AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LUFKIN DISTRICT

Last Update: Tuesday, July 11, 2017
ITEMS 204 6003 TO 275 6080
ItemsItemsBid Code Range
0100 - 0192
0204 - 0275
0310 - 0354
0400 - 0496
0500 - 0560
0610 - 0688
0752 - 0752
1009 - 1009
5003 - 5003
6001 - 6058
204 6003 - 275 6080
Item NoDescriptionUnitsJune 30, 2017Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
204 6003SPRINKLING (DUST CONTROL)MG  1,246.500.057333
247 6061FL BS (CMP IN PLC)(TYA GR1-2) (6")SY  23,513.00022.5657610
247 6121FL BS (RDWY DEL) (TY A GR 1-2)TON48,532.00040.7700084,515.20038.778674
247 6133FL BS (RDWY DEL) (TY D GR 1-2)TON  39,284.00040.580012
260 6002LIME (HYDRATED LIME (SLURRY))TON  951.000185.000001
260 6011LIME TRT (EXST MATL) (12")SY  40,472.0003.000001
275 6001CEMENTTON1,960.000136.050005,824.000137.682355
275 6005CEMENT TREAT (EXIST MATL)(12")SY6,035.0001.850006,035.0001.850001
275 6023CEMENT TREAT(MX EXST MTL & NW BS)(12")SY  152,583.0002.836382
275 6054CEMENT TREAT (NEW BASE 14")SY30,400.0002.4800035,251.0002.455232
275 6065CEM TRT(MX EXST MTL & NEW BS)(14")SY79,179.0003.09000127,237.0003.433712
275 6080CEMENT TREAT (SUBGRADE)(12")SY  8,092.0001.500001