AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - HOUSTON DISTRICT

Last Update: Wednesday, July 2, 2014
ITEMS 100 2001 TO 164 2051
Items Items Bid Code Range
0100 - 0193
0247 - 0292
0305 - 0368
0400 - 0497
0500 - 0560
0610 - 0690
0730 - 0760
1009 - 1133
2034 - 2239
3061 - 3275
4001 - 4654
5050 - 5969
6004 - 6986
7384 - 7622
8020 - 8997
9009 - 9009
100 2001 - 164 2051
164 2052 - 193 2019
Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     94.270 10,605.34635 8
100 2002 PREPARING ROW STA 23.850 2,650.41929 1,881.560 16,042.99228 29
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     161.000 200.62112 2
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     162.000 242.04938 2
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     15.000 650.00000 1
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA 1.000 510.00000 57.000 13,763.33333 2
103 2001 DISPOSAL OF WATER WELLS EA     7.000 1,200.00000 1
104 2001 REMOVING CONC (PAV) SY     697,868.330 5.51489 20
104 2009 REMOVING CONC (RIPRAP) SY     102,877.440 3.67985 13
104 2011 REMOVING CONC (MEDIANS) SY     2,086.250 18.85127 7
104 2014 REMOVING CONC (FOUNDATIONS) CY     1.000 1,000.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY 13.000 36.05000 6,820.960 4.86510 11
104 2017 REMOVING CONC (DRIVEWAYS) SY 172.380 5.00000 19,731.900 7.38082 16
104 2021 REMOVING CONC (CURB) LF 30.000 10.30000 41,139.000 2.22509 15
104 2022 REMOVING CONC (CURB AND GUTTER) LF     12,773.000 1.32553 3
104 2023 REMOVING CONC (CTB) LF     32,774.000 4.55522 5
104 2024 REMOVING CONC (RETAINING WALLS) SY     18,658.600 20.62726 7
104 2025 REMOVE CONC (WINGWALL) CY     107.000 125.00000 1
104 2027 REMOVING CONC (APPR SLAB) SY     106.000 10.00000 1
104 2028 REMOVING CONC (MISC) SY     88.000 50.00000 1
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     21,428.000 2.78353 4
104 2031 REMOVING CONC (HEADWALL) CY     50.000 140.00000 1
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY 35.000 36.05000 216.340 17.73898 4
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     4,859.000 5.66974 6
104 2037 REMOVE CONC (RAIL) LF     35,143.000 8.40728 5
104 2040 REMOVING CONC (PAVERS) SY     5,447.000 5.65880 4
104 2044 REMOVING CONC (FLUME) SY     1,363.000 5.15407 2
104 2054 REMOVING CONCRETE (MOW STRIP) LF     2,514.000 7.68695 3
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     733.000 2.00000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     1,001.000 4.90010 2
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY 608.000 8.00000 2,941.400 4.26810 7
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY 3,875.000 3.00000 26,190.640 2.35210 5
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY 685.000 5.00000 685.000 5.00000 1
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY     210,631.000 3.15811 5
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     1,364.000 8.50000 1
105 2018 REMOVING STAB BASE AND ASPH PAV (7") SY     4,993.000 2.70000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY 4,780.890 17.50000 138,421.870 5.48821 7
105 2021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     70,804.000 1.09249 2
105 2022 REMOVING STAB BASE AND ASPH PAV (13") SY     778.000 13.74293 2
105 2026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY 209.000 10.00000 1,219.000 10.33142 2
105 2030 REMOVING STAB BASE & ASPH PAV (8" - 14") SY     6,630.000 10.00000 1
105 2036 REMOVING STAB BASE & ASPH PAV (15" - 20") SY     5,763.000 4.07000 1
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY 1,123.050 8.00000 66,525.050 2.25074 4
105 2039 REMOVE STAB BASE AND ASPH PAV (6" - 20") SY     559,382.000 2.00000 1
105 2041 REMOVING STAB BASE AND ASPH PAV (8") SY     94.000 5.00000 1
105 2043 REMOVING STAB BASE & ASPH PAV (0 - 6") SY     14,241.220 4.89836 5
105 2044 REMOVING STAB BASE AND ASPH PAV (10") SY     1,397.000 10.00000 1
