AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - HOUSTON DISTRICT

Last Update: Tuesday, May 5, 2015
ITEMS 100 2001 TO 162 6003
Items Items Bid Code Range
0100 - 0193
0247 - 0292
0305 - 0368
0400 - 0497
0500 - 0560
0610 - 0690
0720 - 0788
1009 - 1146
2034 - 2305
3000 - 3275
4001 - 4679
5050 - 5969
6001 - 6986
7224 - 7661
8020 - 8982
9009 - 9009
100 2001 - 162 6003
164 2001 - 193 2023
Item No Description Units April 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     75.377 3,801.91239 5
100 2002 PREPARING ROW STA     1,423.620 19,861.12966 28
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     197.000 164.80203 2
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     116.000 250.00000 1
100 2006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     1.000 830.55000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     15.000 650.00000 1
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     36.000 35.00000 1
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     73.000 94.60329 3
100 2011 PREPARING ROW (TREE) (24" TO 36" DIA.) EA     44.000 35.00000 1
100 6002 PREPARING ROW STA     123.870 3,789.05304 2
104 2001 REMOVING CONC (PAV) SY     208,455.000 5.02588 18
104 2009 REMOVING CONC (RIPRAP) SY     42,759.500 5.93276 12
104 2010 REMOVING CONC (RIPRAP) CY     364.000 25.00000 1
104 2011 REMOVING CONC (MEDIANS) SY     1,871.000 12.65660 5
104 2014 REMOVING CONC (FOUNDATIONS) CY     62.000 286.29032 3
104 2015 REMOVING CONC (SIDEWALKS) SY     6,441.500 8.08394 12
104 2017 REMOVING CONC (DRIVEWAYS) SY     10,544.380 9.47592 13
104 2021 REMOVING CONC (CURB) LF     16,988.000 6.28529 14
104 2022 REMOVING CONC (CURB AND GUTTER) LF     25,130.000 3.00557 2
104 2023 REMOVING CONC (CTB) LF     7,558.000 4.44498 3
104 2024 REMOVING CONC (RETAINING WALLS) SY     4,214.670 25.03240 5
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     17,929.000 3.53109 3
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     1,752.000 15.55586 6
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     2,028.000 10.41923 6
104 2037 REMOVE CONC (RAIL) LF     8,278.000 7.33136 3
104 2042 REMOVING CONC (MOVABLE BARRIER) LF     10,820.000 4.00000 1
104 2044 REMOVING CONC (FLUME) SY     628.000 10.00000 1
104 2054 REMOVING CONCRETE (MOW STRIP) LF     4,614.000 8.00000 2
104 6001 REMOVING CONC (PAV) SY 1,513.000 5.00000 5,513.000 13.61600 3
104 6009 REMOVING CONC (RIPRAP) SY     10.000 90.00000 1
104 6021 REMOVING CONC (CURB) LF     290.000 16.12931 3
104 6027 REMOVING CONC (APPR SLAB) SY     79.000 15.00000 1
104 6054 REMOVING CONCRETE (MOW STRIP) LF 4,051.500 9.59311 22,067.500 5.93391 5
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     254.000 6.00000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     10,712.000 2.25000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     16,952.000 3.56780 3
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     5,963.000 2.64984 2
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     685.000 5.00000 1
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY     3,821.000 3.38890 2
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     20,533.000 3.82348 2
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     98,026.890 3.71247 3
105 2021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     657.000 3.30000 1
105 2026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY     209.000 10.00000 1
105 2029 REMOVE STAB BASE & ASPH PAV (24") SY     13,148.000 4.30000 1
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     54,949.050 6.15194 4
105 2039 REMOVE STAB BASE AND ASPH PAV (6" - 20") SY     107,285.000 3.00000 1
