AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANTONIO DISTRICT

Last Update: Thursday, November 20, 2014
ITEMS 610 2025 TO 647 2003
Items Items Bid Code Range
0100 - 0193
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0780
1014 - 1127
2063 - 2316
3127 - 3285
4007 - 4670
5261 - 5957
6006 - 6900
7419 - 7421
8020 - 8998
610 2025 - 647 2003
650 2034 - 666 2084
666 2093 - 682 2023
682 2024 - 690 2235
Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
610 2025 INS RD IL AM (TY SA) 40T - 8 (.25 KW) S EA     73.000 2,303.20521 3
610 2026 INS RD IL AM (TY SA) 40T - 8 - 8 (.25 KW) S EA     1.000 3,000.00000 1
610 2029 INS RD IL AM (TY SA) 50B - 10 (.4 KW) S EA     2.000 2,700.00000 1
610 2038 INS RD IL AM (TY SA) 50T - 10 (.4 KW) S EA     119.000 2,411.99143 2
610 2039 INS RD IL AM (TY SA) 50T - 10 - 10 (.4 KW) S EA     205.000 3,269.36000 1
610 2049 INS RD IL AM (TY SP) 48S - 10 - 10 (.4 KW) S EA     3.000 4,500.00000 1
610 2060 INS RD IL AM (U / P) (TY 1) (.15KW) S EA     64.000 1,522.51000 2
610 2063 RELOCATE RD IL ASM (SHO - BASE) EA     3.000 2,400.00000 1
610 2064 RELOCATE RD IL ASM (TRANS - BASE) EA     2.000 1,800.00000 1
610 2068 REMOVE RD IL ASM (TRANS - BASE) EA     2.000 500.00000 1
610 2069 REMOVE RD IL ASM (U / P) EA     43.000 123.06000 1
610 2072 REMOVE RDWY ILL ASSEM EA     91.000 467.33703 2
617 2004 TEMP RD IL (RD IL ASM) EA     50.000 2,762.00000 2
618 2018 CONDT (PVC) (SCHD 40) ( 2") LF     85,696.000 5.30893 5
618 2019 CONDT (PVC) (SCHD 40) (2") (BORE) LF     1,070.000 37.00000 1
618 2022 CONDT (PVC) (SCHD 40) (3") LF     1,472.000 13.14160 3
618 2023 CONDT (PVC) (SCHD 40) (3") (BORE) LF     66.000 65.00000 1
618 2024 CONDT (PVC) (SCHD 40) (4") LF     482.000 21.00000 1
618 2025 CONDT (PVC) (SCHD 40) (4") (BORE) LF     1,107.000 41.00000 1
618 2030 CONDT (PVC) (SCHD 80) (1 1 / 2") LF     390.000 30.46000 1
618 2034 CONDT (PVC) (SCHD 80) (2") LF 1,450.000 4.50000 6,588.000 13.08998 14
618 2035 CONDT (PVC) (SCHD 80) (2") (BORE) LF 1,175.000 10.00000 15,572.000 28.11204 10
618 2038 CONDT (PVC) (SCHD 80) (3") LF 1,720.000 7.70000 7,405.000 11.07050 11
618 2039 CONDT (PVC) (SCHD 80) (3") (BORE) LF 1,905.000 12.00000 9,430.000 24.56124 8
618 2044 CONDT (RM) (3 / 4") LF     380.000 14.00000 1
618 2046 CONDT (RM) (1") LF     3,247.000 20.03000 1
618 2050 CONDT (RM) (1 1 / 2") LF     571.000 24.02000 1
618 2052 CONDT (RM) (2") LF     550.000 35.16545 3
618 2053 CONDT (RM) (2") (BORE) LF     1,535.000 47.30000 1
618 2056 CONDT (RM) (3") LF     120.000 20.00000 1
