AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - TYLER DISTRICT
ITEMS 100 6001 TO 193 6007 |
Items | Items | Bid Code Range |
---|---|---|
0100 - 0193 0247 - 0275 0310 - 0360 0400 - 0496 0500 - 0560 0610 - 0690 0712 - 0740 0800 - 0800 | 1002 - 1002 3000 - 3028 4021 - 4115 5048 - 5048 6000 - 6292 | 100 6001 - 193 6007 |
Item No | Description | Units | March 31, 2019 | Twelve-Month-Moving | Usage | ||
---|---|---|---|---|---|---|---|
Quantity | Avg Bid | Quantity | Avg Bid | ||||
100 6001 | PREPARING ROW | AC | 1.040 | 1,000.00000 | 4.880 | 6,059.42623 | 3 |
100 6002 | PREPARING ROW | STA | 29.880 | 1,677.64391 | 819.130 | 2,426.94676 | 19 |
103 6001 | DISPOSAL OF WATER WELLS | EA | 1.000 | 500.00000 | 1 | ||
104 6009 | REMOVING CONC (RIPRAP) | SY | 375.000 | 10.83200 | 1,566.000 | 11.19968 | 6 |
104 6017 | REMOVING CONC (DRIVEWAYS) | SY | 13,819.000 | 11.65931 | 11 | ||
104 6021 | REMOVING CONC (CURB) | LF | 573.000 | 10.57068 | 2 | ||
104 6022 | REMOVING CONC (CURB AND GUTTER) | LF | 1,060.000 | 9.13962 | 1,120.000 | 10.60536 | 4 |
104 6023 | REMOVING CONC (CTB) | LF | 30.000 | 60.00000 | 1 | ||
104 6028 | REMOVING CONC (MISC) | SY | 13.000 | 40.00000 | 1 | ||
104 6036 | REMOVING CONC (SIDEWALK OR RAMP) | SY | 24.000 | 32.00000 | 1 | ||
104 6037 | REMOVE CONC (RAIL) | LF | 20.000 | 189.00000 | 1 | ||
104 6040 | REMOVING CONC (PAVERS) | SY | 37.000 | 30.00000 | 1 | ||
104 6044 | REMOVING CONC (FLUME) | SY | 81.000 | 20.00000 | 159.000 | 20.81761 | 3 |
104 6045 | REMOVE CONC (MISC) | EA | 6.000 | 400.00000 | 6.000 | 400.00000 | 1 |
104 6054 | REMOVING CONCRETE(MOW STRIP) | LF | 774.000 | 8.00000 | 1,927.000 | 9.62740 | 3 |
105 6008 | REMOVING STAB BASE AND ASPH PAV (6") | SY | 560.000 | 4.50000 | 560.000 | 4.50000 | 1 |
105 6011 | REMOVING STAB BASE AND ASPH PAV (2"-6" | SY | 3,818.000 | 4.71172 | 3,818.000 | 4.71172 | 2 |
105 6018 | REMOVING STAB BASE AND ASPH PAV (7") | SY | 187.000 | 8.00000 | 187.000 | 8.00000 | 1 |
105 6023 | REMOVING STAB BASE AND ASPH PAV (5") | SY | 961.000 | 7.00000 | 961.000 | 7.00000 | 1 |
105 6037 | REMOVING STAB BASE AND ASPH PAV(0"-16" | SY | 38,938.000 | 4.28000 | 1 | ||
105 6041 | REMOVING STAB BASE AND ASPH PAV(8") | SY | 2,312.000 | 3.75000 | 1 | ||
105 6070 | REMOVING STAB BASE & ASPH PAV (6" - 8" | SY | 26,743.000 | 3.50000 | 1 | ||
106 6002 | OBLITERATING ABANDONED ROAD | SY | 3,686.000 | 5.00000 | 1 | ||
110 6001 | EXCAVATION (ROADWAY) | CY | 713.000 | 19.56311 | 241,885.000 | 6.12793 | 15 |
110 6002 | EXCAVATION (CHANNEL) | CY | 261.000 | 13.00000 | 687.000 | 16.90975 | 3 |
110 6003 | EXCAVATION (SPECIAL) | CY | 21,395.000 | 8.15144 | 2 | ||
112 6001 | SUBGRADE WIDENING (ORD COMP) | STA | 938.400 | 196.78314 | 5 | ||
132 6005 | EMBANKMENT (FINAL)(ORD COMP)(TY C) | CY | 1,164.000 | 20.06443 | 35,292.000 | 11.06044 | 6 |
132 6006 | EMBANKMENT (FINAL)(DENS CONT)(TY C) | CY | 2,661.000 | 10.00000 | 170,054.000 | 14.56650 | 8 |