105 2041 REMOVING STAB BASE AND ASPH PAV (8") SY     1,919.000 4.52449 2
105 2043 REMOVING STAB BASE & ASPH PAV (0 - 6") SY     8,268.000 4.69127 2
105 2049 REMOVING STAB BASE & ASPH PAV (4" - 22") SY     73,863.000 3.00000 1
105 2060 REMOVING STAB BASE & ASPH PAV (15" - 20" SY     2,061.000 9.00000 1
105 2065 REMOVING STAB BASE AND ASPH PAV (1") SY     10,647.000 4.00000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     165,806.000 2.06935 2
105 2070 REMOVING STAB BASE & ASPH PAV (6" - 8" SY     5,773.000 3.00000 1
105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY     56,318.000 2.32000 1
105 2084 REM STAB BASE & ASPH (6" - 12") SY     83,257.000 4.29354 2
105 6021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY 1,998.590 17.00000 1,998.590 17.00000 1
105 6037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     7,269.000 3.25000 1
105 6044 REMOVING STAB BASE AND ASPH PAV (10") SY     9,828.000 3.86050 2
105 6106 REMOVING STAB BASE AND ASPH PAV (6" - 9") SY 1,513.000 5.00000 1,513.000 5.00000 1
110 2001 EXCAVATION (ROADWAY) CY     903,419.310 7.29235 31
110 2002 EXCAVATION (CHANNEL) CY     62,519.000 11.07732 11
110 2003 EXCAVATION (SPECIAL) CY     225,405.630 6.82621 6
110 6001 EXCAVATION (ROADWAY) CY     34,157.000 5.67746 3
110 6002 EXCAVATION (CHANNEL) CY     86.000 8.50000 1
112 2001 SUBGRADE WIDENING (ORD COMP) STA     13.760 1,828.48837 2
112 2002 SUBGRADE WIDENING (DENS CONT) STA     539.140 769.66836 7
112 6002 SUBGRADE WIDENING (DENS CONT) STA     10.000 2,000.00000 1
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     69,584.000 10.06540 4
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     78.000 20.00000 1
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     9,584.000 6.00000 1
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     2,588.400 28.11266 3
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     1,214,298.900 4.81128 26
132 2034 EMB (FNL) (DC) (TYC) (CSBE) (RWALL FND IMPR CY     4,222.000 44.00000 1
132 2036 EMBANK (FINAL) (DC) (TY E) (CSBE) CY     127,894.790 23.22308 7
132 2037 EMB (FNL) (DC) (TYE) (CSBE) (RWALL FND IMPR CY     15,427.000 24.28709 3
132 6006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     54,969.000 6.96085 2
132 6035 EMBANK (FINAL) (DC) (TY E) (CSBE) CY     21,725.000 30.00000 1
134 2001 BACKFILL (TY A) STA     1,129.040 304.32947 7
134 2002 BACKFILL (TY B) STA     2.000 250.00000 1
134 2003 BACKFILL (TY C) STA     12.580 250.00000 1
134 2004 BACKFILL (TY A OR B) STA     64.460 422.33944 5
134 6001 BACKFILL (TY A) STA 558.000 150.00000 998.000 209.07816 2
134 6004 BACKFILL (TY A OR B) STA 1,726.940 148.63675 2,314.940 160.07186 5
150 2001 BLADING STA     28.070 30.00000 1
150 2002 BLADING HR     141.000 99.64539 3
156 2001 BULLDOZER WORK HR     46.000 140.78261 2
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     36,048.000 1.00000 1
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     21.000 10.00000 1
160 2005 FURNISHING AND PLACING TOPSOIL CY     801.000 32.46092 4
160 2006 FURNISHING AND PLACING TOPSOIL (3") SY     2,131.000 3.00000 1
161 2008 EROSION CONTROL COMPOST (2") SY     27,434.000 1.02000 1
161 2009 EROSION CONTROL COMPOST CY     14,118.000 19.74751 6
161 2012 GENERAL USE COMPOST CY     19,737.000 18.82516 7
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY     1,615,444.340 .24307 13
161 2023 EROSION CONTROL COMPOST (4") SY     897.000 4.00000 1
161 6017 COMPOST MANUF TOPSOIL (4") SY     459,655.000 .65182 2
162 2002 BLOCK SODDING SY     1,511,608.660 2.79030 43
162 2003 STRAW OR HAY MULCH SY     814,992.760 .19335 18
162 6002 BLOCK SODDING SY     9,788.000 2.72911 2
162 6003 STRAW OR HAY MULCH SY     793,470.000 .13207 2