Monthly State Let Construction Report For Tyler District As Of Jul 14, 2017 Page 1 Of 3

Last Update: Monday, July 17, 2017
FTP Icon
page 1 | page 2 | page 3

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyGREGG
HighwayUS 80
FromSL 485, E 1.15 MI
ToLOCKERPLANT RD IN GLADEWATER
CSJ0096-04-066
Proj IDNH 2017(893)
Work TypeGR,BS,HMAC SURF,STRM SWR,C&G,SIGNS
 
0.8373538933.21204379.245.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order05-16-17
Work Began06-20-17
Work Completed
Time Computed00-00-00
Contract Working Days190
Addl Days Granted0
Working Days Charged10
Percent Time Used5
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0096-04-066
ISAACS CONSTRUCTION SERVICES, LLC. (1.24)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.93)
PANOLA SIGN & BARRICADE, INC. (0.40)
MAC TRANSPORTATION, LTD, L.L.P. (1.97)
SOUTHWEST ENVIRONMENT SERVICES LLC (2.04)
STRIPING TECHNOLOGY, L.P. (0.76)
TEXOP CONSTRUCTION (1.84)
Contract #04173030
Totals3538933.21204379.24204379.245.7

CountyHENDERSON
HighwaySH 19
FromFM 1615, SOUTH 3.8 MI
To0.3 MI S OF COON CREEK BRIDGE
CSJ0108-04-037
Proj IDSTP 1702(091)
Work TypeGR,STRS,ACP SURF,FLEX BS,CAM,OCST
 
3.8364949012.530.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-14-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days295
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0108-04-037
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #05173028
Totals4949012.530.000.000.0

CountyANDERSON
HighwaySH 19
From3.6 MI N OF FM 837(HENDERSON C/L),S
To0.4 MI N OF FM 321 AT MONTALBA
CSJ0108-06-051
Proj IDSTP 2013(637)
Work TypeGR,STRS,HMA BS & SURF,OCST,LVL-UP
 
11.81312487715.879003047.0772.0
Work Order07-10-14
Work Began09-02-14
Work Completed
Time Computed07-26-14
Contract Working Days453
Addl Days Granted0
Working Days Charged401
Percent Time Used88
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0108-06-051
COLD CREEK CONSTRUCTION, LTD (0.82)
FORTSON CONTRACTING, INC. (0.45)
HIGHWAY 19 CONSTRUCTION, LLC (10.97)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.35)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.15)
STRIPING TECHNOLOGY, L.P. (1.23)
FARR FOUNDATION, INC. (0.64)
SAN-ANN-CO., INC. (0.04)
MURRAY CONSTRUCTION (0.49)
Contract #05143205
Totals12487715.87367682.599003047.0772.0

CountyVAN ZANDT ETC
HighwaySH 19 ETC
FromRAINS C/L, S
ToUS 80 IN FRUITVALE
CSJ0108-12-017
Proj IDSTP 2017(517)HES
Work TypeMILLED CENTERLINE
 
97.428716585.54202802.8028.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-22-17
Work Began06-05-17
Work Completed
Time Computed00-00-00
Contract Working Days30
Addl Days Granted0
Working Days Charged17
Percent Time Used56
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0108-12-017
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01173219
Totals716585.54202802.80202802.8028.3

CountyANDERSON ETC
HighwayUS 287 ETC
FromFREESTONE C/L SE
To1.7 MI SE OF FM 488 (FREESTONE CL),
CSJ0122-04-038
Proj IDSTP 2017(355)
Work TypeSEAL COAT & PAVEMENT MARKINGS
 
216.06311487064.25766192.596.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-13-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days110
Addl Days Granted0
Working Days Charged29
Percent Time Used26
Contractor(s)
MISSOURI PETROLEUM PRODUCTS COMPANY LLC
SUBCONTRACTOR(S) FOR CCSJ: 0122-04-038
STRIPING TECHNOLOGY, L.P. (12.36)
BRYDL CONTRACTING, INC. (1.55)
Contract #01173005
Totals11487064.25545619.14766192.596.6

CountySMITH
HighwayUS 271
From0.4 MI S OF SS 147 (OAKWOOD ST.)
ToSH 31 (FRONT ST) IN TYLER
CSJ0165-01-102
Proj IDSTP 1702(092)
Work TypePLNG,BS RPR,SEAL,HMAC SURF,PVT MKG
 
1.6322038396.380.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-08-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days45
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0165-01-102
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #05173208
Totals2038396.380.000.000.0

