AVERAGE LOW BID UNIT PRICE - MAINTENANCE - SAN ANTONIO DISTRICT

Last Update: Monday, June 2, 2014
ITEMS 100 2001 TO 169 2001
Items Items Bid Code Range
0100 - 0169
0247 - 0275
0310 - 0354
0401 - 0496
0500 - 0560
0621 - 0690
0712 - 0770
1122 - 1122
3224 - 3279
4159 - 4601
5049 - 5369
6006 - 6834
7094 - 7610
8020 - 8251
9606 - 9606
100 2001 - 169 2001
Item No Description Units May 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     1.500 3,000.00000 1
100 2002 PREPARING ROW STA     15.000 554.52000 1
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     10.000 1,000.00000 1
104 2011 REMOVING CONC (MEDIANS) SY     187.000 22.11000 1
104 2020 REMOVING CONC (OTHER APPURTENANCES) CY     100.000 43.87000 1
104 2021 REMOVING CONC (CURB) LF     283.000 9.48000 1
104 2028 REMOVING CONC (MISC) SY     100.000 26.00000 1
105 2050 REMOV STAB BASE AND ASPH PAV (24") SY     419.000 9.99000 1
110 2001 EXCAVATION (ROADWAY) CY     29,284.000 6.71788 2
110 2003 EXCAVATION (SPECIAL) CY 3,554.500 17.00000 3,554.500 17.00000 1
112 2001 SUBGRADE WIDENING (ORD COMP) STA     300.000 282.00000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     4,088.000 5.36229 2
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY 3,326.700 14.00000 3,326.700 14.00000 1
134 2002 BACKFILL (TY B) STA     801.000 101.12989 2
134 2004 BACKFILL (TY A OR B) STA     817.000 65.00000 1
150 2002 BLADING HR     125.000 117.05000 1
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 5,705.100 4.00000 5,705.100 4.00000 1
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY     2,260.000 2.19000 1
162 2002 BLOCK SODDING SY     2,260.000 4.37000 1
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     66,667.000 0.12000 1
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     77,880.760 0.10000 1
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY 5,705.100 0.75000 5,705.100 0.75000 1
168 2001 VEGETATIVE WATERING MG 0.089 20.00000 2,289.949 18.47256 4
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 5,705.100 4.00000 5,705.100 4.00000 1