AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - ODESSA DISTRICT

Last Update: Friday, July 29, 2016
ITEMS 500 6001 TO 560 6012
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0354
0400 - 0496
0500 - 0560
0610 - 0690
0772 - 0778
1004 - 1004
3016 - 3016
5008 - 5014
6001 - 6176
9010 - 9010
500 6001 - 560 6012
Item No Description Units July 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS 1.000 550,000.00000 18.000 531,808.07778 18
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 18.000 5,000.00000 179.000 13,138.85972 18
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     735.000 40.30531 2
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     458.000 42.00000 1
506 6011 ROCK FILTER DAMS (REMOVE) LF     1,193.000 10.99790 2
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     224.000 31.50000 1
506 6024 CONSTRUCTION EXITS (REMOVE) SY     224.000 10.50000 1
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR     50.000 250.00000 1
506 6034 CONSTRUCTION PERIMETER FENCE LF     3,840.000 9.58000 1
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF     550.000 4.73000 1
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 2,700.000 11.50000 44,678.000 9.85179 11
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 2,700.000 2.50000 45,228.000 1.49857 11
508 6001 CONSTRUCTING DETOURS SY     3,939.000 97.05000 1
510 6003 ONE - WAY TRAF CONT (PORT TRAF SIG) MO     4.000 6,500.00000 1
512 6072 PTB (FRN & INSTL) (SGL SLP) (TY 1) OR (STL LF     5,790.000 55.30238 3
512 6074 PTB (MOVE) (SGL SLP) (TY 1) OR (STL) LF     4,110.000 19.64664 3
512 6076 PTB (REMOVE) (SGL SLP) (TY 1) OR (STL) LF     5,790.000 15.64238 3
528 6004 LANDSCAPE PAVERS SY     2,744.000 49.91000 1
528 6006 REMOVE AND RELAY PAVERS SY     2.000 66.00000 1
529 6002 CONC CURB (TY II) LF     33.000 68.35000 1
529 6007 CONC CURB & GUTTER (TY I) LF     4,143.000 57.06000 1
529 6008 CONC CURB & GUTTER (TY II) LF     15,425.000 56.29676 2
530 6004 DRIVEWAYS (CONC) SY     7,207.000 97.72627 2
531 6001 CONC SIDEWALKS (4") SY     1,800.000 102.20000 1
531 6005 CURB RAMPS (TY 2) EA     8.000 4,554.38000 1
531 6018 CURB RAMPS (TY 1) SY     89.000 298.23000 1
531 6019 CURB RAMPS (TY 2) SY     8.000 333.23000 1
531 6023 CURB RAMPS (TY 6) SY     22.000 192.50000 1
531 6024 CURB RAMPS (TY 7) SY     17.000 192.50000 1
531 6030 CURB RAMPS (TY 21) SY     93.000 201.07527 2
531 6031 CURB RAMPS (TY 22) SY     27.000 139.94000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     2,801,488.000 .10671 6
533 6002 RUMBLE STRIPS (CENTERLINE) LF     1,297,137.000 .14654 3
536 6004 CONC DIRECTIONAL ISLAND SY     22.000 301.23000 1
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     20,512.000 32.50188 5
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     36.000 2,112.58000 5
540 6008 MTL BEAM GD FEN TRANS (T101) EA     4.000 1,600.00000 1
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA     17.000 1,374.48235 3
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA     16.000 1,057.67750 3
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     100.000 75.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF     22,638.000 7.00371 6
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     25.000 200.21200 3
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA     14.000 186.74857 2
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA     41.000 2,926.80098 4
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     33.000 441.59212 5
544 6007 GDRAIL END TRT (INSTALL) (HBA POST) EA     4.000 2,640.00000 1
545 6001 CRASH CUSH ATTEN (INSTL) EA     9.000 16,910.27778 3
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     7.000 3,891.67429 3
545 6005 CRASH CUSH ATTEN (REMOVE) EA     9.000 1,488.80000 3
550 6006 GATE (REMOVE) EA     1.000 535.23000 1
552 6001 WIRE FENCE (TY A) LF     3,017.000 10.50000 1
560 6004 MAILBOX INSTALL - S (TWG - POST) TY 2 EA     7.000 575.00000 1
560 6005 MAILBOX INSTALL - D (TWG - POST) TY 2 EA     2.000 575.00000 1
560 6011 MAILBOX INSTALL - S (TWW - POST) TY 4 EA     1.000 220.00000 1
560 6012 MAILBOX INSTALL - D (TWW - POST) TY 4 EA     1.000 247.50000 1