Monthly State Let Construction Report For Houston District As Of May 11, 2015 Page 4 Of 12

Last Update: Monday, May 11, 2015
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10 | page 11 | page 12

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyGALVESTON
Highway SH 146
From AT FM 646
To .
CSJ 0389-06-103
Proj ID STP 2015(244)HES
Work Type IMPROVE TS
 
0.652 369995.94 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-10-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 63
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0389-06-103
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10143005
Totals 369995.94 0.00 0.00 0.0

CountyHARRIS
Highway SH 146
From AT FRED HARTMAN BRIDGE
To .
CSJ 0389-12-090
Proj ID NH 1402(100)
Work Type STAY CABLE MAINTENANCE
 
0.001 5139060.00 1106647.31 4923202.90 95.7
Work Order 09-22-14
Work Began 12-01-14
Work Completed  
Time Computed 11-21-14
Contract Working Days 225
Addl Days Granted 0
Working Days Charged 149
Percent Time Used 66
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0389-12-090
LONESTAR TRAFFIC SAFETY, LLC (0.46%)
ALPIN TECHNIK UND INGENIEURSERVICE GMBH( 62.87%)
PURE TECHNOLOGIES(1.51%)
Contract # 08143030
Totals 5139060.00 1106647.31 4923202.90 95.7

CountyHARRIS
Highway SH 146
From 0.19 MILES SOUTH OF WEST MAIN
To 0.37 MILES SOUTH OF WEST TEXAS
CSJ 0389-13-057
Proj ID NH 2015(158)
Work Type MILL & O / L
 
1.130 224351.11 0.00 0.00 0.0
Work Order 10-14-14
Work Began 00-00-00
Work Completed  
Time Computed 12-13-14
Contract Working Days 30
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0389-13-057
LONESTAR TRAFFIC SAFETY, LLC (1.00%)
BATTERSON,LLP( 17.29%)
Contract # 09143010
Totals 224351.11 0.00 0.00 0.0

CountyWALLER
Highway FM 1488
From BU 290H
To FM 1098
CSJ 0409-03-011
Proj ID STP 2014(611)
Work Type SL CT, W / THIN O / L & PV MRKS
 
19.334 4201121.96 0.00 4149297.31 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-20-14
Work Began 07-14-14
Work Completed 03-02-15
Time Computed 07-14-14
Contract Working Days 52
Addl Days Granted 0
Working Days Charged 44
Percent Time Used 84
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0409-03-011
WATERS CONSTRUCTION CO., INC.( 24.43%)
BATTERSON,LLP(5.25%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.21%)
C PAVE, INC. (0.71%)
Contract # 04143240
Totals 4201121.96 0.00 4149297.31 100.0

CountyGALVESTON
Highway IH 45
From AT SPUR 342
To .
CSJ 0500-01-143
Proj ID STP 2015(703)HES
Work Type TS IMPRVMTS
 
0.250 259722.30 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-09-15
Work Began 00-00-00
Work Completed  
Time Computed 08-08-15
Contract Working Days 48
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0500-01-143
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03153013
Totals 259722.30 0.00 0.00 0.0

CountyHARRIS
Highway IH 45
From 0.4808 MILES SOUTH OF EL DORADO
To SOUTH OF MEDICAL CENTER DRIVE
CSJ 0500-03-042
Proj ID NH 2013(163)
Work Type GR, WIDEN STRS & RECONSTR PV
 
2.180 92660504.64 1521349.55 39825787.71 42.9
CountyHARRIS
Highway IH 45
From 0.4808 MILES SOUTH OF EL DORADO
To MEDICAL CENTER DRIVE
CSJ 0500-03-546
Proj ID RW 500-3-546
Work Type ROW ACQUISITION, RELO & UTILITIES
 
5.530 627780.60 0.00 634967.55 99.9
Work Order 12-12-12
Work Began 12-17-12
Work Completed  
Time Computed 12-17-12
Contract Working Days 1,125
Addl Days Granted 63
Working Days Charged 532
Percent Time Used 44
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-042
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.64%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.59%)
ESSARY, HART & MACWILIAM,INC.(8.94%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.25%)
SCOTT DERR PAINTING CO, LLC(0.03%)
INTERSTATE BARRICADES & MARKINGS, INC. (0.78%)
CREACOM, INC.(4.12%)
BASE CONSTRUCTION, L.L.P.( 12.36%)
BORTUNCO (0.26%)
Contract # 11123001
Totals 93288285.24 1521349.55 40460755.26 43.3

