AVERAGE LOW BID UNIT PRICE - MAINTENANCE - PARIS DISTRICT

Last Update: Thursday, July 14, 2022
ITEMS 770 6022 TO 786 6002
ItemsItemsBid Code Range
0000 - 0000
0104 - 0168
0247 - 0247
0305 - 0361
0400 - 0496
0500 - 0556
0644 - 0690
0700 - 0788
6000 - 6185
7005 - 7139
8251 - 8251
700 6003 - 770 6019
770 6021 - 770 6021
770 6022 - 786 6002
Item NoDescriptionUnitsMarch 31, 2019Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
770 6022REPLACE SINGLE GDRAIL TERMINAL POSTEA  480.00050.000002
770 6024REPLACE TERMINAL ANCHOR POSTSEA  5.0001.000001
770 6027REMOVE GDRAIL END TRT / REPL WITH SGTEA  36.0002,000.000001
770 6028REPL SINGLE GDRAIL TERM IMPACT HEADEA  52.000923.076922
770 6029REM & RESET SGT IMPACT HEADEA  72.000116.666672
770 6031REPLACE SGT CABLE ANCHOREA  10.00075.000001
770 6032REPLACE SGT STRUTEA  4.00075.000001
770 6034REPAIR RAIL ELEMENT(W - BEAM FURNISHEDLF  1,500.00015.000001
770 6035REPAIR RAIL ELEMENT(THRIE - BEAM)(FURNLF  300.00020.000001
770 6036REP RAIL ELMNT (THRIE - BM TRANS)(FURNLF  100.00020.000001
770 6043REM/REP TIM/STL POST W/O CONC FND(FURNEA  500.00025.000001
770 6044INSTALL BLOCKOUTS (FURNISHED)EA  50.00020.000001
774 6006REPAIR (TRACC)EA  2.0008,000.000001
774 6011REPAIR (CATCB - FRNT SECT)EA  1.0001,000.000001
774 6018REPAIR (CATGR - FRONT SECTION)EA  1.0001,000.000001
774 6019REPAIR (CATGR - END SECTION)EA  1.0001,000.000001
774 6030REPAIR (REACT 350) (W)EA  2.0005,000.000001
778 6002CONCRETE RAIL REPAIR (MISC)LF  50.000247.000001
786 6002CARBON FIBER REINF POLYMER STRENGTHNINSF  30.000400.000001