AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANGELO DISTRICT

Last Update: Friday, May 27, 2016
ITEMS 100 6001 TO 164 6043
Items Items Bid Code Range
0100 - 0164
0216 - 0260
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0770
3004 - 3004
4040 - 4040
6001 - 6002
100 6001 - 164 6043
Item No Description Units May 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 6001 PREPARING ROW AC     .300 50,000.00000 1
100 6002 PREPARING ROW STA     1,279.900 428.07588 3
100 6006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     2.000 766.00000 1
104 6009 REMOVING CONC (RIPRAP) SY 77.000 29.53000 77.000 29.53000 1
104 6010 REMOVING CONC (RIPRAP) CY     42.700 220.00000 1
104 6011 REMOVING CONC (MEDIANS) SY     14.000 100.00000 1
104 6022 REMOVING CONC (CURB AND GUTTER) LF     88.000 28.63545 2
104 6054 REMOVING CONCRETE (MOW STRIP) LF     4,465.000 12.00000 1
105 6002 REMOVING STAB BASE AND ASPH PAV (2") SY     4,566.000 3.20000 1
105 6011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     457.000 5.90000 1
110 6001 EXCAVATION (ROADWAY) CY     64,887.000 10.54750 3
112 6001 SUBGRADE WIDENING (ORD COMP) STA     473.470 439.21999 1
112 6003 SUBGRADE WIDENING (DENS CONT) SY     4,904.000 6.66288 2
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     229.000 29.00000 1
132 6004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     22,795.000 18.70000 1
132 6019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     1,361.000 25.00000 1
134 6002 BACKFILL (TY B) STA     3,791.710 145.40977 5
134 6004 BACKFILL (TY A OR B) STA     2,114.300 142.11000 1
150 6002 BLADING HR     80.000 92.48000 1
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY     5,620.000 6.62205 2
160 6006 FURNISHING AND PLACING TOPSOIL (3") SY 284.300 8.15997 284.300 8.15997 1
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 284.300 5.53999 63,414.300 .15425 2
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     163,384.000 .50000 1
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     1,702.000 1.92000 1
164 6036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     19.200 392.80000 1
164 6041 DRILL SEEDING (TEMP) (WARM) SY     851.000 1.92000 1
164 6043 DRILL SEEDING (TEMP) (COOL) SY     851.000 1.92000 1