Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
County | PARKER |
Highway |
IH0020 |
From |
WEATHERFORD/MINERAL WELLS OFFICES & |
To |
GORDON LOCATION |
CSJ |
6298-59-001 |
Proj ID |
SUP - 629859001 |
Work Type |
JANITORIAL & GROUNDS WORK MAINTENANCE |
|
|
0.010 |
63455.12 |
4598.76 |
31071.32 |
48.9 |
Work Order |
01-25-16 |
Work Began |
02-01-16 |
Work Completed |
|
Time Computed |
02-01-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
208 |
Percent Time Used |
56 |
Contractor(s) |
TIBH INDUSTRIES, INC. I AM WORKS ASSOCIATION |
SUBCONTRACTOR(S) FOR CCSJ: 6298-59-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
01160231 |
|
Totals |
63455.12 |
4598.76 |
31071.32 |
48.9 |
|
County | JOHNSON |
Highway |
US0067 |
From |
JOHNSON COUNTY |
To |
WITHIN CITY LIMITS |
CSJ |
6298-98-001 |
Proj ID |
SUP - 629898001 |
Work Type |
LANDSCAPING MAINTENANCE |
|
|
0.010 |
20916.00 |
1924.00 |
14487.00 |
69.2 |
Work Order |
05-03-16 |
Work Began |
05-03-16 |
Work Completed |
|
Time Computed |
05-10-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
122 |
Percent Time Used |
33 |
Contractor(s) |
TIBH INDUSTRIES, INC. LIBERTY PROCLAIMED MINISTRY |
SUBCONTRACTOR(S) FOR CCSJ: 6298-98-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
03160232 |
|
Totals |
20916.00 |
1924.00 |
14487.00 |
69.2 |
|
County | TARRANT |
Highway |
IH0020 |
From |
VARIOUS ROADWAYS WITHIN |
To |
SOUTH TARRANT COUNTY |
CSJ |
6298-99-001 |
Proj ID |
SUP - 629899001 |
Work Type |
LANDSCAPE MAINTENANCE |
|
|
0.010 |
105030.00 |
0.00 |
56590.95 |
53.8 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
05-16-16 |
Work Began |
04-05-16 |
Work Completed |
|
Time Computed |
04-06-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
31 |
Percent Time Used |
8 |
Contractor(s) |
TIBH INDUSTRIES, INC. LIBERTY PROCLAIMED MINISTRY |
SUBCONTRACTOR(S) FOR CCSJ: 6298-99-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
03160231 |
|
Totals |
105030.00 |
0.00 |
56590.95 |
53.8 |
|
County | WISE |
Highway |
US0081 |
From |
VARIOUS ROADWAYS IN WISE COUNTY |
To |
VARIOUS ROADWAYS IN WISE COUNTY |
CSJ |
6299-51-001 |
Proj ID |
RMC - 629951001 |
Work Type |
FULL DEPTH CONCRETE PAVEMENT REPAIR |
|
|
0.010 |
160711.85 |
65852.41 |
300852.39 |
99.9 |
Work Order |
05-20-16 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
05-25-16 |
Contract Working Days |
10 |
Addl Days Granted |
0 |
Working Days Charged |
10 |
Percent Time Used |
100 |
Contractor(s) |
O. TREVINO CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6299-51-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
03160202 |
|
Totals |
160711.85 |
65852.41 |
300852.39 |
99.9 |
|
County | WISE |
Highway |
US0380 |
From |
VARIOUS LOCATIONS IN WISE AND JACK |
To |
COUNTIES |
CSJ |
6299-90-001 |
Proj ID |
RMC - 629990001 |
Work Type |
GUARDRAIL INSTALLATION AND REPAIR |
|
|
0.100 |
347400.00 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
MARCOM'S MOWING SERVICE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6299-90-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
04160201 |
|
Totals |
347400.00 |
0.00 |
0.00 |
0.0 |
|
County | WISE |
Highway |
US0081 |
From |
VARIOUS LOCATIONS IN |
To |
WISE COUNTY |
CSJ |
6299-91-001 |
Proj ID |
RMC - 629991001 |
Work Type |
DEBRIS REMOVAL |
|
|
0.010 |
194817.00 |
12077.80 |
16097.25 |
8.2 |
Work Order |
07-19-16 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
07-27-16 |
Contract Working Days |
180 |
Addl Days Granted |
0 |
Working Days Charged |
12 |
Percent Time Used |
6 |
Contractor(s) |
TEXAS TMA RENTAL |
SUBCONTRACTOR(S) FOR CCSJ: 6299-91-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
06160202 |
|
Totals |
194817.00 |
12077.80 |
16097.25 |