105 2045 REMOVING STAB BASE AND ASPH PAV (2" - 8" SY     5,729.000 5.00000 2
105 2048 REMOVING STAB BASE & ASPH PAV (4" - 11") SY     3,504.000 5.66000 1
105 2049 REMOVING STAB BASE & ASPH PAV (4" - 22") SY     1,193.000 6.75000 1
105 2058 REMOVING STAB BASE & ASPH PAV (10" - 12" SY     2,744.000 15.00000 1
105 2075 REMOV STAB BASE AND ASPH PAV (10" - 18") SY     24,890.000 7.00000 1
105 2076 REMOV STAB BASE AND ASPH PAV (2" - 15") SY     5,350.000 5.29920 2
105 2084 REM STAB BASE & ASPH (6" - 12") SY     218,656.000 2.00000 1
105 2085 REMOVING STAB BASE & ASPH PAV (0 - 19 IN SY     8,059.000 4.00000 1
105 2088 REMOVING STAB BASE AND ASPH PAV (0" - 5") SY     174,422.000 2.00000 1
110 2001 EXCAVATION (ROADWAY) CY 2,056.000 20.58609 1,636,262.620 6.23404 43
110 2002 EXCAVATION (CHANNEL) CY 117.000 28.63248 53,492.000 7.57811 10
110 2003 EXCAVATION (SPECIAL) CY     354,163.000 4.79229 5
110 2004 EXCAVATION (ROADWAY AND CHANNEL) CY     385.000 11.00000 1
112 2001 SUBGRADE WIDENING (ORD COMP) STA     272.440 571.67039 5
112 2002 SUBGRADE WIDENING (DENS CONT) STA 165.260 979.12380 576.840 1,277.97916 13
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     2,648.000 14.03437 2
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     788.000 16.19924 3
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     15,728.000 7.81142 5
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 6,633.300 8.97721 1,938,470.380 3.43845 34
132 2036 EMBANK (FINAL) (DC) (TY E) (CSBE) CY     173,977.600 24.89044 11
132 2037 EMB (FNL) (DC) (TYE) (CSBE) (RWALL FND IMPR CY     18,135.000 21.79449 4
134 2001 BACKFILL (TY A) STA 151.560 184.12609 2,415.690 289.17179 10
134 2002 BACKFILL (TY B) STA 2.000 250.00000 2.000 250.00000 1
134 2003 BACKFILL (TY C) STA     12.580 250.00000 1
134 2004 BACKFILL (TY A OR B) STA 13.600 325.00000 1,762.770 158.66038 8
150 2001 BLADING STA     13.000 140.00000 1
150 2002 BLADING HR 10.000 75.00000 661.000 73.97882 4
156 2001 BULLDOZER WORK HR 8.000 97.00000 101.000 96.91089 3
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     2,230.000 1.50000 1
160 2005 FURNISHING AND PLACING TOPSOIL CY 207.000 20.20000 10,569.000 24.05009 5
160 2006 FURNISHING AND PLACING TOPSOIL (3") SY     46,368.000 1.00000 1
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     27,430.100 .63000 1
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     908.000 2.00000 1
161 2009 EROSION CONTROL COMPOST CY 12.000 31.70000 13,179.500 18.09136 9
161 2012 GENERAL USE COMPOST CY 6,232.000 16.65385 12,757.500 21.05625 7
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY     1,107,618.900 .60299 18
161 2023 EROSION CONTROL COMPOST (4") SY 897.000 4.00000 897.000 4.00000 1
162 2002 BLOCK SODDING SY 87,381.060 2.64844 1,869,360.920 2.44749 44
162 2003 STRAW OR HAY MULCH SY 7,000.000 .48190 2,950,810.610 .13231 32
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     152,399.000 .12172 3
164 2009 BROADCAST SEED (TEMP) (WARM) SY     226,048.110 .11576 9
164 2011 BROADCAST SEED (TEMP) (COOL) SY     5,432.000 .30000 1
164 2014 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY AC     .250 1,600.00000 1
164 2025 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) SY     225.000 2.88000 1
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     5,511.000 .16000 1
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     46,575.680 .10347 2
164 2037 DRILL SEEDING (PERM) (URBAN) (SANDY) SY     817,891.670 .09848 10
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     176,732.000 .12346 5
164 2041 DRILL SEEDING (TEMP) (WARM) SY     509,990.000 .08889 4
164 2043 DRILL SEEDING (TEMP) (COOL) SY     165,675.000 .10000 1
164 2045 STRAW OR HAY MULCHING SY     1,330.000 .10000 1
164 2048 STRAW / HAY MLCH SEED (TEMP) (WARM) AC     .250 1,100.00000 1
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY 66,575.000 .09984 1,060,100.220 .10987 18