| Item No |
Description |
Units |
March 31, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 712 2005 |
JT / CRCK SEAL (RUBBER - ASPHALT) |
LMI |
|
|
596.530 |
334.00000 |
1 |
| 730 2002 |
FULL - WIDTH MOWING |
AC |
|
|
60,310.980 |
22.21376 |
12 |
| 730 2003 |
SPOT MOWING |
AC |
|
|
450.000 |
8.39444 |
7 |
| 734 2001 |
LITTER REMOVAL |
AC |
|
|
36,279.100 |
8.25662 |
12 |
| 752 2020 |
TREE TRIMMING / BRUSH REMOVAL |
MI |
|
|
60.000 |
1,250.00000 |
1 |
| 752 2022 |
TREE REMOVAL (4" - 12" DIA) |
EA |
|
|
12,830.000 |
38.47292 |
8 |
| 752 2023 |
TREE REMOVAL (12" - 18" DIA) |
EA |
|
|
5,965.000 |
46.32565 |
8 |
| 752 2024 |
TREE REMOVAL (18" - 24" DIA) |
EA |
|
|
3,840.000 |
64.82194 |
8 |
| 752 2025 |
TREE REMOVAL (24" - 30" DIA) |
EA |
|
|
2,260.000 |
86.27212 |
8 |
| 752 2026 |
TREE REMOVAL (30" - 36" DIA) |
EA |
|
|
1,125.000 |
82.63556 |
8 |
| 752 2027 |
TREE REMOVAL (36" - 42" DIA) |
EA |
|
|
460.000 |
140.37826 |
8 |
| 752 2028 |
TREE REMOVAL (42" - 48" DIA) |
EA |
|
|
148.000 |
166.11115 |
7 |
| 752 2029 |
TREE REMOVAL (48" - 60" DIA) |
EA |
|
|
171.000 |
210.53626 |
8 |
| 752 2030 |
TREE REMOVAL (60" - 72" DIA) |
EA |
|
|
95.000 |
290.42105 |
3 |
| 760 2001 |
DITCH CLEANING AND RESHAPING (FOOT) |
LF |
|
|
486,060.000 |
1.49633 |
5 |
| 770 2001 |
REPAIR RAIL ELEMENT (W - BEAM) |
LF |
|
|
10,250.000 |
14.15854 |
5 |
| 770 2002 |
REPAIR RAIL ELEMENT (THRIE - BEAM) |
LF |
|
|
550.000 |
7.36364 |
2 |
| 770 2003 |
REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) |
LF |
|
|
375.000 |
8.66667 |
3 |
| 770 2004 |
REM / REPL TIMBER / STL POST W / O CONC FND |
EA |
|
|
2,100.000 |
8.66667 |
5 |
| 770 2005 |
REM / REPL TIMBER / STL POST W / CONC FND |
EA |
|
|
280.000 |
41.25000 |
5 |
| 770 2006 |
REALIGN POSTS |
EA |
|
|
325.000 |
11.53846 |
4 |
| 770 2007 |
REPAIR OF TERMINAL ANCHORS POSTS |
EA |
|
|
95.000 |
14.26316 |
4 |
| 770 2008 |
REPLACE TERMINAL ANCHOR POSTS |
EA |
|
|
98.000 |
25.35714 |
5 |
| 770 2009 |
REMOVE GDRAIL END TRT / REPL WITH SGT |
EA |
|
|
96.000 |
2,301.04167 |
5 |
| 770 2010 |
REPL SINGLE GDRAIL TERM IMPACT HEAD |
EA |
|
|
35.000 |
671.42857 |
3 |
| 770 2011 |
REPLACE SINGLE GDRAIL TERMINAL RAIL |
LF |
|
|
2,325.000 |
17.09677 |
4 |
| 770 2012 |
REPLACE SINGLE GDRAIL TERMINAL POST |
EA |
|
|
225.000 |
59.33333 |
5 |
| 770 2014 |
REPAIR STEEL POST WITH BASE PLATE |
EA |
|
|
168.000 |
65.98214 |
5 |
| 770 2022 |
REM & RESET SGT IMPACT HEAD |
EA |
|
|
104.000 |
94.51923 |
5 |
| 770 2023 |
REPLACE SGT OBJECT MARKER |
EA |
|
|
35.000 |
9.14286 |
3 |
| 770 2024 |
REPLACE SGT CABLE ANCHOR |
EA |
|
|
35.000 |
6.57143 |
3 |
| 770 2025 |
REPLACE SGT CABLE ASSEMBLY |
EA |
|
|
35.000 |
20.71429 |
3 |
| 770 2026 |
REPLACE SGT STRUT |
EA |
|
|
25.000 |
8.80000 |
3 |
| 770 2027 |
REMOVE & REPLACE BLOCKOUT |
EA |
|
|
1,285.000 |
2.54864 |
5 |
| 770 2029 |
REPAIR RAIL ELEMENT (W - BEAM FURNISHED) |
LF |
|
|
2,925.000 |
11.70085 |
3 |
| 770 2031 |
INSTALL BLOCKOUT |
EA |
|
|
20.000 |
25.00000 |
1 |
| 770 2035 |
REPAIR RAIL ELEMENT (CURVED RAIL) |
LF |
|
|
100.000 |
15.00000 |
1 |
| 770 2040 |
RAISE RAIL ELEMENT |
LF |
|
|
200.000 |
8.00000 |
1 |
| 774 2006 |
REPAIR (TRACC) |
EA |
|
|
1.000 |
4,000.00000 |
1 |
| 774 2007 |
REPAIR (TRACC) |
LF |
|
|
50.000 |
190.00000 |
1 |
| 774 2011 |
REPAIR (CATCB - FRNT SECT) |
EA |
|
|
1.000 |
2,000.00000 |
1 |
| 774 2012 |
REPAIR (CATCB - REAR SECT) |
EA |
|
|
1.000 |
500.00000 |
1 |
| 774 2015 |
REPAIR (NARROW QUAD) |
EA |
|
|
2.000 |
50.00000 |
1 |
| 774 2017 |
REPAIR (WIDE QUAD) |
EA |
|
|
2.000 |
400.00000 |
1 |
| 774 2028 |
REPAIR (QUAD) (N) (BAY) |
EA |
|
|
6.000 |
100.00000 |
1 |
| 776 2001 |
REPAIR (STEEL POST W / W - BEAM - T101) |
LF |
|
|
50.000 |
30.00000 |
1 |
| 776 2004 |
REPAIR (STL POST W / DOUBLED W - BEAMS - T6) |
LF |
|
|
650.000 |
15.76923 |
4 |
| 776 2020 |
REPAIR (TY T101RC) |
LF |
|
|
25.000 |
40.00000 |
1 |
| 776 2034 |
REPAIR (W - BEAM, TUBE & SPLICE - T101 RAIL) |
LF |
|
|
300.000 |
25.66667 |
2 |
| 776 2035 |
REPAIR (W - BEAM - T101 RAIL) |
LF |
|
|
300.000 |
12.33333 |
2 |