Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 2.000 12,500.00000 32.000 91,005.46875 32
500 2007 MOBILIZATION (EMERGENCY) EA 56.000 319.28571 56.000 319.28571 2
500 2010 MOBILIZATION (PER CALL OUT) EA 251.000 231.58566 251.000 231.58566 7
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 20,000.00000 85.000 5,021.54118 31
506 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     250.000 16.00000 1
506 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     250.000 20.00000 1
506 2009 ROCK FILTER DAMS (REMOVE) LF     500.000 6.00000 1
506 2034 TEMPORARY SEDIMENT CONTROL FENCE LF     895.000 2.72067 2
508 2002 CONSTRUCTING DETOURS SY     25.000 75.00000 1
512 2002 PORT CTB (FUR & INST) (SAFETY SH) (TY 2) LF     300.000 45.00000 1
512 2010 PORT CTB (DES SOURCE) (SAFETY SH) (TY 1) LF     400.000 3.50000 2
512 2011 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) LF     1,227.000 1.73350 5
512 2013 PORT CTB (DES SOURCE) (SNGL SLP) (TY 1) LF     600.000 17.00000 1
512 2017 PORT CTB (DES SOURCE) (LOW PROF) (TY 1) LF     2,440.000 15.73770 2
512 2018 PORT CTB (DES SOURCE) (LOW PROF) (TY 2) LF     100.000 14.00000 2
512 2020 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     25,962.000 3.02600 9
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF     675.000 1.00000 2
512 2023 PORT CTB (MOVE) (SNGL SLP) (TY 2) LF     600.000 1.00000 2
512 2025 PORT CTB (MOVE) (SNGL SLP) (TY 4) LF     150.000 1.00000 1
512 2028 PORT CTB (STKPL) (SAFETY SH) (TY 1) LF     200.000 5.00000 2
512 2029 PORT CTB (STKPL) (SAFETY SH) (TY 2) LF     702.000 2.28205 5
512 2031 PORT CTB (STKPL) (SNGL SLP) (TY 1) LF     600.000 17.00000 1
512 2035 PORT CTB (STKPL) (LOW PROF) (TY 1) LF     2,440.000 15.91598 2
512 2036 PORT CTB (STKPL) (LOW PROF) (TY 2) LF     100.000 14.40000 2
512 2038 PORT CTB (REMOVE) (SAFETY SH) (TY 2) LF     765.000 3.27451 4
512 2055 PORT CTB (MOVE) (F - SHAPE) (TY 4) LF     3,000.000 4.00000 2
512 2059 PORT CTB (DES SOURCE) (SNGL SLP) (TY J - J LF     60.000 7.00000 1
512 2061 PORT CTB (STKPL) (SNGL SLP) (TY J - J) LF     60.000 7.00000 1
514 2001 PERM CONC TRF BARR (SAFETY SH) (TY 1) LF 20.000 20.00000 95.000 9.73684 2
529 2002 CONC CURB (TY II) LF     400.000 15.68500 3
529 2004 CONC CURB & GUTTER (TY II) LF     1,900.000 30.68421 2
529 2005 CONC CURB (MONO) (TY I) LF     890.000 8.85393 4
529 2006 CONC CURB (MONO) (TY II) LF     750.000 4.20000 3
529 2007 CONC CURB (DOWEL) LF     6,445.000 10.85027 11
529 2086 CONC CURB (DOWEL) (SLOTTED) LF     165.000 32.00000 1
530 2007 DRIVEWAYS (CONC) EA     1.000 5,800.00000 1
530 2057 TURNOUTS (RAP) SY     21,540.000 10.00000 1
531 2004 CONC SIDEWALKS (6") SY     137.000 54.68978 3
531 2005 CURB RAMPS (TY 1) EA     7.000 950.00000 4
531 2010 CURB RAMPS (TY 7) EA     7.000 1,164.28571 5
531 2011 CURB RAMPS (TY 8) EA     2.000 1,400.00000 1
531 2012 CURB RAMPS (TY 9) EA     2.000 1,400.00000 1
531 2015 CONC SIDEWLKS (4") SY     920.000 45.32609 5
531 2017 CURB RAMPS (TY 21) EA     2.000 1,400.00000 1
531 2022 CURB RAMPS (TY 7) (MOD) EA     1.000 2,000.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     31,070.000 0.25000 1
536 2002 CONC MEDIAN SY     46.000 75.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     2,113.000 22.47515 8
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     500.000 21.00000 1
540 2005 TERMINAL ANCHOR SECTION EA     18.000 47.50000 3
540 2007 MTL W - BEAM GD FEN ADJUSTMENT LF     200.000 3.50000 2
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     88.000 1,392.04545 12
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF     625.000 17.20000 2
540 2036 DRIVEWAY TERMINAL ANCHOR SECTION EA     1.000 1,200.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     1.000 1,400.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     3,348.000 2.65771 11
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     46.000 53.65217 12
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     18.000 2,094.44444 5
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     10.000 350.00000 2
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     11.000 154.54545 3
544 2006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     19.000 2,418.42105 5
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     2.000 2,800.00000 1
545 2003 CRASH CUSH ATTEN (REMOVE) EA     2.000 300.00000 1
545 2007 CRASH CUSH ATTEN (INSTL) (TRACC) EA     2.000 7,500.00000 1
545 2022 CRASH CUSH ATTEN (INSTL) (REACT) (N) EA     1.000 22,150.00000 1
545 2026 CRASH CUSH ATTEN (MOVE & RESET) (REACT) (W EA     16.000 506.25000 2
545 2033 CRASH CUSH ATTEN (REMOVE) (QUAD) (W) EA     5.000 140.00000 2
545 2064 CRASH CUSH ATTEN (MOVE & RESET) (SMTC) (N EA     1.000 500.00000 1
545 2065 CRASH CUSH ATTEN (REMOVE) (SMTC) (N) EA     1.000 400.00000 1
545 2081 CRASH CUSH ATT (INSTAL) (TAU - II) (N) (TL - 2 EA     1.000 15,000.00000 1
550 2001 CHAIN LINK FENCE (INSTALL) (6') LF     637.000 13.41287 3
550 2002 CHAIN LINK FENCE (REPAIR) (6') LF     1,062.000 12.00000 5
550 2003 CHAIN LINK FENCE (REMOVE) LF     1,287.000 1.31080 5
550 2004 GATE (INSTALL) (DOUBLE) (6' X 14') EA     2.000 380.00000 2
550 2005 GATE (REPAIR) (DOUBLE) (6' X 14') EA     2.000 380.00000 2
550 2006 GATE (REMOVE) EA     2.000 88.00000 2
550 2007 GATE (INSTALL) (SINGLE) (6' X 24') EA     2.000 505.00000 2
550 2009 CHAIN LINK FENCE (INSTALL) (4') LF     25.000 5.00000 1
550 2013 GATE (INSTALL) (DOUBLE) (6'X16') EA     1.000 10.00000 1
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA     37.000 180.00000 1
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA     89.000 375.00000 1
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     340.000 120.00000 1