8.2 |
|
County | TARRANT |
Highway |
IH0820 |
From |
IH 820 AT SUN VALLEY SB FRT RD IN |
To |
SOUTH TARRANT COUTY |
CSJ |
6299-92-001 |
Proj ID |
EMC - 629992001 |
Work Type |
EMERGENCY SLOPE REPAIR |
|
|
0.010 |
470514.00 |
0.00 |
522321.28 |
99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
02-22-16 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
02-22-16 |
Contract Working Days |
27 |
Addl Days Granted |
0 |
Working Days Charged |
25 |
Percent Time Used |
92 |
Contractor(s) |
GIBSON & ASSOCIATES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6299-92-001 AXIS CONTRACTING, INC. ( 10.99%) ODUM SERVICES, L.P.(4.80%) ROCK SOLID, INC. ( 26.23%)
|
Contract # |
01160221 |
|
Totals |
470514.00 |
0.00 |
522321.28 |
99.9 |
|
County | JOHNSON |
Highway |
IH0035W |
From |
VARIOUS ROADWAYS IN |
To |
JOHNSON COUNTY |
CSJ |
6300-67-001 |
Proj ID |
RMC - 630067001 |
Work Type |
CLEANING & SHAPING DITCHES KEENE FY17 |
|
|
0.010 |
243000.00 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
TEXAS DRAINAGE INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6300-67-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
06160201 |
|
Totals |
243000.00 |
0.00 |
0.00 |
0.0 |
|
County | WISE |
Highway |
US0380 |
From |
VARIOUS LOCATIONS IN |
To |
WISE AND JACK COUNTIES |
CSJ |
6300-87-001 |
Proj ID |
RMC - 630087001 |
Work Type |
CRACKSEAL |
|
|
0.100 |
222933.28 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
35 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
D & M CONTRACTORS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6300-87-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07160202 |
|
Totals |
222933.28 |
0.00 |
0.00 |
0.0 |
|
County | PARKER |
Highway |
IH0020 |
From |
VARIOUS ROADWAYS WITHIN PARKER |
To |
AND PALO PINTO COUNTIES |
CSJ |
6301-31-001 |
Proj ID |
RMC - 630131001 |
Work Type |
CALL OUT REFLEC PAV MRKGS PARKER |
|
|
0.010 |
255737.50 |
22706.90 |
46165.60 |
18.0 |
Work Order |
07-11-16 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
07-14-16 |
Contract Working Days |
89 |
Addl Days Granted |
0 |
Working Days Charged |
7 |
Percent Time Used |
7 |
Contractor(s) |
TRP CONSTRUCTION GROUP, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6301-31-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
05160206 |
|
Totals |
255737.50 |
22706.90 |
46165.60 |
18.0 |
|
County | PALO PINTO |
Highway |
IH0020 |
From |
CR 119 |
To |
AT IH 20 |
CSJ |
6301-32-001 |
Proj ID |
RMC - 630132001 |
Work Type |
BRIDGE REPAIR |
|
|
0.010 |
64725.00 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
14 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
L.C. JORDAN & SON |
SUBCONTRACTOR(S) FOR CCSJ: 6301-32-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07160207 |
|
Totals |
64725.00 |
0.00 |
0.00 |
0.0 |
|
County | WISE |
Highway |
US0380 |
From |
VARIOUS LOCATIONS IN |
To |
WISE AND JACK COUNTIES |
CSJ |
6301-45-001 |
Proj ID |
RMC - 630145001 |
Work Type |
ROUTINE SWEEPING |
|
|
0.010 |
394056.00 |
41900.00 |
41900.00 |
10.6 |
Work Order |
07-29-16 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
07-27-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
2 |
Percent Time Used |
0 |
Contractor(s) |
CEN-TEX IRRIGATION SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6301-45-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
05160201 |
|
Totals |
394056.00 |
41900.00 |
41900.00 |
10.6 |
|
County | WISE |
Highway |
US0380 |
From |
VARIOUS LOCATIONS IN |
To |
WISE AND JACK COUNTIES |
CSJ |
6301-46-001 |
Proj ID |
RMC - 630146001 |
Work Type |
FLEXIBLE PAVEMENT REPAIR |
|
|
0.010 |
371425.00 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
09-12-16 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