618 2080 CONDUIT (PVC) (SCHD 40) (2") (CONC ENCSE) LF     3,120.000 17.60000 1
618 2086 CONDT (PVC) (SCHD 80) (2") (TRENCH) (ROCK) LF     100.000 14.92000 1
618 2087 CONDT (PVC) (SCHD 80) (2") (BORE) (ROCK) LF     100.000 57.26000 1
618 2088 CONDT (PVC) (SCHD 80) (3") (TRENCH) (ROCK) LF     100.000 21.39000 1
618 2089 CONDT (PVC) (SCHD 80) (3") (BORE) (ROCK) LF     100.000 59.17000 1
620 2007 ELEC CONDR (NO. 4) BARE LF     1,717.000 1.53441 2
620 2008 ELEC CONDR (NO. 4) INSULATED LF     9,013.000 2.11836 3
620 2009 ELEC CONDR (NO. 6) BARE LF 6,580.000 .70000 83,629.000 1.08261 18
620 2010 ELEC CONDR (NO. 6) INSULATED LF 1,140.000 1.25000 125,551.000 1.14593 10
620 2011 ELEC CONDR (NO. 8) BARE LF     51,874.000 .82906 4
620 2012 ELEC CONDR (NO. 8) INSULATED LF     119,883.000 .83866 5
620 2015 ELEC CONDR (NO.12) BARE LF     997.000 .90000 1
620 2016 ELEC CONDR (NO.12) INSULATED LF     1,994.000 .85000 1
621 2004 TRAY CABLE (4 CONDR) (12 AWG) LF     14,132.000 1.65061 10
624 2007 GROUND BOX TY A (122311) EA     3.000 500.00000 1
624 2008 GROUND BOX TY A (122311) W / APRON EA     324.000 593.93457 14
624 2013 GROUND BOX TY D (162922) EA     216.000 700.00000 2
624 2014 GROUND BOX TY D (162922) W / APRON EA 19.000 1,100.00000 132.000 742.50689 15
624 2034 REMOVE EXISTING GROUND BOXES EA     116.000 97.03448 2
625 2001 ZINC - COAT STL WIRE STRAND (5 / 16 IN) LF     1,500.000 4.31000 2
625 2002 ZINC - COAT STL WIRE STRAND (3 / 16 IN) LF     5,580.000 8.60000 1
627 2001 TIMBER POLE (CL 2) 40 FT EA     1.000 1,605.00000 1
628 2013 ELC SRV TY A 240 / 480 060 (NS) AL (E) PS (U EA     3.000 3,600.00000 1
628 2018 ELC SRV TY A 240 / 480 060 (NS) SS (E) SP (U EA     2.000 4,697.22000 1
628 2034 ELC SRV TY A 240 / 480 100 (NS) SS (E) SP (O EA     19.000 3,458.90000 1
628 2055 ELC SRV TY D 120 / 240 060 (NS) AL (E) PS (U EA     1.000 3,200.00000 1
628 2083 ELC SRV TY D 120 / 240 070 (NS) AL (E) TS (O EA     2.000 2,409.64000 1
628 2122 ELC SRV TY D 120 / 240 100 (NS) SS (E) SP (O EA     1.000 5,000.00000 1
628 2149 ELC SRV TY T 120 / 240 000 (NS) GS (N) TP (O EA     2.000 1,773.84000 1
628 2158 REMOVE ELECTRICAL SERVICES EA     2.000 190.00000 1
628 2164 ELC SRV TY D 120 / 240 070 (NS) AL (E) PS (U EA 2.000 3,800.00000 5.000 3,596.48000 2
628 2262 ELC SRV TY D 120 / 240 060 (NS) AL (N) PS (U EA     2.000 3,100.00000 1
628 2295 ELC SRV TY D 120 / 240 070 (NS) AL (E) TP (O EA     25.000 3,089.76640 6
636 2001 ALUMINUM SIGNS (TY A) SF     973.900 27.74112 8
636 2002 ALUMINUM SIGNS (TY G) SF     1,474.100 22.87009 5
636 2003 ALUMINUM SIGNS (TY O) SF 1,273.750 35.00000 4,867.250 27.58628 5
