AVERAGE LOW BID UNIT PRICE - MAINTENANCE - SAN ANTONIO DISTRICT

Last Update: Friday, October 3, 2014
ITEMS 677 2001 TO 690 2191
Items Items Bid Code Range
0100 - 0169
0247 - 0275
0310 - 0354
0400 - 0496
0500 - 0560
0621 - 0690
0712 - 0770
1122 - 1122
3224 - 3279
5049 - 5369
6006 - 6834
7094 - 7610
8020 - 8251
621 2002 - 672 2046
677 2001 - 690 2191
Item No Description Units Septembe 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
677 2001 ELIM EXT PAV MRK & MRKS ( 4") LF     13,000.000 0.30000 2
677 2003 ELIM EXT PAV MRK & MRKS ( 8") LF     3,200.000 0.59375 2
677 2005 ELIM EXT PAV MRK & MRKS (12") LF     700.000 1.00000 2
677 2006 ELIM EXT PAV MRK & MRKS (18") LF     500.000 1.50000 2
677 2007 ELIM EXT PAV MRK & MRKS (24") LF     4,100.000 1.75000 2
677 2015 ELIM EXT PAV MRK & MRKS (SYMBOL) EA     75.000 34.00000 2
677 2018 ELIM EXT PAV MRK & MRKS (WORD) EA     80.000 38.78438 3
677 2024 ELIM EXT PAV MRK & MRKRS (4") (CALLOUT) LF     3,000.000 0.50000 1
677 2025 ELIM EXT PAV MRK & MRKRS (8") (CALLOUT) LF     2,200.000 1.09091 2
677 2026 ELIM EXT PAV MRK & MRKRS (12") (CALLOUT) LF     200.000 2.25000 2
677 2027 ELIM EXT PAV MRK & MRKRS (18") (CALLOUT) LF     200.000 3.50000 2
677 2028 ELIM EXT PAV MRK & MRKRS (24") (CALLOUT) LF     200.000 5.80000 2
677 2029 ELIM EXT PAV MRK & MRKRS (SYMBOL) (CALLOUT EA     15.000 50.00000 1
677 2030 ELIM EXT PAV MRK & MRKRS (WORD) (CALLOUT EA     10.000 51.01500 2
681 2001 TEMP TRAF SIGNALS EA 2.000 2,165.00000 2.000 2,165.00000 1
690 2001 REMOVAL OF CONDUIT LF     50.000 4.00000 1
690 2002 INSTALL OF CONDUIT BY TRENCHING LF 1,000.000 22.00000 4,000.000 10.85000 3
690 2004 INSTALL OF CONDUIT BY BORING LF 400.000 55.00000 1,150.000 36.91739 3
690 2005 INSTALL OF VEHICLE DETECTORS LF     500.000 12.50000 1
690 2006 REMOVAL OF GROUND BOXES EA 2.000 150.00000 4.000 161.75000 3
690 2007 REPLACE OF GROUND BOXES EA 8.000 700.00000 18.000 676.38889 3
690 2008 INSTALL OF GROUND BOXES EA 8.000 700.00000 21.000 572.38095 3
690 2009 REMOVAL OF CABLES LF     1,500.000 0.85000 1
690 2010 REPLACE OF CABLES LF 7,000.000 3.25000 29,000.000 2.21621 3
690 2011 INSTALL OF CABLES LF 7,000.000 3.25000 22,000.000 2.32045 3
690 2016 REMOVAL OF SPAN CABLE ASSM LF     200.000 1.05000 1
690 2017 REPLACE OF SPAN CABLE ASSM LF 2,000.000 4.00000 6,000.000 3.21000 3
690 2018 INSTALL OF SPAN CABLE ASSM LF 2,000.000 2.50000 6,000.000 2.96333 3
690 2019 REPLACE OF ELECTRICAL SERVICE EA 3.000 1,850.00000 7.000 1,759.71429 3
690 2020 INSTALL OF ELECTRICAL SERVICE EA 2.000 1,750.00000 4.000 1,644.42000 3
690 2021 REMOVAL OF TIMBER POLES EA 4.000 200.00000 8.000 216.00000 3
690 2022 REPLACE OF TIMBER POLES EA 10.000 600.00000 18.000 534.00000 3
690 2023 INSTALL OF TIMBER POLES EA 8.000 500.00000 24.000 546.66667 3
690 2024 REMOVAL OF SIGNAL HEAD ASSM EA     4.000 88.50000 1
690 2025 REPLACE OF SIGNAL HEAD ASSM EA 20.000 310.00000 45.000 248.44444 3
690 2026 INSTALL OF SIGNAL HEAD ASSM EA 10.000 275.00000 30.000 213.66667 3
690 2027 REMOVAL OF SIGNAL RELATED SIGNS EA     2.000 66.50000 1
690 2028 REPLACE OF SIGNAL RELATED SIGNS EA 25.000 150.00000 65.000 133.69231 3
690 2029 INSTALL OF SIGNAL RELATED SIGNS EA 10.000 150.00000 30.000 122.66667 3
690 2030 REMOVAL OF PEDESTRIAN PUSH BUTTONS EA     1.000 51.00000 1
690 2031 REPLACE OF PEDESTRIAN PUSH BUTTONS EA 12.000 150.00000 76.000 83.19276 6
690 2032 INSTALL OF PEDESTRIAN PUSH BUTTONS EA 4.000 150.00000 12.000 108.00000 3
