AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - HOUSTON DISTRICT

Last Update: Tuesday, September 30, 2014
ITEMS 100 2001 TO 164 2048
Items Items Bid Code Range
0100 - 0193
0247 - 0292
0305 - 0368
0400 - 0497
0500 - 0560
0610 - 0690
0720 - 0784
1009 - 1146
2034 - 2305
3061 - 3275
4001 - 4679
5050 - 5969
6006 - 6986
7384 - 7622
8020 - 8997
9009 - 9009
100 2001 - 164 2048
164 2051 - 193 2019
Item No Description Units Sept 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     77.907 6,089.34691 5
100 2002 PREPARING ROW STA 61.640 4,604.19906 2,111.990 25,425.75045 33
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     197.000 164.80203 2
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     162.000 242.04938 2
100 2006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     1.000 830.55000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     15.000 650.00000 1
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     36.000 35.00000 1
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA 7.000 588.72000 73.000 94.60329 3
100 2011 PREPARING ROW (TREE) (24" TO 36" DIA.) EA     44.000 35.00000 1
104 2001 REMOVING CONC (PAV) SY 10,101.000 5.93000 849,646.330 5.33245 27
104 2009 REMOVING CONC (RIPRAP) SY 1,860.000 5.93000 138,549.440 3.83225 20
104 2011 REMOVING CONC (MEDIANS) SY     449.000 25.89755 2
104 2014 REMOVING CONC (FOUNDATIONS) CY     56.000 263.39286 2
104 2015 REMOVING CONC (SIDEWALKS) SY 176.000 11.85000 5,074.950 5.44603 11
104 2017 REMOVING CONC (DRIVEWAYS) SY 169.000 11.85000 18,728.480 6.66536 13
104 2021 REMOVING CONC (CURB) LF 132.000 4.94000 40,073.000 3.37921 17
104 2022 REMOVING CONC (CURB AND GUTTER) LF     37,577.000 2.34125 3
104 2023 REMOVING CONC (CTB) LF 1,319.000 11.85000 39,580.000 4.58271 7
104 2024 REMOVING CONC (RETAINING WALLS) SY 420.000 43.46000 21,617.600 20.90251 9
104 2025 REMOVE CONC (WINGWALL) CY     107.000 125.00000 1
104 2027 REMOVING CONC (APPR SLAB) SY     106.000 10.00000 1
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     26,308.000 2.56578 4
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY 26.000 27.66000 194.000 35.40546 3
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY 75.000 1.00000 3,913.000 6.07071 6
104 2037 REMOVE CONC (RAIL) LF     43,421.000 8.20216 8
104 2040 REMOVING CONC (PAVERS) SY     4,778.000 5.15854 2
104 2042 REMOVING CONC (MOVABLE BARRIER) LF     10,820.000 4.00000 1
104 2044 REMOVING CONC (FLUME) SY     1,991.000 6.68257 3
104 2054 REMOVING CONCRETE (MOW STRIP) LF 4,614.000 8.00000 6,814.000 7.60801 4
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     254.000 6.00000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     10,712.000 2.25000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY 10,101.000 4.27000 12,000.400 4.43064 6
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     14,605.640 1.88247 5
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     685.000 5.00000 1
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY     152,894.000 3.24850 4
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     13,284.000 4.00000 1
105 2018 REMOVING STAB BASE AND ASPH PAV (7") SY     4,993.000 2.70000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     229,885.890 4.48285 7
105 2021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     657.000 3.30000 1
105 2022 REMOVING STAB BASE AND ASPH PAV (13") SY     604.000 10.50000 1
105 2026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY     1,219.000 10.33142 2
105 2029 REMOVE STAB BASE & ASPH PAV (24") SY     13,148.000 4.30000 1
105 2036 REMOVING STAB BASE & ASPH PAV (15" - 20") SY     5,763.000 4.07000 1
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     1,168.050 8.15410 2
105 2039 REMOVE STAB BASE AND ASPH PAV (6" - 20") SY     666,667.000 2.16093 2
105 2041 REMOVING STAB BASE AND ASPH PAV (8") SY     1,919.000 4.52449 2
