AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANTONIO DISTRICT

Last Update: Thursday, July 14, 2016
ITEMS 100 6001 TO 193 6022
Items Items Bid Code Range
0100 - 0193
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0785
1002 - 1010
3002 - 3014
4028 - 4052
5001 - 5008
6001 - 6101
7011 - 7092
9033 - 9033
100 6001 - 193 6022
Item No Description Units June 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 6001 PREPARING ROW AC     1.510 20,000.00000 1
100 6002 PREPARING ROW STA 232.000 4,801.72810 2,557.630 1,864.65142 15
100 6007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     2.000 3,412.50000 1
100 6009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     1.000 5,294.75000 1
100 6011 PREPARING ROW (TREE) (24" TO 36" DIA.) EA     4.000 2,100.00000 1
104 6009 REMOVING CONC (RIPRAP) SY 1,499.000 13.00000 20,394.000 10.02868 10
104 6011 REMOVING CONC (MEDIANS) SY     662.000 12.93021 2
104 6015 REMOVING CONC (SIDEWALKS) SY     769.000 10.32204 4
104 6017 REMOVING CONC (DRIVEWAYS) SY     4,175.000 8.16994 5
104 6021 REMOVING CONC (CURB) LF     12,244.000 5.48373 9
104 6022 REMOVING CONC (CURB AND GUTTER) LF     806.000 3.44541 2
104 6023 REMOVING CONC (CTB) LF     354.000 22.00000 1
104 6027 REMOVING CONC (APPR SLAB) SY     368.000 15.00000 1
104 6032 REMOVING CONC (WHEELCHAIR RAMP) SY     64.000 17.32656 2
104 6037 REMOVE CONC (RAIL) LF     1,208.000 55.00000 1
104 6054 REMOVING CONCRETE (MOW STRIP) LF     270.000 20.00000 1
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY     4,641.000 3.00000 1
105 6014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY     62,138.000 5.00000 1
105 6034 REMOVING STAB BASE AND ASPH PAV (1" - 9") SY     189,824.000 2.92000 1
105 6035 REMOVING STAB BASE & ASPH PAV (0 - 2") SY     336.000 38.00000 1
105 6061 REMOV STAB BASE & ASPH PAV (8" - 20") SY     28,881.000 .01000 1
105 6069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     26,012.000 .01000 1
105 6076 REMOV STAB BASE AND ASPH PAV (2" - 15") SY     10,870.000 2.50000 1
106 6001 OBLITERATING ABANDONED ROAD STA     33.000 220.00000 1
110 6001 EXCAVATION (ROADWAY) CY 200,538.000 3.17051 752,080.000 7.44828 17
110 6002 EXCAVATION (CHANNEL) CY 9,354.000 7.00000 9,354.000 7.00000 1
112 6001 SUBGRADE WIDENING (ORD COMP) STA     50.610 1,000.19048 2
132 6001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     5,784.000 5.00000 1
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 856,591.000 12.00310 1,189,844.000 11.05139 13
132 6005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     562.000 20.00000 1
132 6019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     47.000 55.00000 1
134 6002 BACKFILL (TY B) STA     642.000 110.00000 1
150 6001 BLADING STA     1,421.730 18.78642 2
150 6002 BLADING HR     58.000 74.59828 2
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 17,888.000 2.53000 308,070.000 .22716 3
161 6002 COMPOST MANUF TOPSOIL (4") SY     5,810.000 7.00000 1
161 6012 GENERAL USE COMPOST CY     3.500 100.00000 1
161 6017 COMPOST MANUF TOPSOIL (4") SY 349,204.000 2.02000 710,035.000 1.62738 8
162 6002 BLOCK SODDING SY 2,707.000 4.03000 59,254.000 3.51549 3
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     5,742.000 .25000 1
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     5,810.000 .25000 1
164 6011 BROADCAST SEED (TEMP) (COOL) SY     9,287.000 .18000 1
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     85,667.000 .24924 2
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY     59,905.000 .25017 2
164 6031 CELL FBR MLCH SEED (TEMP) (COOL) SY     59,905.000 .25017 2
164 6033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     165,305.000 .10468 3
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     14,650.000 .16732 2
164 6039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY 349,204.000 .12000 450,444.000 .12774 3
164 6041 DRILL SEEDING (TEMP) (WARM) SY     289,671.000 .02738 3
164 6043 DRILL SEEDING (TEMP) (COOL) SY     19,138.000 .16416 3
164 6051 DRILL SEED (TEMP) (WARM OR COOL) SY 173,678.000 .11913 431,249.000 .10243 6
164 6066 DRILL SEEDING (PERM) (WARM OR COOL) SY 15,181.000 .12000 298,151.000 .03458 2
166 6001 FERTILIZER AC     11.840 426.39358 2
168 6001 VEGETATIVE WATERING MG 5,735.200 25.67706 24,913.900 17.36190 16
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 1,754.000 1.34000 163,120.000 .86670 6
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     165,305.000 1.02774 3
170 6001 IRRIGATION SYSTEM LS     1.000 6,000.00000 1
192 6002 PLANT MATERIAL (1 - GAL) EA     132.000 10.00000 1
192 6003 PLANT MATERIAL (3 - GAL) EA     18.000 20.00000 1
192 6004 PLANT MATERIAL (5 - GAL) EA     86.000 25.00000 1
192 6005 PLANT MATERIAL (15 - GAL) EA     22.000 150.00000 1
192 6006 PLANT MATERIAL (30 - GAL) EA     3.000 550.00000 1
192 6013 MULCH SY     53.000 5.00000 1
192 6016 PLANT BED PREPARATION SY     92.000 6.00000 1
192 6046 PLANT MATERIAL (MIN 3" CAL) (B & B) EA     1.000 350.00000 1
193 6003 PLANT REPLACEMENT (1 - GAL) EA     13.000 15.00000 1
193 6004 PLANT REPLACEMENT (3 - GAL) EA     2.000 20.00000 1
193 6005 PLANT REPLACEMENT (5 - GAL) EA     9.000 40.00000 1
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO     3.000 1,000.00000 1
193 6009 PLANT REPLACEMENT (15 GAL) EA     3.000 150.00000 1
193 6021 PLANT MAINTENANCE LOCATION A MO     3.000 1,000.00000 1
193 6022 PLANT MAINTENANCE LOCATION B MO     3.000 1,000.00000 1