AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - HOUSTON DISTRICT

Last Update: Friday, October 31, 2014
ITEMS 476 2027 TO 497 2001
Items Items Bid Code Range
0100 - 0193
0247 - 0292
0305 - 0368
0400 - 0497
0500 - 0560
0610 - 0690
0720 - 0784
1009 - 1146
2034 - 2305
3061 - 3275
4001 - 4679
5050 - 5969
6006 - 6986
7384 - 7661
8020 - 8997
9009 - 9009
400 2001 - 425 2018
425 2019 - 460 2003
460 2004 - 466 2007
466 2009 - 476 2014
476 2027 - 497 2001
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
476 2027 JACK BOR OR TUN PIPE (54 IN) (RC) (CL V) LF     538.000 685.20000 1
476 2055 JACK OR TUN BOX CULV (7 FT X 6 FT) LF     329.000 2,043.00000 1
476 2063 JACK OR TUN BOX CULV (9 FT X 6 FT) LF     54.000 1,800.00000 1
476 2064 JACK OR TUN BOX CULV (9 FT X 7 FT) LF     70.000 1,900.00000 1
476 2069 JACK OR TUN BOX CULV (10 FT X 7 FT) LF     48.000 2,000.00000 1
479 2001 ADJ MANHS EA     60.000 393.38617 6
479 2002 ADJ INLETS EA     51.000 722.58039 3
479 2003 ADJ MANHS & INLETS EA     15.000 1,145.00000 1
479 2004 ADJ MANHS (SANITARY) EA     12.000 450.00000 1
479 2005 ADJ MANHS (WATER VALVE BOX) EA     2.000 210.00000 1
479 2006 ADJUST INLET (CAP) EA     161.000 888.82776 10
479 2007 ADJ MANH (CAP) EA     8.000 1,363.04750 4
480 2001 CLEAN EXIST CULVS EA     41.000 1,047.56098 2
481 2012 PVC PIPE (SCH 40) (6 IN) LF     2,779.000 31.61000 1
481 2013 PVC PIPE (SCH 40) (8 IN) LF     7,756.000 35.02943 4
481 2014 PVC PIPE (SCH 40) (10 IN) LF     3,505.000 42.84245 3
483 2001 SCARIFY CONC BRIDGE SLAB SY     165.200 25.43995 1
491 2001 TREAT TIMBER MBF     13.100 11,880.01985 1
496 2002 REMOV STR (INLET) EA 11.000 900.00000 332.000 523.94367 15
496 2003 REMOV STR (MANHOLE) EA     48.000 617.66688 6
496 2004 REMOV STR (SET) EA     604.000 506.38113 11
496 2005 REMOV STR (WINGWALL) EA     25.000 1,163.58000 6
496 2006 REMOV STR (HEADWALL) EA     81.000 1,221.26914 7
496 2007 REMOV STR (PIPE) LF     66,016.000 16.30063 28
496 2008 REMOV STR (BOX CULVERT) LF     9,022.000 25.59875 6
496 2009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA     14.000 22,392.85714 8
496 2010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA     31.000 42,056.13097 6
496 2011 REMOV STR (BRIDGE 500 - 999 FT LENGTH) EA     5.000 342,724.34000 3
496 2012 REMOV STR (BRIDGE 1000 FT OR GREATER) EA     4.000 404,320.16500 3
496 2013 REMOV STR (BRIDGE SLAB) EA     1.000 400,000.00000 1
496 2014 REMOV STR (RAILROAD CROSSING) EA     1.000 20,000.00000 1
496 2015 REMOV STR (PICNIC AREA) EA     1.000 500.00000 1
496 2016 REMOV STR (PIPE) EA     1.000 250.00000 1
496 2018 REMOVE STR (CONC) EA     7.000 10,200.00000 1
496 2024 REMOVE STR (ANCHOR LUG) EA     20.000 1,000.00000 1
496 2030 REMOVE STR (BOLLARD) EA     30.000 56.28000 2
496 2037 REMOV STR (DOLPHIN AND FENDER SYS) EA     2.000 17,657.94000 1
496 2044 REMOV STR (TIMBER PILING) EA     20.000 107.50000 2
496 2049 REMOV STR (PUMP STA) (INTERN COMPONENTS EA     1.000 24,858.00000 1
496 2050 REMOV STR (PUMP STA) (WALLS AND ROOF) EA     1.000 42,572.00000 1
496 2051 REMOV STR (DRIVEWAY CULVERT) EA     12.000 1,000.00000 1
496 2072 REMOV STR (LIGHT BRACKET) EA     24.000 26.50000 1
496 2074 REMOVING ROCK RIPRAP LF     40.000 69.30000 1
497 2001 SALV MATRL (CREDIT ITEM) LS     1.000 1.00000 1