105 2043 REMOVING STAB BASE & ASPH PAV (0 - 6") SY 3,056.000 4.25000 8,268.000 4.69127 2
105 2044 REMOVING STAB BASE AND ASPH PAV (10") SY     1,397.000 10.00000 1
105 2045 REMOVING STAB BASE AND ASPH PAV (2" - 8" SY     3,191.000 5.00000 1
105 2049 REMOVING STAB BASE & ASPH PAV (4" - 22") SY     73,863.000 3.00000 1
105 2060 REMOVING STAB BASE & ASPH PAV (15" - 20" SY     2,061.000 9.00000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     165,806.000 2.06935 2
105 2070 REMOVING STAB BASE & ASPH PAV (6" - 8" SY     5,773.000 3.00000 1
105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY     56,318.000 2.32000 1
105 2075 REMOV STAB BASE AND ASPH PAV (10" - 18") SY     24,890.000 7.00000 1
105 2076 REMOV STAB BASE AND ASPH PAV (2" - 15") SY     3,084.000 2.58000 1
105 2084 REM STAB BASE & ASPH (6" - 12") SY     274,989.000 2.20486 2
105 2085 REMOVING STAB BASE & ASPH PAV (0 - 19 IN SY     8,059.000 4.00000 1
105 2088 REMOVING STAB BASE AND ASPH PAV (0" - 5") SY     174,422.000 2.00000 1
110 2001 EXCAVATION (ROADWAY) CY 9,651.000 11.79693 1,897,702.400 6.79894 40
110 2002 EXCAVATION (CHANNEL) CY     31,139.000 10.23655 9
110 2003 EXCAVATION (SPECIAL) CY     489,222.630 5.85893 7
112 2001 SUBGRADE WIDENING (ORD COMP) STA     41.240 1,151.93695 3
112 2002 SUBGRADE WIDENING (DENS CONT) STA     519.880 656.24760 7
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 110.000 35.56000 69,584.000 10.06540 4
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     1,187.000 19.00000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     469.000 17.01493 2
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     9,584.000 6.00000 1
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY 2,084.000 23.00000 3,598.400 21.62539 4
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 3,921.000 8.51000 2,578,907.700 3.38559 34
132 2034 EMB (FNL) (DC) (TYC) (CSBE) (RWALL FND IMPR CY     4,222.000 44.00000 1
132 2036 EMBANK (FINAL) (DC) (TY E) (CSBE) CY 301.000 93.84000 257,590.390 22.11509 13
132 2037 EMB (FNL) (DC) (TYE) (CSBE) (RWALL FND IMPR CY     32,123.000 21.73471 5
134 2001 BACKFILL (TY A) STA 569.000 244.78032 2,969.580 260.82287 10
134 2002 BACKFILL (TY B) STA     2.000 250.00000 1
134 2003 BACKFILL (TY C) STA     12.580 250.00000 1
134 2004 BACKFILL (TY A OR B) STA 11.200 500.00000 1,317.800 184.12088 8
150 2001 BLADING STA     13.000 140.00000 1
150 2002 BLADING HR     792.000 78.53535 6
156 2001 BULLDOZER WORK HR     115.000 116.31304 3
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     38,278.000 1.02913 2
160 2005 FURNISHING AND PLACING TOPSOIL CY     11,138.000 24.60767 7
161 2008 EROSION CONTROL COMPOST (2") SY     27,434.000 1.02000 1
161 2009 EROSION CONTROL COMPOST CY     26,917.000 18.73052 9
161 2012 GENERAL USE COMPOST CY     26,008.000 20.30921 8
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY 22,986.000 3.95000 712,562.340 .69090 17
161 2023 EROSION CONTROL COMPOST (4") SY     897.000 4.00000 1
162 2002 BLOCK SODDING SY 20,942.000 5.17205 2,476,741.540 2.67824 47
162 2003 STRAW OR HAY MULCH SY 7,877.000 .55000 1,881,566.650 .19142 29
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     166,947.000 .11896 3
164 2009 BROADCAST SEED (TEMP) (WARM) SY     172,973.890 .11831 7
164 2014 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY AC     .250 1,600.00000 1
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     5,511.000 .16000 1
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     445.000 3.00000 1
164 2037 DRILL SEEDING (PERM) (URBAN) (SANDY) SY 22,986.000 .84000 639,932.340 .12826 10
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     39,823.000 .19071 3
164 2041 DRILL SEEDING (TEMP) (WARM) SY     207,626.000 .10183 3
164 2043 DRILL SEEDING (TEMP) (COOL) SY     165,675.000 .10000 1
164 2045 STRAW OR HAY MULCHING SY     11,102.000 .18802 2
164 2048 STRAW / HAY MLCH SEED (TEMP) (WARM) AC     .250 1,100.00000 1