CountyHENDERSON
HighwayUS 175
From0.1 MI SE OF FM 804, SE
ToCR 4712 (END OF C-S)
CSJ0198-01-023
Proj IDNH 1402(195)
Work TypeRECONSTR GR, STRS, BS, SURF & PAV M
 
6.69539261003.8932473695.8982.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-21-14
Work Began04-06-15
Work Completed
Time Computed00-00-00
Contract Working Days605
Addl Days Granted5
Working Days Charged395
Percent Time Used64
Contractor(s)
A. L. HELMCAMP, INC.
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0198-01-023
DUSTIN ALLEN, INC. (0.36)
MURRAY CONSTRUCTION (0.22)
STRIPING TECHNOLOGY, L.P. (0.31)
SAN-ANN-CO., INC. (0.21)
KLP COMMERCIAL, LLC (4.91)
KENSAR LLC DBA S & S TRUCKING (1.88)
BIG CREEK CONSTRUCTION, LTD. (0.00)
ENVIRODREDGE (0.20)
TEXAS ORGANIC ENTERPRISES, LTD (0.07)
Contract #08143055
Totals39261003.89803955.3732473695.8982.7

CountyHENDERSON
HighwayUS 175
From1.1 MI E OF LP 60E @ LARUE, SE
To0.85 MI E OF FM 315, IN POYNOR
CSJ0198-02-027
Proj IDNH 2015(423)
Work TypeRECONSTR GR, STRS, BS, SURF & PAV M
 
4.73137849155.3130610677.9180.8
Work Order06-30-15
Work Began10-06-15
Work Completed
Time Computed07-16-15
Contract Working Days654
Addl Days Granted4
Working Days Charged365
Percent Time Used55
Contractor(s)
SUNDT CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0198-02-027
N-LINE TRAFFIC MAINTENANCE, L.P. (0.20)
WOLFE CONSTRUCTION GROUP, INC. (0.83)
K & S UTILITY CONTRACTORS, INC. (4.02)
OTTO TRUCKING, INC. (3.31)
APAC-TEXAS, INC. (19.01)
BREDA COMPANY, INC. (2.68)
ANTIGO CONSTRUCTION, INC. (0.02)
LAYFIELD CONSTRUCTION, INC (0.40)
A BROTHERS MILLING, LLC (0.18)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.18)
STRIPING TECHNOLOGY, L.P. (0.54)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (1.00)
MCL CONTRACTING, LLC (0.04)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. (1.51)
PRIMATE CONSTRUCTION, INC. (0.00)
CARTHAGE DRILLING, INC. (0.01)
Contract #04153201
Totals37849155.31528222.9830610677.9180.8

CountyHENDERSON
HighwayUS 175
From0.85 MI E OF FM 315, IN POYNOR
ToANDERSON C/L
CSJ0198-02-035
Proj IDC 198-2-35
Work TypeGR,SUB BS,BS,HMAC,DRAIN STRS,SIGNS
 
0.9237052578.983012811.6542.7
CountyANDERSON
HighwayUS 175
From1.9 MI S OF FM 315 (HENDERSON C/L)
To0.5 MI NW OF SH 155 AT FRANKSTON
CSJ0198-03-027
Proj IDNH 1502(561)
Work TypeGR,SUB BS,BS,HMAC,DRAIN STRS,SIGNS
 
3.80420312971.668253918.8240.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-17-16
Work Began05-04-16
Work Completed
Time Computed00-00-00
Contract Working Days571
Addl Days Granted0
Working Days Charged210
Percent Time Used36
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0198-02-035
STRIPING TECHNOLOGY, L.P. (0.36)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.16)
MARCOM"S MOWING SERVICE, LLC (0.21)
FORTSON CONTRACTING, INC. (0.04)
STRIPING SYSTEMS, INC. (0.00)
FARR FOUNDATION, INC. (0.32)
BIG CREEK CONSTRUCTION, LTD. (27.92)
Contract #12153202
Totals27365550.64574493.5511266730.4741.1

CountyCHEROKEE
HighwayUS 69
From2.0 MI N OF FM 1247,NEAR WELLS,S
To0.9 MI S OF FM 1247 (ANGELINA C/L)
CSJ0199-03-028
Proj IDHP 2013(803)
Work TypeGRDG,STRS,BASE,OCST,SURF,PVT MRKG
 
2.89617687832.871368089.007.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-05-16
Work Began01-23-17
Work Completed
Time Computed00-00-00
Contract Working Days350
Addl Days Granted0
Working Days Charged26
Percent Time Used7
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0199-03-028
AMERICAN REMEDIATION OPTIONS, INC. (2.08)
STRIPING TECHNOLOGY, L.P. (0.44)
STRIPING SYSTEMS, INC. (0.00)
TEX OP CONSTRUCTION, LP (1.05)
LUDCO, INC. (1.00)
FLEX SUPPLY, LLC (0.15)
Contract #06163005
Totals17687832.8760619.981368089.007.7

