AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PARIS DISTRICT

Last Update: Friday, July 29, 2016
ITEMS 100 6001 TO 193 6007
Items Items Bid Code Range
0100 - 0193
0216 - 0292
0305 - 0360
0400 - 0497
0500 - 0560
0610 - 0686
0721 - 0784
1002 - 1002
4022 - 4053
5001 - 5028
6000 - 6185
100 6001 - 193 6007
Item No Description Units July 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 6001 PREPARING ROW AC     12.840 6,691.91978 1
100 6002 PREPARING ROW STA 621.410 293.17636 5,929.750 463.00941 21
100 6004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     4.000 625.00000 2
100 6007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA 30.000 210.00000 50.000 206.00000 2
100 6009 PREPARING ROW (TREE) (6" TO 24" DIA) EA 14.000 210.00000 14.000 210.00000 1
100 6013 PREP ROW (TREE) (2" TO 12" DIA) EA     18.000 200.00000 1
104 6001 REMOVING CONC (PAV) SY     8,647.000 12.82930 3
104 6009 REMOVING CONC (RIPRAP) SY     2,001.000 20.49525 3
104 6011 REMOVING CONC (MEDIANS) SY     160.000 14.10000 2
104 6015 REMOVING CONC (SIDEWALKS) SY     145.000 15.93793 2
104 6017 REMOVING CONC (DRIVEWAYS) SY 179.000 25.00000 11,534.000 16.03364 12
104 6021 REMOVING CONC (CURB) LF     727.000 6.70426 2
104 6022 REMOVING CONC (CURB AND GUTTER) LF     50.000 10.00000 1
104 6023 REMOVING CONC (CTB) LF     173.000 40.00000 1
104 6028 REMOVING CONC (MISC) SY     525.000 18.00000 1
104 6029 REMOVING CONC (CURB OR CURB & GUTTER) LF     796.000 15.00000 1
104 6031 REMOVING CONC (HEADWALL) CY     60.000 250.00000 1
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY     86.000 35.00000 1
104 6044 REMOVING CONC (FLUME) SY     13.000 13.00000 1
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY     3,242.000 7.33255 2
105 6021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     5,042.000 3.25000 1
105 6041 REMOVING STAB BASE AND ASPH PAV (8") SY     1,313.000 12.54829 2
105 6074 REMOVING STAB BASE AND ASPH PAV (4") SY     20,541.000 4.34000 1
105 6105 REMOVING STAB BASE AND ASPH PAV (15") SY     6,096.000 10.00000 1
106 6001 OBLITERATING ABANDONED ROAD STA     122.930 1,115.58106 2
110 6001 EXCAVATION (ROADWAY) CY 310.000 12.95484 291,087.400 9.63197 17
110 6002 EXCAVATION (CHANNEL) CY 975.000 27.23692 12,166.000 19.64176 11
110 6003 EXCAVATION (SPECIAL) CY 91.000 58.00000 753.000 30.08699 2
112 6001 SUBGRADE WIDENING (ORD COMP) STA 614.010 206.54159 3,528.920 173.77640 12
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 278.000 34.25000 7,917.000 18.61987 9
132 6004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     248,908.000 6.17289 7
132 6017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY 72.000 53.76000 72.000 53.76000 1
132 6019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY 161.000 39.74130 5,474.700 11.20023 8
134 6001 BACKFILL (TY A) STA     820.110 225.15083 3
134 6002 BACKFILL (TY B) STA 614.010 152.78324 4,522.650 176.35555 12
150 6001 BLADING STA     277.280 124.50952 2
152 6001 ROAD GRADER WORK (ORD COMP) STA 614.010 218.93207 3,911.720 183.15235 16
156 6001 BULLDOZER WORK HR     61.000 50.00000 1
158 6002 SPEC EXCAV WORK (BACKHOE) HR     61.000 50.00000 1
160 6001 FURNISHING AND PLACING TOPSOIL (4") STA     682.500 295.00000 1
160 6002 FURNISHING AND PLACING TOPSOIL (6") STA     242.750 550.00000 1
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 6,407.000 1.87041 7,764.000 2.06784 3
160 6005 FURNISHING AND PLACING TOPSOIL CY     11.000 40.00000 1
161 6012 GENERAL USE COMPOST CY     41.000 49.00000 1
162 6002 BLOCK SODDING SY     41,281.000 4.61704 5
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 1,282.000 .70000 1,282.000 .70000 1
164 6007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     2,782.000 .69000 1
164 6009 BROADCAST SEED (TEMP) (WARM) SY 155,968.000 .12672 702,488.000 .08592 11
164 6011 BROADCAST SEED (TEMP) (COOL) SY 155,968.000 .13651 713,570.000 .09527 12
164 6013 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY SY 128,360.000 .26300 876,620.000 .29660 6
164 6015 STRAW / HAY MLCH SEED (PERM) (RURAL) (CLAY) SY 177,166.000 .25000 1,105,721.000 .23072 8
164 6021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     720,455.000 .27807 5
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY 5,125.000 1.50000 12,534.000 1.49271 5
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY     590,346.000 .25048 12
164 6031 CELL FBR MLCH SEED (TEMP) (COOL) SY     585,606.000 .25711 11
168 6001 VEGETATIVE WATERING MG 7,418.800 2.81198 40,549.670 7.59316 27
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     19,173.000 1.16000 1
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     14,967.000 1.14000 1
170 6001 IRRIGATION SYSTEM LS     3.000 46,083.33333 3
180 6001 WILDFLOWER SEEDING AC     6.200 4,400.00000 1
192 6002 PLANT MATERIAL (1 - GAL) EA     271.000 10.00000 1
192 6003 PLANT MATERIAL (3 - GAL) EA     52.000 29.65385 2
192 6004 PLANT MATERIAL (5 - GAL) EA     2,824.000 32.00956 3
192 6014 PLANT SOIL MIX CY     50.000 75.00000 1
192 6015 LANDSCAPE EDGE LF     299.000 10.00000 1
192 6016 PLANT BED PREPARATION SY     3,279.000 22.21744 3
192 6024 PLANT MATERIAL (30 GAL) (TREE) EA     108.000 356.06481 2
192 6025 PLANT MATERIAL (45 GAL) (TREE) EA     18.000 377.77778 2
192 6027 PLANT MATERIAL (100 GAL) (TREE) EA     93.000 1,100.00000 1
192 6032 PLANT MATERIAL (10 GAL) (SHRUB) EA     49.000 180.00000 1
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO     9.000 1,000.00000 1