CountyHARRIS
Highway IH 45
From IH 45 NB AT WHITE OAK BAYOU
To .
CSJ 0500-03-044
Proj ID BR 2014(952)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.467 19356558.14 698068.80 3474542.77 17.9
CountyHARRIS
Highway IH 45
From IH 45 NB AT WHITE OAK BAYOU
To .
CSJ 0500-03-589
Proj ID ROW 500-3-589
Work Type ACQUISITION AND UTILITY ADJUSTMENTS
 
0.466 281265.00 0.00 0.00 0.0
Work Order 09-30-14
Work Began 01-21-15
Work Completed  
Time Computed 10-16-14
Contract Working Days 575
Addl Days Granted 0
Working Days Charged 28
Percent Time Used 4
Contractor(s)
BALFOUR BEATTY INFRASTRUCTURE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-044
PROFESSIONAL TRAFFIC CONTROL, LLC(0.28%)
EROSION CONTROL, INC.(0.34%)
GMJ PAVING CO. (0.25%)
THIRD COAST SERVICES LLC (0.35%)
APCON SERVICES, LLC(0.32%)
MESA ROD BUSTERS, INC. (6.69%)
RDI FOUNDATION DRILLING(9.31%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.10%)
WEBBER BARRIER SERVICES, LLC.(2.07%)
SOUTHERN CRUSHED CONCRETE LLC(0.25%)
SCOTT DERR PAINTING CO, LLC(0.25%)
HOUSTON SAWING & DRILLING(0.09%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.01%)
T CONSTRUCTION L.L.C.(0.97%)
GIBSON & ASSOCIATES, INC.(5.96%)
CPAVE, INC.(0.25%)
Contract # 07143201
Totals 19637823.14 698068.80 3474542.77 17.6

CountyHARRIS
Highway IH 45
From NYACK ROAD
To 0.7881 MILES SOUTH OF FM 1959
CSJ 0500-03-462
Proj ID C 500-3-462
Work Type GR, STRS, BASE, AND PAVE
 
5.188 77483150.88 690042.85 60521915.87 77.5
Work Order 06-15-11
Work Began 06-17-11
Work Completed  
Time Computed 06-17-11
Contract Working Days 1,135
Addl Days Granted 104
Working Days Charged 824
Percent Time Used 66
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-462
BASE CONSTRUCTION, L.L.P.( 11.55%)
DORAN STEEL, INC.( 11.03%)
INTERSTATE BARRICADES & MARKINGS, INC. (1.06%)
CREACOM, INC.(4.33%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.59%)
WEST TEXAS RUMBLE STRIP(0.00%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.58%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.33%)
SCOTT DERR PAINTING CO (0.23%)
MAGNUM TUNNELING, LLC(0.05%)
FOSTER FENCE, LTD. (0.05%)
WESTCO GROUNDS MAINTENANCE CO., INC. (0.88%)
VAQUERO CONSTRUCTION, INC. (1.21%)
Contract # 05113210
Totals 77483150.88 690042.85 60521915.87 77.5

CountyHARRIS
Highway IH 45
From IH 10
To IH 610 NORTH LOOP
CSJ 0500-03-567
Proj ID IM 0451(347)
Work Type MILL & O / L
 
2.606 5091079.99 0.00 3234921.95 63.6
Work Order 06-03-14
Work Began 09-15-14
Work Completed  
Time Computed 08-02-14
Contract Working Days 150
Addl Days Granted 0
Working Days Charged 154
Percent Time Used 102
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-567
BATTERSON,LLP(3.87%)
MAIN LANE INDUSTRIES, LTD. ( 37.85%)
R & A TRANSPORT, INC.(7.24%)
THIRD COAST SERVICES LLC (0.25%)
Contract # 04143217
Totals 5091079.99 0.00 3234921.95 63.6

