Monthly State Let Construction Report For Fort Worth District As Of Apr 10, 2015 Page 5 Of 7

Last Update: Friday, April 10, 2015
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To TARRANT COUNTY ONLY FY 2013
CSJ 0902-48-849
Proj ID STP 2013(836)
Work Type BRIDGE REPAIR
 
0.100 2687139.38 0.00 2347835.14 87.3
Work Order 11-05-13
Work Began 04-13-14
Work Completed  
Time Computed 11-21-13
Contract Working Days 175
Addl Days Granted 22
Working Days Charged 170
Percent Time Used 86
Contractor(s)
SILVER CREEK CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-849
PEACHTREE CONSTRUCTION, LTD. ( 45.90%)
VIKING CONSTRUCTION, INC.(1.14%)
TEX OP CONSTRUCTION, LP(2.68%)
M & M STRIPING & POWER WASHING, LLC(1.78%)
COWBOY TRUCKING(0.00%)
GLORIA VALENZUELA ENTERPRISE, INC(0.00%)
Contract # 07133234
Totals 2687139.38 0.00 2347835.14 87.3

CountyTARRANT
Highway VA
From IH 20, IH 30, IH 820, IH 35W_AT
To VARIOUS LOCATIONS IN TARRANT COUNTY
CSJ 0902-48-895
Proj ID NH 1402(035)
Work Type GR, STR
 
0.100 1299947.50 120305.30 344624.40 26.5
Work Order 09-22-14
Work Began 01-15-15
Work Completed  
Time Computed 10-08-14
Contract Working Days 168
Addl Days Granted 2
Working Days Charged 50
Percent Time Used 29
Contractor(s)
SILVER CREEK CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-895
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08143242
Totals 1299947.50 120305.30 344624.40 26.5

CountyERATH
Highway CR
From CR 266 AT GREEN CREEK
To .
CSJ 0902-49-063
Proj ID BR 2009(105)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.100 457947.66 0.00 451326.83 98.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-02-14
Work Began 05-07-14
Work Completed  
Time Computed 05-07-14
Contract Working Days 51
Addl Days Granted 10
Working Days Charged 59
Percent Time Used 96
Contractor(s)
ELLIS-MCGINNIS CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0902-49-063
M & D FOUNDATION DRILLING INDUSTRIES, INC. (7.33%)
RICE ENVIRONMENTAL SERVICES(3.46%)
LONE OAK LANDSCAPE LLC (0.26%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.50%)
MCL CONTRACTING, LLC (0.46%)
KLP COMMERCIAL, LLC(0.00%)
Contract # 02143229
Totals 457947.66 0.00 451326.83 98.5

CountyERATH
Highway VA
From VARIOUS LOCATIONS
To AROUND STEPHENVILLE
CSJ 0902-49-066
Proj ID STP 2012(569)
Work Type LANDSCAPE ENHANCEMENT
 
0.282 379628.18 0.00 338748.91 89.2
Work Order 06-18-12
Work Began 10-01-12
Work Completed  
Time Computed 07-04-12
Contract Working Days 63
Addl Days Granted 0
Working Days Charged 60
Percent Time Used 95
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0902-49-066
MEMCO(6.42%)
LONE OAK LANDSCAPE LLC ( 50.03%)
Contract # 05123017
Totals 379628.18 0.00 338748.91 89.2

CountyERATH
Highway VA
From US 377/SH 108 INTERSECTION
To BU377J/LILLIAN ST; IN STEPHENVILLE
CSJ 0902-49-067
Proj ID STP 2013(193)
Work Type LANDSCAPE ENHANCEMENT
 
0.100 137204.63 0.00 135084.99 98.4
Work Order 09-26-13
Work Began 10-21-13
Work Completed  
Time Computed 10-12-13
Contract Working Days 36
Addl Days Granted 0
Working Days Charged 24
Percent Time Used 66
Contractor(s)
ALL AROUND LAWN CARE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-49-067
MEMCO( 14.55%)
Contract # 06133010
Totals 137204.63 0.00 135084.99 98.4

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To IN TARRANT COUNTY
CSJ 0902-90-012
Proj ID CM 2015(860)
Work Type ITS UPGRADES
 
0.100 91589.65 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 42
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
INDEPENDENT UTILITY CONSTRUCTION INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-012
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04153216
Totals 91589.65 0.00 0.00 0.0