132 6021 | EMBANKMENT (VEHICLE)(ORD COMP)(TY C) | CY | 36.000 | 50.00000 | 3,830.700 | 22.67811 | 14 |
132 6026 | EMBANKMENT (FINAL) (DENS CONT) (TY C2) | CY | 2,010.000 | 60.00000 | 1 | ||
134 6001 | BACKFILL (TY A) | STA | 2,120.050 | 255.58388 | 11 | ||
134 6002 | BACKFILL (TY B) | STA | 306.790 | 132.93686 | 4 | ||
134 6003 | BACKFILL (TY C) | STA | 556.720 | 203.87089 | 3 | ||
150 6001 | BLADING | STA | 1,015.340 | 146.22718 | 5 | ||
160 6003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 3,747.000 | 5.53403 | 891,298.000 | .98770 | 16 |
161 6017 | COMPOST MANUF TOPSOIL (4") | SY | 116,120.000 | 1.00000 | 1 | ||
162 6002 | BLOCK SODDING | SY | 228.000 | 7.00000 | 75,766.000 | 4.02386 | 6 |
164 6009 | BROADCAST SEED (TEMP) (WARM) | SY | 726.000 | 2.06818 | 2 | ||
164 6011 | BROADCAST SEED (TEMP) (COOL) | SY | 451.000 | 1.50000 | 1 | ||
164 6013 | STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY | SY | 317,106.000 | .24505 | 3 | ||
164 6023 | CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | SY | 275.000 | 1.00000 | 1 | ||
164 6047 | STRAW/HAY MLCH SEED(TEMP)(WARM) | SY | 158,560.000 | .22225 | 3 | ||
164 6049 | STRAW/HAY MLCH SEED(TEMP)(COOL) | SY | 158,560.000 | .21933 | 3 | ||
164 6054 | BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | SY | 19,311.000 | .98945 | 1,072,919.000 | .84723 | 24 |
164 6055 | BONDED FBR MTRX SEED (TEMP)(WARM) | SY | 4,105.000 | 1.50196 | 533,330.000 | .70836 | 23 |
164 6056 | BONDED FBR MTRX SEED (TEMP)(COOL) | SY | 4,105.000 | 1.11397 | 541,037.000 | .70203 | 23 |
164 6069 | BOND FBR MTRX SEED(PERM)(RURAL)(CLAY) | AC | .500 | 3,328.00000 | 1 | ||
164 6070 | BOND FBR MTRX SEED (PERM) (URBAN)(SAND | SY | 2,355.000 | 1.40000 | 1 | ||
168 6001 | VEGETATIVE WATERING | MG | 290.970 | 15.42101 | 33,581.200 | 8.15159 | 32 |
169 6002 | SOIL RETENTION BLANKETS (CL 1) (TY B) | SY | 85,175.000 | 1.25000 | 1 | ||
169 6004 | SOIL RETENTION BLANKETS (CL 1) (TY D) | SY | 200.000 | 2.25000 | 450.000 | 1.75000 | 2 |
170 6001 | IRRIGATION SYSTEM | LS | 1.000 | 30,000.00000 | 1 | ||
180 6001 | WILDFLOWER SEEDING | AC | 22.000 | 1,900.00000 | 1 | ||
192 6002 | PLANT MATERIAL (1-GAL) | EA | 153.000 | 15.00000 | 2 | ||
192 6004 | PLANT MATERIAL (5-GAL) | EA | 740.000 | 35.00000 | 2 | ||
192 6005 | PLANT MATERIAL (15-GAL) | EA | 24.000 | 125.00000 | 1 | ||
192 6015 | LANDSCAPE EDGE | LF | 1,218.000 | 23.00000 | 1 | ||
192 6016 | PLANT BED PREPARATION | SY | 1,022.000 | 12.17319 | 2 | ||
192 6024 | PLANT MATERIAL (30 GAL) (TREE) | EA | 20.000 | 300.00000 | 1 | ||
192 6025 | PLANT MATERIAL (45 GAL) (TREE) | EA | 10.000 | 500.00000 | 1 | ||
192 6067 | LANDSCAPE EDGE (TYPE I) | LF | 82.000 | 25.00000 | 1 | ||
192 6068 | LANDSCAPE EDGE (TYPE II) | LF | 85.000 | 30.00000 | 1 | ||
193 6001 | PLANT MAINTENANCE | MO | 8.000 | 1,250.00000 | 2 | ||
193 6006 | VEGETATIVE WATERING | MG | 275.000 | 1.00000 | 1 | ||
193 6007 | IRRIGATION SYSTEM OPER AND MAINT | MO | 4.000 | 1,500.00000 | 1 |