AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - TYLER DISTRICT
ITEMS 247 6001 TO 275 6011 |
Items | Items | Bid Code Range |
---|---|---|
0100 - 0193 0247 - 0275 0310 - 0360 0400 - 0496 0500 - 0560 0610 - 0690 0712 - 0740 0800 - 0800 | 1002 - 1002 3000 - 3028 4021 - 4115 5048 - 5048 6000 - 6292 | 247 6001 - 275 6011 |
Item No | Description | Units | March 31, 2019 | Twelve-Month-Moving | Usage | ||
---|---|---|---|---|---|---|---|
Quantity | Avg Bid | Quantity | Avg Bid | ||||
247 6001 | FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH | CY | 3,414.000 | 62.00000 | 1 | ||
247 6061 | FL BS (CMP IN PLC)(TYA GR1-2) (6") | SY | 166,510.000 | 14.73839 | 2 | ||
247 6231 | FL BS (CMP IN PLACE)(TY A GR 1-2)(10") | SY | 84,275.000 | 20.00000 | 1 | ||
247 6232 | FL BS (CMP IN PLACE)(TY A GR 1-2)(11") | SY | 56,107.000 | 20.50000 | 1 | ||
247 6233 | FL BS (CMP IN PLACE)(TY A GR 1-2)(12") | SY | 67,408.000 | 23.50000 | 1 | ||
251 6034 | REWORK BS MTL (TY C) (8") (ORD COMP) | SY | 116,432.000 | 1.84000 | 1 | ||
251 6273 | REWORK BS MTL (TY C)(12")(ORD COMP) | SY | 12,226.000 | 2.00000 | 1 | ||
260 6001 | LIME (HYDRATED LIME (DRY)) | TON | 1,954.000 | 176.09621 | 6 | ||
260 6002 | LIME (HYDRATED LIME (SLURRY)) | TON | 525.000 | 215.00000 | 1 | ||
260 6027 | LIME TRT (EXST MATL)(8") | SY | 137,930.000 | 3.68168 | 6 | ||
275 6001 | CEMENT | TON | 39.000 | 165.00000 | 6,906.000 | 147.96554 | 12 |
275 6010 | CEMENT TREAT (SUBGRADE) (8") | SY | 56,941.000 | 2.18130 | 2 | ||
275 6011 | CEMENT TREAT(EXIST MATL)(8") | SY | 2,194.000 | 3.00000 | 312,054.000 | 2.05617 | 9 |