09-22-16 |
Contract Working Days |
80 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
FNH CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6301-46-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
05160202 |
|
Totals |
371425.00 |
0.00 |
0.00 |
0.0 |
|
County | JOHNSON |
Highway |
IH0035W |
From |
JOHNSON COUNTY |
To |
. |
CSJ |
6301-97-001 |
Proj ID |
RMC - 630197001 |
Work Type |
SWEEPING AND DEBRIS REMOVAL |
|
|
0.010 |
136860.80 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
TEXAS TMA RENTAL |
SUBCONTRACTOR(S) FOR CCSJ: 6301-97-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07160205 |
|
Totals |
136860.80 |
0.00 |
0.00 |
0.0 |
|
County | TARRANT |
Highway |
IH0035W |
From |
SPECIAL MAINTENANCE |
To |
WAGGOMAN STREET |
CSJ |
6302-11-001 |
Proj ID |
SUP - 630211001 |
Work Type |
JANITORIAL MAINTENANCE |
|
|
0.010 |
8336.04 |
0.00 |
2778.68 |
33.3 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
154 |
Percent Time Used |
42 |
Contractor(s) |
TIBH INDUSTRIES, INC. I AM WORKS ASSOCIATION |
SUBCONTRACTOR(S) FOR CCSJ: 6302-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
04160231 |
|
Totals |
8336.04 |
0.00 |
2778.68 |
33.3 |
|
County | TARRANT |
Highway |
IH0030 |
From |
VARIOUS LOCATIONS WITHIN |
To |
SOUTH TARRANT COUNTY |
CSJ |
6302-93-001 |
Proj ID |
RMC - 630293001 |
Work Type |
CLEANING & SEALING JOINTS & CRACKS |
|
|
0.010 |
347656.40 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
45 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
CHAMPION INFRASTRUCTURE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6302-93-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07160204 |
|
Totals |
347656.40 |
0.00 |
0.00 |
0.0 |
|
County | TARRANT |
Highway |
IH0820 |
From |
VARIOUS LOCATION |
To |
WITHIN NORTH TARRANT |
CSJ |
6302-96-001 |
Proj ID |
RMC - 630296001 |
Work Type |
CLEANING SEALING JOINTS & CRACKS |
|
|
0.010 |
341295.00 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
38 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
CHAMPION INFRASTRUCTURE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6302-96-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07160203 |
|
Totals |
341295.00 |
0.00 |
0.00 |
0.0 |
|
County | JOHNSON |
Highway |
US0067 |
From |
VARIOUS ROADWAYS WITHIN |
To |
JOHNSON COUNTY |
CSJ |
6303-10-001 |
Proj ID |
SUP - 630310001 |
Work Type |
LITTER REMOVAL |
|
|
0.010 |
210810.78 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
TIBH INDUSTRIES, INC. LIBERTY PROCLAIMED MINISTRY |
SUBCONTRACTOR(S) FOR CCSJ: 6303-10-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
08160231 |
|
Totals |
210810.78 |
0.00 |
0.00 |
0.0 |
|
County | WISE |
Highway |
US0081 |
From |
LITTER REMOVAL WITHIN |
To |
WISE & JACK COUNTIES |
CSJ |
6303-11-001 |
Proj ID |
SUP - 630311001 |
Work Type |
LITTER REMOVAL |
|
|
0.010 |
230985.30 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
09-15-16 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
09-27-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
TIBH INDUSTRIES, INC. LIBERTY PROCLAIMED MINISTRY |
SUBCONTRACTOR(S) FOR CCSJ: 6303-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
08160232 |
|
Totals |
230985.30 |
0.00 |
0.00 |
0.0 |
|
County | TARRANT |
Highway |
IH0020 |
From |
VARIOUS LOCATIONS WITHIN |
To |
SOUTH TARRANT COUNTY |
CSJ |
6303-12-001 |
Proj ID |
SUP - 630312001 |
Work Type |
LITTER REMOVAL |
|
|
0.010 |
482216.16 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
TIBH INDUSTRIES, INC. LIBERTY PROCLAIMED MINISTRY |
SUBCONTRACTOR(S) FOR CCSJ: 6303-12-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
08160233 |
|
Totals |
482216.16 |
0.00 |
0.00 |
0.0 |
|