.76190 2
770 6020 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUT EA     50.000 20.00000 1
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     8,500.000 13.82353 2
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA     950.000 77.89474 2
770 6024 REPLACE TERMINAL ANCHOR POSTS EA     10.000 250.00000 1
770 6025 REPLACE HINGED TOP SGT STEEL POST EA     10.000 80.00000 1
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA     210.000 2,885.71429 2
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     30.000 816.66667 2
770 6029 REM & RESET SGT IMPACT HEAD EA     200.000 62.50000 2
770 6030 REPLACE SGT CABLE ASSEMBLY EA     50.000 50.00000 2
770 6031 REPLACE SGT CABLE ANCHOR EA     30.000 83.33333 2
770 6032 REPLACE SGT STRUT EA     25.000 85.00000 2
770 6033 REPLACE SGT OBJECT MARKER EA     55.000 50.00000 2
770 6034 REPAIR RAIL ELEMENT (W - BEAM FURNISHED LF     10,000.000 7.00000 1
770 6035 REPAIR RAIL ELEMENT (THRIE - BEAM) (FURN LF     50.000 10.00000 1
770 6042 REM / REPL TIM / STL POST W CONC FND (FURN EA     100.000 80.00000 1
770 6043 REM / REP TIM / STL POST W / O CONC FND (FURN EA     100.000 30.00000 1
770 6044 INSTALL BLOCKOUTS (FURNISHED) EA     500.000 12.00000 1
770 6045 REM & REPLACE BLOCKOUTS (FURNISHED) EA     200.000 10.00000 1
770 6047 REPL SGT IMPACT HEAD (FURNISHED) EA     20.000 100.00000 1
770 6048 REPLACE SINGLE GDRAIL TERM POST (FURN) EA     100.000 40.00000 1
770 6049 REPLACE SGT CABLE ANCHOR (FURN) EA     10.000 5.00000 1
770 6050 REPLACE SGT CABLE ASSEMBLY (FURN) EA     10.000 5.00000 1
770 6051 REPLACE SGT STRUT (FURN) EA     10.000 5.00000 1
770 6052 REPAIR STEEL POST WITH BASE PLATE EA     200.000 250.00000 1
771 6001 REPLACE POSTS (TL - 3) EA     500.000 130.00000 1
771 6002 REPLACE POSTS (TL - 4) EA     200.000 125.00000 1
771 6003 CABLE SPLICE / TURNBUCKLE (TL - 3) EA     10.000 200.00000 1
771 6004 CABLE SPLICE / TURNBUCKLE (TL - 4) EA     20.000 200.00000 1
771 6005 REPAIR CONCRETE FOUNDATION (TL - 3) EA     10.000 50.00000 1
771 6006 REPAIR CONCRETE FOUNDATION (TL - 4) EA     5.000 50.00000 1
771 6007 REPR OR REPLC CABLE BARR TERM SEC (TL - 3 EA     2.000 2,500.00000 1
771 6008 REPR OR REPLC CABLE BARR TERM SEC (TL - 4 EA     20.000 500.00000 1
771 6009 REPLACE CABLE (TL - 3) LF     100.000 5.00000 1
771 6010 REPLACE CABLE (TL - 4) LF     400.000 4.00000 1
771 6011 CHECK / RE - TENSION CABLE EA     40.000 800.00000 2
771 6012 REPLACE POST HARDWARE (TL - 4) EA     20.000 52.00000 1
772 6001 POST AND CABLE FENCE (REMOVAL) LF     200.000 3.00000 1
772 6003 POST AND CABLE FENCE (NEW INSTALLATION LF     300.000 20.00000 1
772 6005 POST AND CABLE FENCE (REMV / REPL POSTS EA     50.000 50.00000 1
772 6007 POST AND CABLE FENCE (REMV / REPL CABLE LF     200.000 10.00000 1