AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - TYLER DISTRICT

Last Update: Thursday, July 14, 2022
ITEMS 247 6001 TO 275 6011
ItemsItemsBid Code Range
0100 - 0193
0247 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0712 - 0740
0800 - 0800
1002 - 1002
3000 - 3028
4021 - 4115
5048 - 5048
6000 - 6292
247 6001 - 275 6011
Item NoDescriptionUnitsMarch 31, 2019Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
247 6001FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEHCY  3,414.00062.000001
247 6061FL BS (CMP IN PLC)(TYA GR1-2) (6")SY  166,510.00014.738392
247 6231FL BS (CMP IN PLACE)(TY A GR 1-2)(10")SY  84,275.00020.000001
247 6232FL BS (CMP IN PLACE)(TY A GR 1-2)(11")SY  56,107.00020.500001
247 6233FL BS (CMP IN PLACE)(TY A GR 1-2)(12")SY  67,408.00023.500001
251 6034REWORK BS MTL (TY C) (8") (ORD COMP)SY  116,432.0001.840001
251 6273REWORK BS MTL (TY C)(12")(ORD COMP)SY  12,226.0002.000001
260 6001LIME (HYDRATED LIME (DRY))TON  1,954.000176.096216
260 6002LIME (HYDRATED LIME (SLURRY))TON  525.000215.000001
260 6027LIME TRT (EXST MATL)(8")SY  137,930.0003.681686
275 6001CEMENTTON39.000165.000006,906.000147.9655412
275 6010CEMENT TREAT (SUBGRADE) (8")SY  56,941.0002.181302
275 6011CEMENT TREAT(EXIST MATL)(8")SY2,194.0003.00000312,054.0002.056179