AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANTONIO DISTRICT

Last Update: Tuesday, September 30, 2014
ITEMS 100 2001 TO 193 2009
Items Items Bid Code Range
0100 - 0193
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0780
1014 - 1127
2063 - 2288
3127 - 3285
4007 - 4670
5261 - 5957
6006 - 6900
7419 - 7421
8020 - 8998
100 2001 - 193 2009
Item No Description Units Sept 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     109.000 615.77982 2
100 2002 PREPARING ROW STA 671.050 240.74823 3,727.470 959.59975 21
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     2.000 500.00000 1
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     5.000 1,400.00000 1
104 2001 REMOVING CONC (PAV) SY     409.000 28.95000 1
104 2009 REMOVING CONC (RIPRAP) SY 3,108.000 25.28332 18,604.000 12.59618 14
104 2011 REMOVING CONC (MEDIANS) SY     3,466.200 15.31233 4
104 2015 REMOVING CONC (SIDEWALKS) SY     2,274.000 11.35039 6
104 2017 REMOVING CONC (DRIVEWAYS) SY 31.000 50.00000 4,196.400 16.77984 8
104 2021 REMOVING CONC (CURB) LF 392.000 9.96000 24,857.000 3.74691 11
104 2022 REMOVING CONC (CURB AND GUTTER) LF     934.000 8.00000 1
104 2023 REMOVING CONC (CTB) LF     695.000 31.00000 1
104 2027 REMOVING CONC (APPR SLAB) SY     28.000 94.00000 1
104 2028 REMOVING CONC (MISC) SY     561.000 8.00000 1
104 2031 REMOVING CONC (HEADWALL) CY     44.000 100.00000 1
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     47.000 30.20766 2
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     772.000 12.78280 3
104 2037 REMOVE CONC (RAIL) LF     1,227.635 55.00000 1
104 2040 REMOVING CONC (PAVERS) SY     395.000 6.00000 1
104 2044 REMOVING CONC (FLUME) SY     435.000 5.55000 1
104 2054 REMOVING CONCRETE (MOW STRIP) LF     4,480.000 8.49665 3
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     2,087.000 3.42000 1
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY 978.000 20.00000 978.000 20.00000 1
105 2016 REMOVING STAB BASE & ASPH PAV (16") SY     24,888.000 6.25000 1
105 2018 REMOVING STAB BASE AND ASPH PAV (7") SY     9,060.700 6.50000 1
105 2030 REMOVING STAB BASE & ASPH PAV (8" - 14") SY 4,803.000 2.44000 4,803.000 2.44000 1
105 2039 REMOVE STAB BASE AND ASPH PAV (6" - 20") SY     15,781.000 6.59616 2
105 2049 REMOVING STAB BASE & ASPH PAV (4" - 22") SY     845.000 10.47000 1
106 2001 OBLITERATING ABANDONED ROAD STA     27.000 900.00000 1
110 2001 EXCAVATION (ROADWAY) CY 17,103.000 6.43228 531,250.550 10.53919 27
110 2002 EXCAVATION (CHANNEL) CY 5,967.000 26.59259 11,438.400 21.13312 4
110 2003 EXCAVATION (SPECIAL) CY 1,970.000 5.62000 1,970.000 5.62000 1
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 3,455.000 4.34000 3,455.000 4.34000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 9,601.000 4.40570 154,375.300 6.61052 22
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     5,580.000 18.36989 2
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     49,668.000 16.00000 1
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY 128.000 50.00000 1,832.000 45.67396 2
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     15.000 16.00000 1
150 2002 BLADING HR     164.000 107.22098 6
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     40.000 125.00000 1
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 24,578.000 .35000 27,374.000 .72281 2
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     613,116.000 1.45265 10
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     40,311.000 4.00000 1
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY     34,832.000 .96000 1
161 2022 GENERAL USE COMPOST (4") SY     17,744.000 3.00000 1
162 2002 BLOCK SODDING SY     53,726.000 3.37084 8
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     95,240.000 .12730 2
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY 5,640.000 .20000 22,277.000 .12532 3
164 2009 BROADCAST SEED (TEMP) (WARM) SY     11,530.000 .28505 2
164 2011 BROADCAST SEED (TEMP) (COOL) SY     36,776.000 .15802 3
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY 24,870.000 .30689 48,549.000 .34384 4
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     25,862.000 .26000 1
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY 6,218.000 .37752 20,550.000 .33335 4
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY 6,218.000 .37752 20,550.000 .33335 4
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     638,876.000 .10781 4
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     362,300.000 .15097 7
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     22,555.000 .14638 2
164 2041 DRILL SEEDING (TEMP) (WARM) SY     399,847.000 .10357 5
164 2043 DRILL SEEDING (TEMP) (COOL) SY     399,847.000 .10357 5
164 2045 STRAW OR HAY MULCHING SY     250,712.000 .35000 1
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY     402,548.000 .07312 6
168 2001 VEGETATIVE WATERING MG 818.700 31.32798 31,627.964 16.10685 26
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 24,578.000 .62000 145,266.000 .87009 8
169 2002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     369,497.000 .98725 4
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     61,788.000 1.39778 2
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     7,597.000 1.69005 2
170 2001 IRRIGATION SYSTEM LS     1.000 75,000.00000 1
192 2003 PLANT MATERIAL (3 - GAL) EA     89.000 25.00000 1
192 2004 PLANT MATERIAL (5 - GAL) EA     5,378.000 25.00000 1
192 2005 PLANT MATERIAL (15 - GAL) EA     879.000 100.00000 1
192 2013 MULCH SY     20,627.000 3.00000 1
192 2035 PLANT MATERIAL (MIN 4' HT) (B & B) EA     52.000 300.00000 1
192 2049 PLANT MATERIAL (MIN 4' TRNK HT) (PALM) EA     52.000 400.00000 1
192 2063 PLANT BED PREP (TYPE I) SY     17,744.000 1.00000 1
192 2064 PLANT BED PREP (TYPE II) SY     2,883.000 2.00000 1
192 2079 PLANT MATERIAL (MIN 2' TR HT) (PALM) EA     8.000 300.00000 1
193 2001 PLANT MAINTENANCE MO     24.000 1,500.00000 1
193 2004 PLANT REPLACEMENT (3 - GAL) EA     2.000 25.00000 1
193 2005 PLANT REPLACEMENT (5 - GAL) EA     10.000 30.00000 1
193 2007 IRRIGATION SYSTEM OPER AND MAINT MO     24.000 1,000.00000 1
193 2009 PLANT REPLACEMENT (15 GAL) EA     5.000 125.00000 1