CountyTARRANT
Highway CS
From SOUTH STEWART STREET AT ASH CREEK
To IN AZLE
CSJ 0902-90-017
Proj ID BR 2015(500)
Work Type REPLACE BR & APPRS
 
0.135 1115561.21 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-01-15
Work Began 00-00-00
Work Completed  
Time Computed 04-17-15
Contract Working Days 91
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
RAGLE CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-017
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02153037
Totals 1115561.21 0.00 0.00 0.0

CountyTARRANT
Highway IH 30
From LAS VEGAS TRAIL
To HORNE ST.
CSJ 1068-01-203
Proj ID NH 2015(595)
Work Type MILL AND OVERLAY
 
3.441 4161251.38 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-13-15
Work Began 00-00-00
Work Completed  
Time Computed 03-29-15
Contract Working Days 107
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1068-01-203
TEX OP CONSTRUCTION, LP(2.87%)
ALTUS TRAFFIC MANAGEMENT LLC (0.19%)
TOTAL HIGHWAY MAINTENANCE, LLC (5.64%)
O. TREVINO CONSTRUCTION, LLC ( 17.78%)
Contract # 02153026
Totals 4161251.38 0.00 0.00 0.0

CountyTARRANT
Highway IH 30
From COOPER_STREET
To FIELDER_ROAD
CSJ 1068-02-140
Proj ID IM 0304(097)
Work Type GR, BS AND SURFACE
 
0.999 639953.15 0.00 632534.52 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-19-13
Work Began 09-30-13
Work Completed  
Time Computed 09-04-13
Contract Working Days 64
Addl Days Granted 1
Working Days Charged 100
Percent Time Used 153
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1068-02-140
BRENDA PRICE TRUCKING(0.00%)
CROSSROADS, L.P. (0.75%)
DUSTROL, INC.(2.47%)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.(9.29%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (5.98%)
STRIPING TECHNOLOGY, L.P.(3.07%)
PEACHTREE CONSTRUCTION, LTD. (9.72%)
W.O.E. CONSTRUCTION(0.16%)
Contract # 06133215
Totals 639953.15 0.00 632534.52 99.9

CountyTARRANT
Highway IH 30
From IH 820
To W OF COOPER STREET
CSJ 1068-02-141
Proj ID IM 0304(099)
Work Type HMAC OVERLAY
 
5.681 5418484.81 238547.14 6852765.42 100.0
Work Order 04-25-14
Work Began 06-02-14
Work Completed 04-02-15
Time Computed 06-02-14
Contract Working Days 71
Addl Days Granted 0
Working Days Charged 154
Percent Time Used 216
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1068-02-141
DUSTROL, INC.( 10.85%)
PRIMATE CONSTRUCTION, INC. (3.47%)
TOTAL HIGHWAY MAINTENANCE, LLC (3.27%)
ALTUS TRAFFIC MANAGEMENT LLC (0.09%)
BRENDA PRICE TRUCKING(0.90%)
COWBOY TRUCKING(2.10%)
Contract # 02143222
Totals 5418484.81 238547.14 6852765.42 100.0

CountyTARRANT
Highway SS 341
From SH-183/IH-30 INTERCHANGE
To N WHITE SETTLEMENT RD INTERCHANGE
CSJ 1068-03-021
Proj ID STP 2013(288)
Work Type LANDSCAPE ENHANCEMENT
 
1.905 124997.55 970.00 120134.98 96.1
Work Order 09-17-13
Work Began 10-17-13
Work Completed  
Time Computed 10-03-13
Contract Working Days 30
Addl Days Granted 0
Working Days Charged 26
Percent Time Used 86
Contractor(s)
LANDSCAPE CONTRACTING AND IRRIGATION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1068-03-021
ALTUS TRAFFIC MANAGEMENT LLC (2.08%)
Contract # 08133024
Totals 124997.55 970.00 120134.98 96.1

CountyPARKER
Highway IH 30
From IH 20, AT WALSH RANCH PARKWAY
To TARRANT COUNTY LINE
CSJ 1068-05-009
Proj ID IM 0304(092)
Work Type GRADING, DRAINAGE, STRUCTURE & PAVE
 
