AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANGELO DISTRICT

Last Update: Thursday, November 20, 2014
ITEMS 500 2001 TO 545 2101
Items Items Bid Code Range
0100 - 0164
0216 - 0275
0310 - 0356
0400 - 0499
0500 - 0545
0610 - 0678
1003 - 1122
2212 - 2235
3213 - 3270
4418 - 4680
5369 - 5369
6055 - 6834
8020 - 8251
9023 - 9023
500 2001 - 545 2101
Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 2.000 149,412.06500 10.000 255,910.09300 10
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 18.000 4,308.78333 68.000 6,509.16176 9
508 2002 CONSTRUCTING DETOURS SY     639.000 185.00000 1
512 2002 PORT CTB (FUR & INST) (SAFETY SH) (TY 2) LF     3,560.000 75.00000 1
512 2020 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     6,050.000 6.00000 1
512 2038 PORT CTB (REMOVE) (SAFETY SH) (TY 2) LF     3,390.000 20.00000 1
514 2066 PRM CON TRF BAR (SG SLP) (TY 1) (42") (HPC LF     490.000 125.00000 1
528 2006 COLORED TEXTURED CONC (5") SY     296.000 70.00000 1
529 2002 CONC CURB (TY II) LF     455.000 25.00000 1
529 2004 CONC CURB & GUTTER (TY II) LF     17,020.000 23.15010 3
529 2009 CONCRETE CURB (SPECIAL) LF     127.000 30.00000 1
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF     7.000 100.00000 1
530 2010 DRIVEWAYS (CONC) SY     701.600 87.07469 2
530 2012 DRIVEWAYS (SURF TREAT) SY     4,479.000 47.73000 1
531 2005 CURB RAMPS (TY 1) EA     12.000 2,000.00000 1
531 2006 CURB RAMPS (TY 2) EA     1.000 2,000.00000 1
531 2010 CURB RAMPS (TY 7) EA     2.000 2,000.00000 1
531 2024 CONC SIDEWALK (5") SY     11,755.000 65.17695 2
531 2040 CURB RAMPS (TY 5) EA     6.000 3,000.00000 1
531 2041 CURB RAMPS (TY 10) EA     11.000 1,500.00000 1
531 2046 CURB RAMPS (TY 11) EA     1.000 2,000.00000 1
531 2124 CONC SIDEWALK (DRAIN) SF     786.100 16.85663 2
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     782,799.000 .11681 2
536 2002 CONC MEDIAN SY     483.000 85.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     575.000 18.15000 1
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     1,175.000 17.86000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     11.000 1,673.82909 2
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     10.000 995.00000 1
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     8.000 612.31000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     3,107.000 3.27844 3
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     1.000 319.70000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     3.000 2,062.00000 1
544 2013 GDRAIL END TRT (INSTALL) (HBA POST) EA     10.000 2,296.14000 1
545 2083 CRASH CUSH ATTEN (INSTL) (L) (N) (TL3) EA     2.000 17,200.00000 1
545 2089 CRASH CUSH ATTEN (INSTL) (R) (N) (TL3) EA     5.000 11,660.00000 1
545 2100 CRASH CUSHION ATTENUATOR (MOVE & RESET EA     5.000 5,000.00000 1
545 2101 CRASH CUSHION ATTENUATOR (REMOVE) EA     5.000 2,000.00000 1