AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANTONIO DISTRICT

Last Update: Friday, October 31, 2014
ITEMS 1014 2001 TO 1127 2001
Items Items Bid Code Range
0100 - 0193
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0780
1014 - 1127
2063 - 2316
3127 - 3285
4007 - 4670
5261 - 5957
6006 - 6900
7419 - 7421
8020 - 8998
1014 2001 - 1127 2001
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1014 2001 LANDSCAPE AMENITY EA     39.000 2,000.00000 1
1014 2034 LANDSCAPE AMENITY (PLANTER) EA     1.000 2,625.00000 1
1016 2001 LOOSE AGGREGATE FOR GROUNDCOVER (TY I) CY     1,147.000 30.00000 1
1018 2001 TREE PROTECTION EA     9.000 210.87000 1
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     3,290.000 19.63000 4
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     7,408.000 19.32818 14
1122 2003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     1,636.000 24.08710 3
1122 2004 ROCK FILTER DAMS (INSTALL) (TY 4) LF     2,598.000 26.73900 8
1122 2009 ROCK FILTER DAMS (REMOVE) LF     19,258.000 6.08053 25
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 468.000 10.00000 5,777.000 12.65846 22
1122 2019 CONSTRUCTION EXITS (REMOVE) SY 468.000 5.00000 5,777.000 6.86440 22
1122 2024 BACKHOE WORK (EROSION & SEDM CONT) HR     93.000 95.00000 1
1122 2026 FRNT END LOADER WORK (ERSN & SEDM CONT HR 12.000 100.00000 52.000 76.92308 2
1122 2030 CONSTRUCTION PERIMETER FENCE LF     389.000 1.62036 2
1122 2031 SANDBAGS FOR EROSION CONTROL EA 4,000.000 3.00000 6,000.000 3.46667 2
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF 4,000.000 2.00000 183,978.000 1.79846 28
1122 2038 TEMP SDMT CONT FENCE (INLET PROTECTION LF     1,668.000 2.36281 2
1122 2040 ROCK FILTER DAMS (INSTALL) (TY 5) LF     4,326.000 31.35846 4
1122 2047 BIOGRD EROSN CONT LOGS (8" DIA) INSTAL LF     12,012.000 4.60254 5
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF 820.000 5.53000 4,546.000 4.91353 6
1122 2049 BIOGRD EROSN CONT LOGS (18" DIA) INSTAL LF 240.000 4.50000 3,163.000 5.45425 5
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF 1,060.000 1.62113 15,856.000 1.14319 14
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF 4,000.000 .50000 176,464.000 .23872 22
1127 2001 GEOGRID BASE REINFORCEMENT (TY I) SY     1,958.000 3.31001 2