636 2006 REFURBISH ALUMINUM SIGNS (TY O) EA     7.000 1,300.00000 1
636 2007 REPLACE EXISTING ALUMINUM SIGNS (TY A) SF 168.000 25.00000 24,710.000 16.12270 3
636 2008 REPLACE EXISTING ALUMINUM SIGNS (TY G) SF     11,044.250 18.90000 1
636 2009 REPLACE EXISTING ALUMINUM SIGNS (TY O) SF     8,083.250 21.70000 1
644 2001 INS SM RD SN SUP & AM TY 10BWG (1) SA (P) EA 2.000 1,000.00000 40.000 360.00000 1
644 2005 IN SM RD SN SUP & AM TY10BWG (1) SA (T - 2EXT EA     1.000 510.77000 1
644 2013 IN SM RD SN SUP & AM TY10BWG (2) SA (P) EA     1.000 874.00000 1
644 2017 IN SM RD SN SUP & AM TYFRP (1) UA (P) EA     2.000 376.00000 1
644 2022 INS SM RD SN SUP & AM TY S80 (1) SA (P) EA     73.000 329.17808 3
644 2025 IN SM RD SN SUP & AM TYS80 (1) SA (T) EA     73.000 632.43178 15
644 2026 IN SM RD SN SUP & AM TYS80 (1) SA (T - 2EXT) EA     4.000 843.75000 2
644 2027 IN SM RD SN SUP & AM TYS80 (1) SA (U) EA 1.000 3,000.00000 21.000 706.62143 6
644 2028 IN SM RD SN SUP & AM TYS80 (1) SA (U - 1EXT) EA     2.000 769.90000 2
644 2029 IN SM RD SN SUP & AM TYS80 (1) SA (U - 2EXT) EA     1.000 736.25000 1
644 2030 IN SM RD SN SUP & AM TYS80 (1) SA (U - BM) EA     2.000 764.00000 1
644 2031 IN SM RD SN SUP & AM TYS80 (1) SA (U - WC) EA     13.000 822.59615 4
644 2042 IN SM RD SN SUP & AM TYS80 (2) SA (P) EA     4.000 1,335.35250 3
644 2043 IN SM RD SN SUP & AM TYS80 (2) SA (P - EXAL) EA     8.000 1,262.37500 4
644 2048 IN SM RD SN SUP & AM TYTWT (1) UA (P) EA     86.000 365.96337 2
644 2056 RELOCATE SM RD SN SUP & AM TY 10BWG EA     303.000 459.98858 8
644 2058 RELOCATE SM RD SN SUP & AM TY S80 EA     333.000 369.96982 9
644 2060 REMOVE SM RD SN SUP & AM EA 3.000 600.00000 711.000 63.11494 20
644 2062 IN SM RD SN SUP & AM TY10BWG (1) SA (U - WC) EA     8.000 698.50000 2
644 2063 INS SM RD SN SUP & AM (RAIL MOUNT) EA 5.000 2,500.00000 10.000 2,225.66200 3
644 2070 IN SM RD SN SUP & AM TY10BWG (2) SA (T) EA     3.000 1,065.00000 1
644 2077 REMOVE SM RD SN SUP & AM (SIGN ONLY) EA     36.000 39.77833 5
644 2080 RELOCATE SM RD SN SP & AM (GALV SQ) COSA EA     75.000 200.00000 1
644 2088 INS SM RD SN SUP & AM TY SPL - 1 EA     1.000 1,000.00000 1
644 2090 SM RD SGN SUP & AM TY A (INST SIGN ONLY) EA     13.000 170.00000 1
644 2112 REMOVE SM RD SN SUP & AM (FOUNDATION) EA     15.000 78.75000 1
644 2119 REMOV SM RD SN & AM (WAYFINDING) EA     2.000 155.25000 1
647 2001 INSTALL LRSS (STRUCT STEEL) LB     3,830.600 3.26828 3
647 2002 RELOCATE LRSA EA     2.000 1,500.00000 2
647 2003 REMOVE LRSA EA     26.000 586.01077 5