| Item No |
Description |
Units |
March 31, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 712 2005 |
JT / CRCK SEAL (RUBBER - ASPHALT) |
LMI |
|
|
925.000 |
540.00000 |
2 |
| 730 2001 |
STRIP MOWING |
AC |
|
|
8,274.920 |
24.75970 |
5 |
| 730 2002 |
FULL - WIDTH MOWING |
AC |
|
|
12,781.200 |
55.45101 |
6 |
| 730 2056 |
FULL - WIDTH MOWING - TRACT (1) |
AC |
|
|
25,643.560 |
24.07609 |
5 |
| 734 2001 |
LITTER REMOVAL |
AC |
|
|
5,551.800 |
43.33333 |
3 |
| 734 2004 |
LITTER REMOVAL - TRACT (1) |
AC |
|
|
1,470.000 |
13.17000 |
1 |
| 734 2005 |
LITTER REMOVAL - TRACT (2) |
AC |
|
|
1,265.000 |
13.17000 |
1 |
| 735 2002 |
DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES |
MI |
|
|
6,666.000 |
14.10000 |
1 |
| 735 2006 |
DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) |
MI |
|
|
140.400 |
14.10000 |
1 |
| 735 2007 |
DEBRIS REMOVAL (SPOT DEBRIS) |
MI |
|
|
6.480 |
400.00000 |
1 |
| 738 2002 |
CLEANING / SWEEPING (CENTER MEDIAN) |
MI |
|
|
881.630 |
135.27380 |
3 |
| 738 2004 |
CLEANING / SWEEPING (OUTSIDE MAIN LANE) |
MI |
|
|
1,050.630 |
135.91982 |
3 |
| 738 2006 |
CLEANING / SWEEPING (FRONTAGE ROAD) |
MI |
|
|
311.500 |
134.05095 |
3 |
| 738 2008 |
CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) |
MI |
|
|
90.590 |
136.12606 |
3 |
| 738 2011 |
CLEANING / SWEEPING (HANDWORK) |
SY |
|
|
12,580.000 |
0.50000 |
1 |
| 738 2221 |
DIRECT CONNECTOR CLEAN AND SWEEP (RAMP |
MI |
|
|
133.540 |
134.58844 |
2 |
| 738 2233 |
CLEANING / SWEEPING (RAISED MEDIAN) |
MI |
|
|
177.660 |
616.66667 |
3 |
| 738 2234 |
CLEANING / SWEEPING (AREA (INTERSECTION) |
CYC |
|
|
12.000 |
4,666.66667 |
3 |
| 751 2031 |
PRUNING |
CYC |
|
|
3.000 |
30,000.00000 |
3 |
| 752 2020 |
TREE TRIMMING / BRUSH REMOVAL |
MI |
|
|
30.000 |
1,450.00000 |
1 |
| 752 2024 |
TREE REMOVAL (18" - 24" DIA) |
EA |
|
|
9.000 |
2,500.00000 |
3 |
| 770 2001 |
REPAIR RAIL ELEMENT (W - BEAM) |
LF |
|
|
11,775.000 |
17.16561 |
5 |
| 770 2002 |
REPAIR RAIL ELEMENT (THRIE - BEAM) |
LF |
|
|
145.000 |
8.10345 |
5 |
| 770 2003 |
REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) |
LF |
|
|
132.500 |
8.39623 |
5 |
| 770 2004 |
REM / REPL TIMBER / STL POST W / O CONC FND |
EA |
|
|
1,420.000 |
21.12676 |
5 |
| 770 2005 |
REM / REPL TIMBER / STL POST W / CONC FND |
EA |
|
|
160.000 |
41.87500 |
5 |
| 770 2006 |
REALIGN POSTS |
EA |
|
|
266.000 |
15.03759 |
5 |
| 770 2007 |
REPAIR OF TERMINAL ANCHORS POSTS |
EA |
|
|
18.000 |
145.00000 |
5 |
| 770 2009 |
REMOVE GDRAIL END TRT / REPL WITH SGT |
EA |
|
|
30.000 |
1,793.33333 |
5 |
| 770 2010 |
REPL SINGLE GDRAIL TERM IMPACT HEAD |
EA |
|
|
90.000 |
891.66667 |
5 |
| 770 2011 |
REPLACE SINGLE GDRAIL TERMINAL RAIL |
LF |
|
|
3,900.000 |
22.19231 |
5 |
| 770 2012 |
REPLACE SINGLE GDRAIL TERMINAL POST |
EA |
|
|
400.000 |
55.40000 |
5 |
| 770 2014 |
REPAIR STEEL POST WITH BASE PLATE |
EA |
|
|
50.000 |
124.00000 |
5 |
| 770 2022 |
REM & RESET SGT IMPACT HEAD |
EA |
|
|
42.000 |
243.33333 |
5 |
| 770 2023 |
REPLACE SGT OBJECT MARKER |
EA |
|
|
30.000 |
4.00000 |
3 |
| 770 2024 |
REPLACE SGT CABLE ANCHOR |
EA |
|
|
40.000 |
5.50000 |
3 |
| 770 2025 |
REPLACE SGT CABLE ASSEMBLY |
EA |
|
|
40.000 |
5.50000 |
3 |
| 770 2026 |
REPLACE SGT STRUT |
EA |
|
|
35.000 |
4.85714 |
3 |
| 770 2027 |
REMOVE & REPLACE BLOCKOUT |
EA |
|
|
400.000 |
5.50000 |
3 |
| 770 2033 |
INSTALL BLOCKOUT |
EA |
|
|
130.000 |
31.53846 |
3 |
| 770 2035 |
REPAIR RAIL ELEMENT (CURVED RAIL) |
LF |
|
|
200.000 |
27.00000 |
4 |
| 770 2039 |
REM / REPL TIM / STL POST W CONC FND (FURN |
EA |
|
|
2.000 |
200.00000 |
1 |
| 770 2040 |
RAISE RAIL ELEMENT |
LF |
|
|
400.000 |
5.50000 |
3 |
| 774 2003 |
REMOVE AND REPLACE (NARROW REACT 350) |
EA |
|
|
1.000 |
5,000.00000 |
1 |
| 774 2010 |
REPAIR (REACT) |
EA |
|
|
2.000 |
1,000.00000 |
1 |