CountyHARRIS
Highway IH 45
From SP 5
To US 59
CSJ 0500-03-572
Proj ID CM 1402(183)
Work Type TRANSPORTATION MANAGEMENT SYSTEM
 
1.640 28293442.99 0.00 167130.29 0.5
CountyHARRIS
Highway IH 45
From SP 5
To US 59
CSJ 0500-03-579
Proj ID RW 500-3-579
Work Type ACQ., RELOC., & ADJ. OF UTILITIES
 
1.853 175446.41 0.00 0.00 0.0
Work Order 12-04-14
Work Began 00-00-00
Work Completed  
Time Computed 02-02-15
Contract Working Days 500
Addl Days Granted 0
Working Days Charged 24
Percent Time Used 4
Contractor(s)
TRADECO INFRAESTRUCTURA, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-572
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09143002
Totals 28468889.40 0.00 167130.29 0.5

CountyHARRIS
Highway IH 45
From AT IH 610 S
To .
CSJ 0500-03-573
Proj ID IM 0451(346)
Work Type CONSTRUCT DIRECT CONNECTOR
 
3.036 24062148.06 0.00 142500.00 0.5
Work Order 05-06-14
Work Began 00-00-00
Work Completed  
Time Computed 01-31-15
Contract Working Days 595
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TRADECO INFRAESTRUCTURA, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-573
PROFESSIONAL TRAFFIC CONTROL, LLC(0.00%)
Contract # 02143201
Totals 24062148.06 0.00 142500.00 0.5

CountyHARRIS
Highway IH 45
From AT IH 610 E
To .
CSJ 0500-03-574
Proj ID CM 2013(984)
Work Type CONSTRUCT DIRECT CONNECTOR
 
2.192 48776267.33 0.00 4545136.70 9.3
Work Order 03-04-14
Work Began 06-23-14
Work Completed  
Time Computed 05-03-14
Contract Working Days 674
Addl Days Granted 0
Working Days Charged 286
Percent Time Used 42
Contractor(s)
TRADECO INFRAESTRUCTURA, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-574
PROFESSIONAL TRAFFIC CONTROL, LLC(0.17%)
TRAF-TEX, INC. (5.96%)
ODUM SERVICES, L.P.(0.68%)
TEXACLEAN SERVICES, LLC(0.04%)
MESA ROD BUSTERS, INC. (9.02%)
SPECIALTY DRILLING, LTD. (0.78%)
DIGGER FOUNDATION DRILLING INC.(0.01%)
Contract # 10133001
Totals 48776267.33 0.00 4545136.70 9.3

CountyHARRIS
Highway IH 45
From .112 MI N OF DIXIE FARM RD
To 1.04 MI S OF FM 2351
CSJ 0500-03-575
Proj ID NH 2015(246)
Work Type HIGH MAST ILLUMINATION
 
2.652 1176661.68 0.00 0.00 0.0
Work Order 03-12-15
Work Began 00-00-00
Work Completed  
Time Computed 03-28-15
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ALLSTATE SIGNAL & CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-575
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02153209
Totals 1176661.68 0.00 0.00 0.0

CountyHARRIS
Highway IH 45
From AT SHEPHERD
To .
CSJ 0500-03-577
Proj ID C 500-3-577
Work Type TMS IMPRVMTS CONT NB & SB DCS
 
4.549 24847758.29 639175.32 22227475.84 89.4
Work Order 07-08-13
Work Began 01-06-14
Work Completed  
Time Computed 01-04-14
Contract Working Days 449
Addl Days Granted 0
Working Days Charged 390
Percent Time Used 86
Contractor(s)
WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-577
SOUTHERN CRUSHED CONCRETE LLC(0.72%)
THIRD COAST SERVICES LLC (6.32%)
PROFESSIONAL TRAFFIC CONTROL, LLC(0.91%)
GMJ PAVING CO. (0.75%)
LANDSCAPE CONTRACTING AND IRRIGATION, INC. (0.18%)
WEBBER BARRIER SERVICES, LLC.(1.48%)
NORTHWEST MATERIALS(0.03%)
SPECIALTY DRILLING, LTD. (0.08%)
RDI FOUNDATION DRILLING(5.77%)
TEXAS CLEARING AND LEVELING(0.09%)
VALLEY PLACERS, LLC(0.24%)
TEXAS HIGHWAY WALLS(9.96%)
CHOCTAW ERECTORS, INC. (2.97%)
PETERSON CONTRACTORS, INC. (0.32%)
PRIMATE CONSTRUCTION, INC. (0.23%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (2.40%)
MESA ROD BUSTERS, INC. (5.08%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.23%)
SCOTT DERR PAINTING CO, LLC(0.48%)
Contract # 02133201
Totals 24847758.29 639175.32 22227475.84 89.4

