Item No Description Units April 30, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     284.800 3,818.29003 3
100 2006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     92.000 1,500.00000 1
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     11.000 90.91000 1
103 2001 DISPOSAL OF WATER WELLS EA     3.000 6,500.00000 1
104 2001 REMOVING CONC (PAV) SY     31,987.000 10.95167 3
104 2009 REMOVING CONC (RIPRAP) SY     40,662.000 7.67558 4
104 2011 REMOVING CONC (MEDIANS) SY     2,141.000 10.10012 3
104 2013 REMOVING CONC (FOUNDATIONS) SY     17.000 65.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     870.000 11.81161 3
104 2017 REMOVING CONC (DRIVEWAYS) SY     3,797.000 8.89787 5
104 2021 REMOVING CONC (CURB) LF     524.000 2.05000 1
104 2022 REMOVING CONC (CURB AND GUTTER) LF     45,389.000 3.80178 5
104 2024 REMOVING CONC (RETAINING WALLS) SY     184.000 41.00000 1
104 2026 REMOVE CONC (GUTTER) LF     194.000 5.00000 1
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     2,936.000 4.00000 1
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     61.000 18.73770 2
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     36.000 55.00000 1
104 2037 REMOVE CONC (RAIL) LF     70.000 43.00000 1
104 2040 REMOVING CONC (PAVERS) SY     136.000 15.85000 1
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     2,215.000 2.75000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     2,731.000 4.50000 1
106 2001 OBLITERATING ABANDONED ROAD STA     160.460 910.20697 1
106 2002 OBLITERATING ABANDONED ROAD SY     8,440.000 2.65000 1
110 2001 EXCAVATION (ROADWAY) CY     202,326.000 5.87317 5
110 2002 EXCAVATION (CHANNEL) CY     23,438.000 7.35340 2
110 2003 EXCAVATION (SPECIAL) CY     3,900.000 12.39744 3
112 2001 SUBGRADE WIDENING (ORD COMP) STA     8.000 700.00000 1
112 2002 SUBGRADE WIDENING (DENS CONT) STA     135.000 380.37037 2
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     11,532.000 14.00000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     412,152.000 19.26591 5
134 2002 BACKFILL (TY B) STA     224.500 73.74833 3
150 2001 BLADING STA     113.000 75.00000 1
158 2002 SPEC EXCAV WORK (BACKHOE) HR     40.000 140.00000 1
160 2002 FURNISHING AND PLACING TOPSOIL (6") STA     72.750 980.00000 1
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     10,100.000 5.75000 1
160 2005 FURNISHING AND PLACING TOPSOIL CY     6,000.000 10.83900 1
161 2014 COMPOST MANUF TOPSOIL (BOS OR PB) (4") SY     73,486.000 2.00000 1
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY     143,891.000 2.28658 2
162 2002 BLOCK SODDING SY     18,422.000 4.64264 5
162 2003 STRAW OR HAY MULCH SY     135.000 1.10000 1
164 2013 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY SY     24,800.000 1.07867 2
164 2025 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) SY     242,760.000 .22293 3
164 2037 DRILL SEEDING (PERM) (URBAN) (SANDY) SY     165,845.000 .11710 2
164 2038 DRILL SEEDING (PERM) (URBAN) (SANDY) AC     18.240 520.00000 1
164 2041 DRILL SEEDING (TEMP) (WARM) SY     19,676.000 1.20000 1
164 2042 DRILL SEEDING (TEMP) (WARM) AC     8.020 520.00000 1
164 2043 DRILL SEEDING (TEMP) (COOL) SY     19,676.000 1.20000 1
164 2044 DRILL SEEDING (TEMP) (COOL) AC     8.020 520.00000 1
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY     168,040.000 .11688 2
164 2053 DRILL SEEDING (TEMP) (WARM OR COOL) AC     8.300 369.97952 1
166 2001 FERTILIZER AC     2.100 440.00000 1
168 2001 VEGETATIVE WATERING MG     8,025.000 15.99942 6
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     11,000.000 1.68000 1
170 2001 IRRIGATION SYSTEM LS     14.000 9,821.42857 3
192 2015 LANDSCAPE EDGE LF     2,160.000 6.45000 1
192 2017 VEGETATION BARRIER SY     1,000.000 5.05000 1
192 2031 PLANT MATERIAL (5 GAL) (SHRUB) EA     66.000 56.00000 1
192 2044 PLANT MATERIAL (MIN 2" CAL) (B & B) EA     41.000 560.00000 2
192 2046 PLANT MATERIAL (MIN 3" CAL) (B & B) EA     108.000 385.00000 1
193 2001 PLANT MAINTENANCE MO     12.000 250.00000 1