1.541 14593117.40 764576.33 11744132.97 80.8
Work Order 09-03-13
Work Began 10-01-13
Work Completed  
Time Computed 09-19-13
Contract Working Days 225
Addl Days Granted 95
Working Days Charged 360
Percent Time Used 112
Contractor(s)
HAYDON BUILDING CORP.
SUBCONTRACTOR(S) FOR CCSJ: 1068-05-009
DALLAS LITE AND BARRICADE INC. (0.22%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (2.80%)
SCOTT DERR PAINTING CO (0.23%)
COWBOY TRUCKING(3.09%)
W.O.E. CONSTRUCTION(0.41%)
INDEPENDENT UTILITY CONSTRUCTION INCORPORATED(5.28%)
T-BAR FENCE, INC.(0.04%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.55%)
PEACHTREE CONSTRUCTION, LTD. (9.14%)
BUYERS BARRICADES, INC.(0.33%)
DUSTROL, INC.(0.53%)
HJC FARMS, INC.(1.45%)
ATS DRILLING, INC. (0.60%)
BREDA COMPANY, INC.(1.31%)
FORTSON CONTRACTING, INC.(0.05%)
LINDAMOOD DEMOLITION, INC. (0.01%)
ALLIED DRILLING COMPANY(0.08%)
Contract # 04133201
Totals 14593117.40 764576.33 11744132.97 80.8

CountyWISE
Highway FM 718
From SH 114
To NORTH END OF DERRETT CREEK BRIDGE
CSJ 1098-01-020
Proj ID STP 2011(599)
Work Type GRADING, DRAINAGE AND PAVEMENT
 
5.649 4598915.86 0.00 4378743.82 95.2
Work Order 12-03-13
Work Began 02-18-14
Work Completed  
Time Computed 02-02-14
Contract Working Days 225
Addl Days Granted 5
Working Days Charged 225
Percent Time Used 97
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1098-01-020
LANCO TURF & SEEDING, INC. (0.64%)
PEACHTREE CONSTRUCTION, LTD. (4.20%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.86%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.41%)
TEX OP CONSTRUCTION, LP(0.21%)
ALTUS TRAFFIC MANAGEMENT LLC (0.51%)
TRANSPORT TRUST(0.54%)
NORTH TEXAS CONTRACTING, INC.( 10.34%)
STORM WATER MANAGEMENT, INC. (0.51%)
STRIPING TECHNOLOGY, L.P.(1.70%)
CEN CONCRETE CONSTRUCTION COMPANY, INC.(2.93%)
Contract # 08133272
Totals 4598915.86 0.00 4378743.82 95.2

CountyPALO PINTO
Highway FM 919
From AT PANTHER CREEK RELIEF BRIDGE
To .
CSJ 1178-01-026
Proj ID BR 2007(290)
Work Type REPLACE BRIDGE
 
0.104 391234.00 0.00 390315.22 99.7
Work Order 05-29-14
Work Began 06-25-14
Work Completed  
Time Computed 06-14-14
Contract Working Days 46
Addl Days Granted 0
Working Days Charged 46
Percent Time Used 100
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 1178-01-026
BICK"S CONSTRUCTION, INC.( 22.02%)
FORTSON CONTRACTING, INC.(3.43%)
TRP CONSTRUCTION GROUP, LLC(0.00%)
STRIPING TECHNOLOGY, L.P.(1.18%)
Contract # 04143015
Totals 391234.00 0.00 390315.22 99.7

CountyWISE
Highway FM 920
From TRINITY RIVER
To 3.174 MI N OF SH 199
CSJ 1179-01-039
Proj ID STP 2013(900)
Work Type GR, BS AND PAVEMENT
 
12.795 5559330.74 30000.00 4770575.15 86.0
Work Order 11-14-13
Work Began 02-14-14
Work Completed  
Time Computed 11-30-13
Contract Working Days 205
Addl Days Granted 0
Working Days Charged 215
Percent Time Used 104
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1179-01-039
FORTSON CONTRACTING, INC.(0.88%)
NORTHEASTERN PAVERS, INC.( 15.58%)
CROSSROADS, L.P. (0.97%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (4.82%)
STRIPING TECHNOLOGY, L.P.(2.57%)
BRENDA PRICE TRUCKING(0.00%)
J.V. CONCRETE CONSTRUCTION ( 12.23%)
SYNERGY SIGNS & SERVICES (0.47%)
Contract # 08133251
Totals 5559330.74 30000.00 4770575.15 86.0

CountyPARKER
Highway FM 920 ETC
From WISE COUNTY LINE
To FM 51
CSJ 1179-02-034
Proj ID STP 2015(861)HES
Work Type CENTERLINE TEXTURING
 