690 2033 REMOVAL OF TRAFFIC SIGNAL POLE FND LF 5.000 750.00000 10.000 607.97700 3
690 2036 INSTALL OF FND FOR GROUND MNT CABINETS EA 3.000 4,000.00000 7.000 3,225.14286 3
690 2038 REMOVAL OF CONTROL CABINET (GRND MNT) EA     1.000 175.00000 1
690 2039 REPLACE OF CONTROL CABINET (GRND MNT) EA     4.000 252.00000 1
690 2040 INSTALL OF CONTROL CABINET (GRND MNT) EA     4.000 252.00000 1
690 2044 REMOVAL OF FLASHER CABINET EA 2.000 125.00000 5.000 106.20000 3
690 2045 REPLACE OF FLASHER CABINET EA 2.000 250.00000 4.000 290.00000 3
690 2046 INSTALL OF FLASHER CABINET EA 4.000 250.00000 12.000 303.33333 3
690 2047 INSTALL OF FND FOR RDSD FLSH BEA ASSM EA 10.000 800.00000 10.000 800.00000 1
690 2048 REMOVAL OF RDSD FLSH BEACON ASSM EA 8.000 175.00000 11.000 165.81818 3
690 2049 REPLACE OF RDSD FLSH BEACON ASSM EA 2.000 850.00000 4.000 866.25000 3
690 2050 INSTALL OF RDSD FLSH BEACON ASSM EA 8.000 750.00000 24.000 743.33333 3
690 2051 REMOVAL OF SIGNAL POLE ASSM EA     1.000 365.00000 1
690 2052 REPLACE OF SIGNAL POLE ASSM EA 10.000 1,250.00000 21.000 1,031.80952 3
690 2053 INSTALL OF SIGNAL POLE ASSM EA 3.000 1,000.00000 6.000 861.00000 3
690 2054 REMOVAL OF CURBS LF 5.000 7.00000 15.000 19.25000 3
690 2055 REPLACE OF CURBS LF 250.000 17.00000 650.000 16.61538 3
690 2056 INSTALL OF CURBS LF 200.000 15.00000 400.000 15.68750 3
690 2057 REMOVAL OF PEDESTRIAN RAMPS EA     1.000 667.00000 1
690 2058 REPLACE OF PEDESTRIAN RAMPS EA 2.000 1,500.00000 6.000 1,500.33333 3
690 2059 INSTALL OF PEDESTRIAN RAMPS EA 6.000 1,500.00000 20.000 1,498.90000 3
690 2060 REMOVAL OF SIDEWALKS SF     50.000 5.75000 1
690 2061 REPLACE OF SIDEWALKS SF 100.000 11.00000 300.000 9.93667 3
690 2062 INSTALL OF SIDEWALKS SF 10.000 10.00000 18.000 29.06889 3
690 2063 REMOVAL OF CONCRETE FOUNDATIONS EA 10.000 750.00000 14.000 715.28571 3
690 2064 REMOVAL OF LUMINAIRE HEAD EA     1.000 66.00000 1
690 2065 REPLACE OF LUMINAIRE HEAD EA 4.000 175.00000 12.000 141.66667 3
690 2066 INSTALL OF LUMINAIRE HEAD EA 4.000 175.00000 12.000 116.66667 3
690 2067 REMOVAL OF LUMINAIRE MAST ARMS EA     1.000 88.00000 1
690 2068 REPLACE OF LUMINAIRE MAST ARMS EA 4.000 175.00000 12.000 147.66667 3
690 2069 INSTALL OF LUMINAIRE MAST ARMS EA 4.000 175.00000 12.000 135.00000 3
690 2070 INS OF TRF SIG PL FND (24" DRIL SHFT) LF 100.000 140.00000 250.000 118.60000 3
690 2071 INS OF TRF SIG PL FND (30" DRIL SHFT) LF 50.000 200.00000 200.000 152.75000 3
690 2072 INS OF TRF SIG PL FND (36" DRIL SHFT) LF 85.000 300.00000 220.000 215.11364 3
690 2073 INS OF TRF SIG PL FND (42" DRIL SHFT) LF 12.000 375.00000 16.000 368.00000 3
690 2074 INS OF TRF SIG PL FND (48" DRIL SHFT) LF 12.000 450.00000 16.000 446.87500 3
690 2103 INSTL PED POLE ASSM EA 4.000 675.00000 12.000 703.33333 3
690 2104 REPLACE PED POLE ASSM EA 4.000 675.00000 12.000 494.66667 3
690 2109 REMOVE DOWN GUY AND ANCHOR W / GUARD EA     1.000 117.00000 1
690 2110 INSTL DOWN GUY AND ANCHOR W / GUARD EA 2.000 350.00000 4.000 311.50000 3
690 2111 REPLACE DOWN GUY AND ANCHOR W / GUARD EA 6.000 350.00000 18.000 329.33333 3
690 2116 INSTALL LUMINAIRE POLE EA 2.000 650.00000 4.000 556.75000 3
690 2117 REPLACE LUMINAIRE POLE EA 2.000 750.00000 6.000 559.00000 3
690 2118 REMOVE LUMINAIRE POLE FOUNDATION EA 2.000 750.00000 6.000 507.33333 3
690 2128 REMOVE PED POLE ASSM EA     2.000 137.00000 1
690 2191 INSTALL LED LAMP UNIT EA     600.000 49.57833 3