AVERAGE LOW BID UNIT PRICE - MAINTENANCE - LUFKIN DISTRICT

Last Update: Monday, June 2, 2014
ITEMS 712 2002 TO 776 2035
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0340
0400 - 0496
0500 - 0545
0610 - 0690
0712 - 0776
1122 - 1138
3224 - 3267
6007 - 6044
7126 - 7210
8835 - 8835
712 2002 - 776 2035
Item No Description Units May 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     74.000 675.00000 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,106.530 364.41942 2
730 2002 FULL - WIDTH MOWING AC     50,575.000 20.16175 9
730 2003 SPOT MOWING AC     350.000 33.28714 5
734 2001 LITTER REMOVAL AC     31,367.000 8.36377 9
752 2020 TREE TRIMMING / BRUSH REMOVAL MI 5.000 1,800.00000 143.400 1,698.38215 5
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     5.000 4,500.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA 3,000.000 42.83333 18,725.000 40.95995 12
752 2023 TREE REMOVAL (12" - 18" DIA) EA 1,400.000 60.00000 8,475.000 58.78938 12
752 2024 TREE REMOVAL (18" - 24" DIA) EA 500.000 90.00000 4,275.000 103.96140 12
752 2025 TREE REMOVAL (24" - 30" DIA) EA 300.000 168.33333 2,367.000 167.19265 12
752 2026 TREE REMOVAL (30" - 36" DIA) EA 170.000 246.76471 1,020.000 268.05392 12
752 2027 TREE REMOVAL (36" - 42" DIA) EA 50.000 400.00000 330.000 416.48182 12
752 2028 TREE REMOVAL (42" - 48" DIA) EA 15.000 638.33333 95.000 408.20474 12
752 2029 TREE REMOVAL (48" - 60" DIA) EA 10.000 375.50000 63.000 530.26508 11
752 2030 TREE REMOVAL (60" - 72" DIA) EA 5.000 1.00000 22.000 477.59091 5
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF 303,360.000 1.25000 1,774,213.000 1.42426 17
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 8,000.000 12.50000 16,250.000 13.34923 9
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 450.000 5.00000 550.000 5.90909 2
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 325.000 4.69231 450.000 6.33333 6
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 650.000 14.61538 2,800.000 11.00893 10
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 80.000 49.68750 390.000 42.50000 10
770 2006 REALIGN POSTS EA 210.000 16.42857 445.000 14.15730 8
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA 50.000 3.40000 175.000 4.02857 8
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 50.000 3.40000 173.000 11.18497 9
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 31.000 2,422.58065 168.000 2,347.02381 10
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 38.000 892.10526 86.000 684.88372 8
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 1,750.000 29.55429 3,075.000 27.63252 9
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 165.000 81.81818 285.000 81.57895 9
770 2014 REPAIR STEEL POST WITH BASE PLATE EA 70.000 8.00000 243.000 35.98765 10
770 2022 REM & RESET SGT IMPACT HEAD EA 33.000 25.00000 143.000 75.20979 9
770 2023 REPLACE SGT OBJECT MARKER EA 30.000 9.16667 55.000 31.81818 7
770 2024 REPLACE SGT CABLE ANCHOR EA 25.000 1.00000 50.000 1.30100 6
770 2025 REPLACE SGT CABLE ASSEMBLY EA 30.000 17.50000 55.000 23.36364 7
770 2026 REPLACE SGT STRUT EA 15.000 1.00000 40.000 0.87625 6
770 2027 REMOVE & REPLACE BLOCKOUT EA 135.000 34.92741 1,505.000 4.54498 10
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF 150.000 15.82000 5,175.000 11.94164 9
770 2031 INSTALL BLOCKOUT EA 30.000 23.76000 80.000 22.66000 5
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 100.000 19.24000 100.000 19.24000 1
770 2040 RAISE RAIL ELEMENT LF 200.000 8.00000 200.000 8.00000 1
774 2006 REPAIR (TRACC) EA 1.000 3,000.00000 1.000 3,000.00000 1
774 2007 REPAIR (TRACC) LF 50.000 200.00000 50.000 200.00000 1
774 2011 REPAIR (CATCB - FRNT SECT) EA 1.000 1,500.00000 1.000 1,500.00000 1
774 2012 REPAIR (CATCB - REAR SECT) EA 1.000 500.00000 1.000 500.00000 1
774 2015 REPAIR (NARROW QUAD) EA     2.000 500.00000 1
774 2017 REPAIR (WIDE QUAD) EA 4.000 250.50000 10.000 282.20000 5
774 2028 REPAIR (QUAD) (N) (BAY) EA     6.000 10.00000 1
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF 50.000 14.00000 50.000 14.00000 1
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF 300.000 13.50000 850.000 17.11765 8
776 2020 REPAIR (TY T101RC) LF 50.000 49.50000 125.000 45.80000 5
776 2034 REPAIR (W - BEAM, TUBE & SPLICE - T101 RAIL) LF 200.000 20.00000 300.000 16.66667 2
776 2035 REPAIR (W - BEAM - T101 RAIL) LF 200.000 14.00000 300.000 12.66667 2