AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LAREDO DISTRICT

Last Update: Thursday, July 14, 2022
ITEMS 216 6001 TO 276 6240
ItemsItemsBid Code Range
0100 - 0164
0216 - 0276
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0785
3042 - 3070
5070 - 5070
6001 - 6257
216 6001 - 276 6240
Item NoDescriptionUnitsMarch 31, 2019Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
216 6001PROOF ROLLINGHR  3,042.14074.481877
247 6041FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POSCY  58,141.00068.750001
247 6060FL BS (CMP IN PLC)(TY E GR 4)(FNAL POSCY  102,469.30026.286882
251 6035REWORK BS MTL (TY C) (6") (DENS CONT)SY  230,321.0001.600001
251 6114REWORK BS MATL (TY B)(10")(OC)SY  223,954.0002.480001
260 6002LIME (HYDRATED LIME (SLURRY))TON  7,763.000171.533232
260 6006LIME TRT (EXST MATL) (6")SY  230,321.0001.250001
260 6016LIME (HYD, COM, OR QK(SLURRY))TON  7,804.000170.000001
260 6079LIME TRT (SUBGRADE)(6")SY  777,870.0002.498072
275 6001CEMENTTON  8,648.510167.111133
275 6035CEMENT TREAT (NEW BASE)(12")SY  170,982.6203.280001
275 6039CEMENT TREAT (EXIST MATL)(DC)(10")SY  227,524.0002.850001
275 6372CEMENT TREAT (NEW BASE)(12")(DC)SY  136,425.2903.210001
276 6238CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(12"SY  178,103.00020.930001
276 6240CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(10"SY  526,611.00011.000001