AVERAGE LOW BID UNIT PRICE - MAINTENANCE - LAREDO DISTRICT

Last Update: Wednesday, April 3, 2013
ITEMS 712 2005 TO 774 2010
Items Items Bid Code Range
0100 - 0134
0216 - 0275
0316 - 0360
0400 - 0496
0500 - 0560
0644 - 0677
0712 - 0774
1122 - 1122
3035 - 3235
5845 - 5845
6195 - 6834
7224 - 7224
8649 - 8652
712 2005 - 774 2010
Item No Description Units March 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     925.000 540.00000 2
730 2001 STRIP MOWING AC     8,274.920 24.75970 5
730 2002 FULL - WIDTH MOWING AC     12,781.200 55.45101 6
730 2056 FULL - WIDTH MOWING - TRACT (1) AC     25,643.560 24.07609 5
734 2001 LITTER REMOVAL AC     5,551.800 43.33333 3
734 2004 LITTER REMOVAL - TRACT (1) AC     1,470.000 13.17000 1
734 2005 LITTER REMOVAL - TRACT (2) AC     1,265.000 13.17000 1
735 2002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     6,666.000 14.10000 1
735 2006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     140.400 14.10000 1
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     6.480 400.00000 1
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     881.630 135.27380 3
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     1,050.630 135.91982 3
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     311.500 134.05095 3
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     90.590 136.12606 3
738 2011 CLEANING / SWEEPING (HANDWORK) SY     12,580.000 0.50000 1
738 2221 DIRECT CONNECTOR CLEAN AND SWEEP (RAMP MI     133.540 134.58844 2
738 2233 CLEANING / SWEEPING (RAISED MEDIAN) MI     177.660 616.66667 3
738 2234 CLEANING / SWEEPING (AREA (INTERSECTION) CYC     12.000 4,666.66667 3
751 2031 PRUNING CYC     3.000 30,000.00000 3
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     30.000 1,450.00000 1
752 2024 TREE REMOVAL (18" - 24" DIA) EA     9.000 2,500.00000 3
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     11,775.000 17.16561 5
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     145.000 8.10345 5
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     132.500 8.39623 5
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     1,420.000 21.12676 5
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     160.000 41.87500 5
770 2006 REALIGN POSTS EA     266.000 15.03759 5
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     18.000 145.00000 5
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     30.000 1,793.33333 5
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     90.000 891.66667 5
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     3,900.000 22.19231 5
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     400.000 55.40000 5
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     50.000 124.00000 5
770 2022 REM & RESET SGT IMPACT HEAD EA     42.000 243.33333 5
770 2023 REPLACE SGT OBJECT MARKER EA     30.000 4.00000 3
770 2024 REPLACE SGT CABLE ANCHOR EA     40.000 5.50000 3
770 2025 REPLACE SGT CABLE ASSEMBLY EA     40.000 5.50000 3
770 2026 REPLACE SGT STRUT EA     35.000 4.85714 3
770 2027 REMOVE & REPLACE BLOCKOUT EA     400.000 5.50000 3
770 2033 INSTALL BLOCKOUT EA     130.000 31.53846 3
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     200.000 27.00000 4
770 2039 REM / REPL TIM / STL POST W CONC FND (FURN EA     2.000 200.00000 1
770 2040 RAISE RAIL ELEMENT LF     400.000 5.50000 3
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA     1.000 5,000.00000 1
774 2010 REPAIR (REACT) EA     2.000 1,000.00000 1