AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PHARR DISTRICT

Last Update: Wednesday, July 2, 2014
ITEMS 500 2001 TO 560 2015
Items Items Bid Code Range
0100 - 0192
0204 - 0275
0305 - 0356
0400 - 0496
0500 - 0560
0610 - 0690
1012 - 1122
2145 - 2215
3249 - 3271
4035 - 4642
5086 - 5926
6007 - 6834
8260 - 8941
9012 - 9012
500 2001 - 560 2015
Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 1.000 200,000.00000 19.000 381,665.35684 19
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15.000 3,500.00000 215.000 4,152.83893 19
508 2001 CONSTRUCTING DETOURS STA     3.500 10,000.00000 1
508 2002 CONSTRUCTING DETOURS SY     21,617.000 42.35578 2
512 2004 PORT CTB (FUR & INST) (SNGL SLP) (TY 1) LF     24,470.000 50.61381 2
512 2005 PORT CTB (FUR & INST) (SNGL SLP) (TY 2) LF 5,100.000 58.00000 5,100.000 58.00000 1
512 2008 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF 360.000 45.00000 7,620.000 70.16535 3
512 2009 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF 40.000 45.00000 520.000 75.46154 3
512 2011 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) LF     210.000 23.00000 1
512 2020 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     210.000 20.00000 1
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF     38,610.000 3.37622 2
512 2023 PORT CTB (MOVE) (SNGL SLP) (TY 2) LF 7,140.000 7.50000 7,140.000 7.50000 1
512 2026 PORT CTB (MOVE) (LOW PROF) (TY 1) LF     4,040.000 8.00000 1
512 2027 PORT CTB (MOVE) (LOW PROF) (TY 2) LF     200.000 8.00000 1
512 2029 PORT CTB (STKPL) (SAFETY SH) (TY 2) LF     210.000 23.00000 1
512 2040 PORT CTB (REMOVE) (SNGL SLP) (TY 1) LF     24,470.000 3.41079 2
512 2041 PORT CTB (REMOVE) (SNGL SLP) (TY 2) LF 5,100.000 10.00000 5,100.000 10.00000 1
512 2044 PORT CTB (REMOVE) (LOW PROF) (TY 1) LF 360.000 15.00000 7,620.000 11.30709 3
512 2045 PORT CTB (REMOVE) (LOW PROF) (TY 2) LF 40.000 15.00000 520.000 11.61538 3
514 2004 PERM CONC TRF BARR (SGL SLP) (TY 1) (42" LF     7,026.000 58.48847 2
514 2022 PERM CONC TRF BARR (SGL SLP) (TY 4) (42" LF     830.000 77.38554 2
528 2001 COLORED TEXTURED CONC (4") SY 328.810 85.00000 328.810 85.00000 1
528 2004 LANDSCAPE PAVERS SY     7,784.660 55.96168 3
529 2002 CONC CURB (TY II) LF     2,201.000 18.00000 1
529 2007 CONC CURB (DOWEL) LF     3,310.000 10.75000 1
529 2009 CONCRETE CURB (SPECIAL) LF     6,333.000 10.00000 1
529 2012 CONC CURB & GUTTER (TY A) (BARRIER) LF 327.000 17.00000 4,202.000 20.92075 3
529 2013 CONC CURB (TY A) (BARRIER) LF 50.000 44.00000 50.000 44.00000 1
529 2017 CONC CURB & GUTTER (VALLEY GUTTER) LF     1,728.000 42.00000 1
529 2019 CONC CURB & GUTTER (TY B) (MOUNTABLE) LF     30,870.000 13.76145 3
529 2020 CONC CURB & GUTTER (TY A) (VALLEY GUTTER LF     168.000 33.00000 1
529 2032 CONC CURB (TY B) MOUNTABLE LF 7,133.300 7.85000 27,327.300 8.26431 3
529 2038 CONC CURB AND GUTTER (TY A) LF 607.000 13.00000 607.000 13.00000 1
530 2010 DRIVEWAYS (CONC) SY 76.000 70.00000 3,686.800 61.41638 7