CountyHARRIS
Highway IH 45
From MEMORIAL DRIVE
To IH-10
CSJ 0500-03-586
Proj ID NH 2014(993)
Work Type CLEAN AND PAINT STEEL
 
0.944 3918000.00 403365.00 3718010.00 94.8
Work Order 08-29-14
Work Began 10-27-14
Work Completed  
Time Computed 10-27-14
Contract Working Days 336
Addl Days Granted 0
Working Days Charged 183
Percent Time Used 54
Contractor(s)
SAFFO CONTRACTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0500-03-586
CEKRA INC. ( 35.22%)
Contract # 07143046
Totals 3918000.00 403365.00 3718010.00 94.8

CountyGALVESTON
Highway IH 45
From CALDER
To FM 646
CSJ 0500-04-122
Proj ID CC 500-4-122
Work Type GR, STRS, BASE AND PAVE
 
1.629 2055734.30 4962.77 1945612.63 96.4
Work Order 02-25-14
Work Began 04-21-14
Work Completed  
Time Computed 04-21-14
Contract Working Days 91
Addl Days Granted 0
Working Days Charged 139
Percent Time Used 152
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0500-04-122
SOUTHERN CRUSHED CONCRETE LLC(2.51%)
LONE STAR TRAFFIC SERVICE, INC.(0.41%)
TRAF-TEX, INC. (9.13%)
JMHP, INC. (1.15%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(3.42%)
REGIONAL TRAFFIC SERVICES LLC(1.51%)
MVA FINE CURBS LLC (0.10%)
A-1 CONSTRUCTION SERVICES(1.24%)
Contract # 01143002
Totals 2055734.30 4962.77 1945612.63 96.4

CountyGALVESTON
Highway IH 45
From FM 518
To FM 517
CSJ 0500-04-126
Proj ID NH 2015(551)
Work Type TRACKLESS TACK, 1" TOM - F & 1" O / L T
 
4.353 4689018.60 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0500-04-126
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04153232
Totals 4689018.60 0.00 0.00 0.0

CountyGALVESTON
Highway IH 45
From TEXAS CITY WYE
To FM 1764 (NB ML ONLY)
CSJ 0500-04-127
Proj ID NH 2015(695)
Work Type SC, CAM & TOM
 
7.383 4583510.76 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 105
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0500-04-127
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04153013
Totals 4583510.76 0.00 0.00 0.0

CountyGALVESTON
Highway IH 45
From FM 1764
To TO TEXAS CITY WYE (SBML ONLY)
CSJ 0500-04-129
Proj ID NH 2015(694)
Work Type CAM & TOM O / L
 
7.825 4920504.92 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0500-04-129
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04153217
Totals 4920504.92 0.00 0.00 0.0

CountyHARRIS
Highway SH 225
From 0.23 MILES WEST OF RICHEY
To 0.36 MILES EAST OF RED BLUFF
CSJ 0502-01-207
Proj ID NH 2014(054)
Work Type CLEAN & SEAL JTS, FULL DPTH REP, MILL
 
1.395 1050533.90 0.00 830429.43 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 02-12-14
Work Began 04-04-14
Work Completed 12-09-14
Time Computed 02-28-14
Contract Working Days 72
Addl Days Granted 32
Working Days Charged 128
Percent Time Used 123
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0502-01-207
UNITED PAVEMENT & MARKINGS, LLC(1.74%)
ISI CONTRACTING, INC.( 40.25%)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.( 27.98%)
UNDER CONSTRUCTION INC.(4.75%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.47%)
Contract # 10133213
Totals 1050533.90 0.00 830429.43 100.0

page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10 | page 11 | page 12