AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PARIS DISTRICT

Last Update: Friday, August 26, 2016
ITEMS 100 6001 TO 193 6007
Items Items Bid Code Range
0100 - 0193
0216 - 0292
0305 - 0360
0400 - 0497
0500 - 0560
0610 - 0686
0721 - 0784
1002 - 1002
4022 - 4053
5001 - 5028
6000 - 6185
100 6001 - 193 6007
Item No Description Units August 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 6001 PREPARING ROW AC     12.840 6,691.91978 1
100 6002 PREPARING ROW STA 174.720 6,314.32051 5,347.210 685.52469 21
100 6004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     4.000 625.00000 2
100 6007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     50.000 206.00000 2
100 6009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     14.000 210.00000 1
100 6013 PREP ROW (TREE) (2" TO 12" DIA) EA     18.000 200.00000 1
104 6001 REMOVING CONC (PAV) SY 11,567.000 8.20000 17,000.000 8.32379 3
104 6009 REMOVING CONC (RIPRAP) SY 1,443.000 7.00000 3,444.000 14.84088 4
104 6011 REMOVING CONC (MEDIANS) SY     160.000 14.10000 2
104 6015 REMOVING CONC (SIDEWALKS) SY     145.000 15.93793 2
104 6017 REMOVING CONC (DRIVEWAYS) SY     11,413.000 16.01875 10
104 6021 REMOVING CONC (CURB) LF     727.000 6.70426 2
104 6022 REMOVING CONC (CURB AND GUTTER) LF     50.000 10.00000 1
104 6023 REMOVING CONC (CTB) LF 2,555.000 20.00000 2,728.000 21.26833 2
104 6028 REMOVING CONC (MISC) SY     525.000 18.00000 1
104 6029 REMOVING CONC (CURB OR CURB & GUTTER) LF     796.000 15.00000 1
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY     86.000 35.00000 1
104 6044 REMOVING CONC (FLUME) SY     13.000 13.00000 1
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY     3,242.000 7.33255 2
105 6021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     5,042.000 3.25000 1
105 6041 REMOVING STAB BASE AND ASPH PAV (8") SY     1,313.000 12.54829 2
105 6073 REMOV STAB BASE AND ASPH PAV (22") SY 12,653.000 15.00000 12,653.000 15.00000 1
105 6074 REMOVING STAB BASE AND ASPH PAV (4") SY     20,541.000 4.34000 1
105 6105 REMOVING STAB BASE AND ASPH PAV (15") SY     6,096.000 10.00000 1
106 6001 OBLITERATING ABANDONED ROAD STA     122.930 1,115.58106 2
110 6001 EXCAVATION (ROADWAY) CY 107,560.000 9.58929 395,634.000 9.60056 16
110 6002 EXCAVATION (CHANNEL) CY     11,909.000 19.95774 10
110 6003 EXCAVATION (SPECIAL) CY     753.000 30.08699 2
112 6001 SUBGRADE WIDENING (ORD COMP) STA     2,922.180 156.72909 9
132 6002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY 68,745.000 14.80000 68,745.000 14.80000 1
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     3,745.000 17.08238 8
132 6004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY 42,894.000 18.00000 291,802.000 7.91144 8
132 6017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY     72.000 53.76000 1
132 6019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     2,973.000 11.47659 5
132 6026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 62,171.000 14.00000 62,171.000 14.00000 1
134 6001 BACKFILL (TY A) STA     820.110 225.15083 3
134 6002 BACKFILL (TY B) STA     3,971.480 164.11301 10
150 6001 BLADING STA     277.280 124.50952 2
152 6001 ROAD GRADER WORK (ORD COMP) STA     3,290.980 166.77809 12
156 6001 BULLDOZER WORK HR     61.000 50.00000 1
158 6002 SPEC EXCAV WORK (BACKHOE) HR     61.000 50.00000 1
160 6001 FURNISHING AND PLACING TOPSOIL (4") STA 81.340 700.00000 763.840 338.12775 2
160 6002 FURNISHING AND PLACING TOPSOIL (6") STA     242.750 550.00000 1
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 104,217.000 1.00000 111,981.000 1.07404 4
160 6005 FURNISHING AND PLACING TOPSOIL CY     11.000 40.00000 1
161 6012 GENERAL USE COMPOST CY     41.000 49.00000 1
162 6002 BLOCK SODDING SY 72,478.000 2.73559 99,759.000 3.33670 6
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 43,527.000 .12000 44,809.000 .13659 2
164 6007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     2,782.000 .69000 1
164 6009 BROADCAST SEED (TEMP) (WARM) SY 21,767.000 .12000 683,768.000 .08617 11
164 6011 BROADCAST SEED (TEMP) (COOL) SY 21,767.000 .12000 694,850.000 .09577 12
164 6013 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY SY     876,620.000 .29660 6
164 6015 STRAW / HAY MLCH SEED (PERM) (RURAL) (CLAY) SY 51,132.000 .30000 1,053,862.000 .23143 7
164 6021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     613,219.000 .28298 4
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     12,534.000 1.49271 5
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY 62,920.000 .24000 581,640.000 .25111 10
164 6031 CELL FBR MLCH SEED (TEMP) (COOL) SY 62,920.000 .24000 576,900.000 .25599 9
168 6001 VEGETATIVE WATERING MG 4,209.000 12.64879 43,140.670 7.56785 25
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     19,173.000 1.16000 1
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     14,967.000 1.14000 1
170 6001 IRRIGATION SYSTEM LS     3.000 46,083.33333 3
180 6001 WILDFLOWER SEEDING AC     6.200 4,400.00000 1
192 6002 PLANT MATERIAL (1 - GAL) EA     271.000 10.00000 1
192 6003 PLANT MATERIAL (3 - GAL) EA     52.000 29.65385 2
192 6004 PLANT MATERIAL (5 - GAL) EA     2,824.000 32.00956 3
192 6014 PLANT SOIL MIX CY     50.000 75.00000 1
192 6015 LANDSCAPE EDGE LF     299.000 10.00000 1
192 6016 PLANT BED PREPARATION SY     3,279.000 22.21744 3
192 6024 PLANT MATERIAL (30 GAL) (TREE) EA     108.000 356.06481 2
192 6025 PLANT MATERIAL (45 GAL) (TREE) EA     18.000 377.77778 2
192 6027 PLANT MATERIAL (100 GAL) (TREE) EA     93.000 1,100.00000 1
192 6032 PLANT MATERIAL (10 GAL) (SHRUB) EA     49.000 180.00000 1
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO     9.000 1,000.00000 1