530 2011 DRIVEWAYS (ACP) SY     23,082.720 32.29960 8
530 2012 DRIVEWAYS (SURF TREAT) SY     3,440.400 35.00000 1
530 2017 TURNOUTS (ACP) SY     733.200 48.00000 1
530 2018 TURNOUTS (SURF TREAT) SY     453.300 35.00000 1
531 2005 CURB RAMPS (TY 1) EA     21.000 1,237.14286 2
531 2006 CURB RAMPS (TY 2) EA     4.000 1,425.00000 1
531 2010 CURB RAMPS (TY 7) EA     4.000 1,425.00000 1
531 2015 CONC SIDEWLKS (4") SY     3,984.400 31.30000 1
531 2017 CURB RAMPS (TY 21) EA     2.000 1,425.00000 1
531 2035 CONCRETE SIDEWALKS (5') (4") LF     9,858.800 21.32371 3
531 2040 CURB RAMPS (TY 5) EA     4.000 1,300.00000 1
531 2041 CURB RAMPS (TY 10) EA     30.000 1,500.00000 1
531 2054 CURB RAMPS SY     6,980.000 111.00000 1
531 2070 CURB RAMPS (TY 5) SY 43.000 95.00000 43.000 95.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     210,386.000 .10000 1
536 2002 CONC MEDIAN SY 1,227.500 48.25000 1,328.500 48.53509 2
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 1,269.000 19.95000 4,581.500 18.17765 7
540 2005 TERMINAL ANCHOR SECTION EA     4.000 680.00000 2
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 4.000 2,400.00000 26.000 1,592.30769 4
540 2012 MTL BEAM GD FEN TRANS (TL2) EA     11.000 962.97455 2
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF     37.500 23.20987 1
540 2031 MTL BM GD FN (REMOVE & RESET) LF     125.000 8.00000 1
540 2035 MTL W - BEAM GD FEN (SALVAGE & REUSE) LF     125.000 17.00000 1
540 2036 DRIVEWAY TERMINAL ANCHOR SECTION EA     3.000 721.09000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     17.000 933.83882 4
542 2001 REMOVING METAL BEAM GUARD FENCE LF 1,075.000 8.00000 4,922.000 5.00849 6
542 2002 REMOVING TERMINAL ANCHOR SECTION EA 2.000 1,500.00000 17.000 793.52941 5
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA 2.000 1,500.00000 2.000 1,500.00000 1
542 2004 REMOVING MTL BM GD FEN TRANS (TL2) LF 2.000 825.00000 2.000 825.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 3,000.00000 31.000 2,289.09065 9
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     3.000 218.33333 2
545 2001 CRASH CUSH ATTEN (INSTL) EA     12.000 11,575.00000 4
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     17.000 1,666.94118 2
545 2003 CRASH CUSH ATTEN (REMOVE) EA     7.000 567.14286 2
545 2089 CRASH CUSH ATTEN (INSTL) (R) (N) (TL3) EA 1.000 19,500.00000 1.000 19,500.00000 1
545 2100 CRASH CUSHION ATTENUATOR (MOVE & RESET EA 5.000 3,850.00000 5.000 3,850.00000 1
545 2101 CRASH CUSHION ATTENUATOR (REMOVE) EA 2.000 2,500.00000 2.000 2,500.00000 1
560 2006 MAILBOX INSTALL - S (RR - POST) TY 4 FND - T EA     1.000 300.00000 1
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA     1.000 325.00000 1
560 2009 MAILBOX INSTALL - M (TWG - POST) TY 1 FND EA     1.000 375.00000 1
560 2011 MAILBOX INSTALL - S (TWG - POST) TY 2 FND EA     30.000 157.33333 2
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     10.000 204.00000 2