AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PHARR DISTRICT

Last Update: Friday, October 31, 2014
ITEMS 100 2001 TO 192 2055
Items Items Bid Code Range
0100 - 0192
0204 - 0275
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
1012 - 1151
2203 - 2298
3249 - 3268
4035 - 4678
5086 - 5926
6007 - 6834
8020 - 8835
100 2001 - 192 2055
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     45.000 2,000.00000 1
100 2002 PREPARING ROW STA     1,836.315 1,175.73494 11
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     1.000 500.00000 1
104 2001 REMOVING CONC (PAV) SY     39,140.000 3.99739 2
104 2009 REMOVING CONC (RIPRAP) SY     16,180.500 6.81216 3
104 2011 REMOVING CONC (MEDIANS) SY     1,142.400 11.00000 1
104 2013 REMOVING CONC (FOUNDATIONS) SY     24.000 23.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     347.800 14.03335 2
104 2017 REMOVING CONC (DRIVEWAYS) SY     3,231.400 14.15395 8
104 2021 REMOVING CONC (CURB) LF     5,783.570 3.58567 3
104 2022 REMOVING CONC (CURB AND GUTTER) LF     2,062.000 15.03550 2
104 2026 REMOVE CONC (GUTTER) LF     137.000 16.43000 1
104 2028 REMOVING CONC (MISC) SY     407.000 16.67396 3
104 2034 REMOVING CONC (COPING) LF     600.000 43.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     3,019.400 18.79743 4
104 2037 REMOVE CONC (RAIL) LF     905.000 30.00000 1
104 2049 REMOVE CONCRETE (MSE PANELS) SF     800.000 30.00000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     31,343.000 3.54000 1
106 2001 OBLITERATING ABANDONED ROAD STA     103.550 438.51463 2
106 2002 OBLITERATING ABANDONED ROAD SY     12,355.500 6.59176 2
110 2001 EXCAVATION (ROADWAY) CY     515,579.000 4.30057 10
110 2002 EXCAVATION (CHANNEL) CY     5,658.000 7.16660 6
110 2003 EXCAVATION (SPECIAL) CY     2,623.000 4.21000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     61.000 6.70000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     646,194.000 6.84560 11
134 2001 BACKFILL (TY A) STA     116.710 330.00000 1
150 2001 BLADING STA     6.400 370.00000 1
160 2005 FURNISHING AND PLACING TOPSOIL CY     1,935.000 29.54780 11
162 2002 BLOCK SODDING SY     312.000 9.00000 1
164 2009 BROADCAST SEED (TEMP) (WARM) SY     7,000.000 .30000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     184,027.000 .45000 1
164 2024 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) AC     57.400 2,500.00000 1
164 2028 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) AC     37.580 1,177.15274 5
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     92,014.000 .45000 1
164 2030 CELL FBR MLCH SEED (TEMP) (WARM) AC     93.620 1,969.42320 4
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     92,014.000 .45000 1
164 2034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC     118.790 1,223.33109 2
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     2,324.000 1.00000 1
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     86.360 1,402.12483 3
164 2041 DRILL SEEDING (TEMP) (WARM) SY     2,324.000 1.00000 1
164 2042 DRILL SEEDING (TEMP) (WARM) AC     205.150 986.50987 5
168 2001 VEGETATIVE WATERING MG     13,097.250 15.40973 8
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     49,066.000 1.47590 2
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     24,751.000 1.03992 4
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     2,176.000 1.50000 1
170 2001 IRRIGATION SYSTEM LS     1.000 70,000.00000 1
192 2002 PLANT MATERIAL (1 - GAL) EA     4,360.000 8.00000 1
192 2016 PLANT BED PREPARATION SY     11,576.000 5.00000 1
192 2023 PLANT MATERIAL (15 GAL) (TREE) EA     136.000 100.00000 1
192 2024 PLANT MATERIAL (30 GAL) (TREE) EA     9.000 200.00000 1
192 2031 PLANT MATERIAL (5 GAL) (SHRUB) EA     345.000 30.00000 1
192 2032 PLANT MATERIAL (10 GAL) (SHRUB) EA     64.000 100.00000 1
192 2034 PLANT MATERIAL (MIN 3' HT) (B & B) EA     308.000 200.00000 1
192 2045 PLANT MATERIAL (MIN 2 1 / 2" CAL) (B & B) EA     68.000 200.00000 1
192 2049 PLANT MATERIAL (MIN 4' TRNK HT) (PALM) EA     125.000 400.00000 1
192 2055 PLANT MATERIAL (MIN 4'HT) (BARE ROOT) EA     51.000 200.00000 1