129.654 596004.56 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 53
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TRP CONSTRUCTION GROUP, LLC
SUBCONTRACTOR(S) FOR CCSJ: 1179-02-034
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04153231
Totals 596004.56 0.00 0.00 0.0

CountyJOHNSON
Highway FM 917
From SH 171 IN GODLEY
To SH 174 IN JOSHUA
CSJ 1181-02-035
Proj ID STP 2014(394)
Work Type HMAC OVERLAY
 
8.950 2080434.45 0.00 1949303.95 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-11-14
Work Began 08-11-14
Work Completed 03-06-15
Time Computed 04-27-14
Contract Working Days 86
Addl Days Granted 0
Working Days Charged 73
Percent Time Used 84
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1181-02-035
ALTUS TRAFFIC MANAGEMENT LLC (0.30%)
VANN/ELLI, INC.(7.79%)
STRIPING TECHNOLOGY, L.P.(3.33%)
Contract # 02143214
Totals 2080434.45 0.00 1949303.95 100.0

CountyJACK
Highway FM 1156
From FM 1156 OVER BEANS CREEK
To .
CSJ 1309-01-029
Proj ID BR 2014(771)
Work Type REPL BRIDGE AND APPROACHES
 
0.174 930482.24 102863.21 490342.60 52.6
Work Order 08-27-14
Work Began 12-01-14
Work Completed  
Time Computed 09-12-14
Contract Working Days 171
Addl Days Granted 0
Working Days Charged 52
Percent Time Used 30
Contractor(s)
COPPELL CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 1309-01-029
CONTRACTORS SERVICE COMPANY(0.61%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (5.20%)
DUSTROL, INC.(0.95%)
DUSTIN ALLEN, INC. (1.37%)
GARY A. CRAIN, INC.(0.23%)
PEACHTREE CONSTRUCTION, LTD. (8.59%)
GJ SEEDING, LLC(2.41%)
MCL CONTRACTING, LLC (0.18%)
Contract # 06143022
Totals 930482.24 102863.21 490342.60 52.6

CountyWISE
Highway FM 2264
From CR 4431 N
To FM 407
CSJ 1310-03-025
Proj ID STP 2014(578)HES
Work Type GRADING, BASE, DRAINAGE, STRUCTURE, PAV
 
5.617 3983917.91 197950.00 452847.50 11.3
Work Order 10-30-14
Work Began 01-19-15
Work Completed  
Time Computed 11-15-14
Contract Working Days 200
Addl Days Granted 0
Working Days Charged 29
Percent Time Used 14
Contractor(s)
THE LANE CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 1310-03-025
NORTHEASTERN PAVERS, INC.(8.58%)
MARCOM"S MOWING SERVICE, LLC (0.43%)
ODUM SERVICES, L.P.(0.61%)
STORM WATER MANAGEMENT, INC. (0.83%)
CROSSROADS, L.P. (0.76%)
FARR FOUNDATION, INC.(3.07%)
STRIPING TECHNOLOGY, L.P.(1.36%)
WOLFE CONSTRUCTION GROUP, INC. (0.61%)
CEN CONCRETE CONSTRUCTION COMPANY, INC.(8.01%)
THELIN RECYCLING CO., LLC (OLD PRIME)(0.17%)
Contract # 09143040
Totals 3983917.91 197950.00 452847.50 11.3

CountyTARRANT
Highway FM 1187
From NEWT PATTERSON
To BU 287P
CSJ 1330-02-034
Proj ID STP 2010(399)ES
Work Type GRADING, DRAINAGE, STRUCTURES & PAV
 
1.503 6895052.12 0.00 12901332.42 99.9
Work Order 05-05-10
Work Began 06-17-11
Work Completed  
Time Computed 11-01-10
Contract Working Days 427
Addl Days Granted 325
Working Days Charged 751
Percent Time Used 99
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1330-02-034
UNDERGROUND COALITION, INC.(2.92%)
INLET STRUCTURE SPECIALTIES LTD. (2.88%)
DURABLE SPECIALTIES, INC.(2.04%)
BANDA TRUCKING COMPANY (0.10%)
STORM WATER MANAGEMENT, INC. (0.31%)
INDUS CONSTRUCTION, L.P. (8.05%)
AUSTIN BRIDGE & ROAD, LP ( 16.96%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.34%)
DUSTROL, INC.(0.53%)
JM MATERIALS, INC. (0.32%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.83%)
CONCRETE CUTTING BY BOND (0.56%)
Contract # 03103004
Totals 6895052.12 0.00 12901332.42 99.9