CountySMITH
HighwayFM 1253
FromCR 462(S), 1.3 MI N OF FM 857, S
ToFM 1805
CSJ0203-08-015
Proj IDSTP 1502(278)HES
Work TypeSUBGRADE WIDEN, LEVEL-UP, OCST
 
12.0097499499.386917604.7892.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-10-15
Work Began09-18-15
Work Completed
Time Computed00-00-00
Contract Working Days311
Addl Days Granted0
Working Days Charged277
Percent Time Used89
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0203-08-015
PANOLA SIGN & BARRICADE, INC. (0.62)
STRIPING TECHNOLOGY, L.P. (1.44)
AMERICAN REMEDIATION OPTIONS, INC. (6.84)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.47)
Contract #06153028
Totals7499499.38408420.816917604.7892.2

CountyANDERSON
HighwayUS 79
From1.6 MI SW OF LP 256 IN PALESTINE, S
To0.4 MI SW OF FM 645
CSJ0205-07-043
Proj IDNH 2008(510)
Work TypeGR,BS,ASPH PVT, SIGS, ILLUM,SIGNS
 
8.60141986850.1940886249.0397.3
Work Order10-24-12
Work Began11-12-12
Work Completed
Time Computed11-09-12
Contract Working Days880
Addl Days Granted0
Working Days Charged880
Percent Time Used100
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0205-07-043
HIGHWAY TECHNOLOGIES, INC. (0.10)
STRIPING TECHNOLOGY, L.P. (1.65)
MAC TRANSPORTATION, LTD, L.L.P. (3.12)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (0.39)
AMERICAN REMEDIATION OPTIONS, INC. (0.53)
DANRIDGE CONSTRUCTION, LLC. (0.30)
DUSTROL, INC. (0.20)
WEST TEXAS RUMBLE STRIP (0.05)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.68)
NORTH TEXAS REBAR, LLC (0.02)
TOTAL HIGHWAY MAINTENANCE, LLC (0.23)
P.R. PARKER COMPANY, INC. (0.00)
TEX OP CONSTRUCTION, LP (0.01)
DIRECTIONAL DRILLING (0.01)
DFW REBAR, INC. (0.01)
ROYAL REBAR (0.03)
Contract #09123003
Totals41986850.191006775.5340886249.0397.3

CountyCHEROKEE
HighwayUS 79
From3 MI W OF SH 110, W
To0.3 MI E OF SH 204(DOGWOOD) J'VILLE
CSJ0206-04-039
Proj IDNH 2016(997)
Work TypePLN,CM TRT,BS&SURF,RF RL,MBGF,PV MK
 
3.2585778866.013912720.0167.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order05-19-16
Work Began07-06-16
Work Completed
Time Computed00-00-00
Contract Working Days150
Addl Days Granted0
Working Days Charged143
Percent Time Used95
Contractor(s)
REYNOLDS & KAY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0206-04-039
SOUTHWEST ENVIRONMENT SERVICES LLC (0.40)
ACU CONSTRUCTION LLC (1.75)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.49)
STRIPING TECHNOLOGY, L.P. (2.55)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.23)
ISAACS CONSTRUCTION SERVICES, LLC. (0.43)
TJT CONSTRUCTION (0.38)
TEXOP CONSTRUCTION (0.58)
Contract #04163211
Totals5778866.01324622.703912720.0167.7

CountyRUSK
HighwayUS 79
FromSL 571 IN HENDERSON, SW
ToFM 839
CSJ0206-07-058
Proj IDSTP 1502(281)HES
Work TypeSTRS, WDNG, OCST, ACP, PVT MRKGS
 
3.0506661253.887111272.9999.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-24-15
Work Began01-15-16
Work Completed
Time Computed00-00-00
Contract Working Days263
Addl Days Granted2
Working Days Charged222
Percent Time Used83
Contractor(s)
DREWERY CONSTRUCTION COMPANY, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0206-07-058
J & M CONTRACTING, COMPANY (5.38)
TEXOP CONSTRUCTION (0.67)
PANOLA SIGN & BARRICADE, INC. (0.39)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.50)
STRIPING TECHNOLOGY, L.P. (0.82)
STRIPING SYSTEMS, INC. (0.01)
DREWERY & WHEATON, LLC (1.65)
FREDONIA CONSTRUCTION SERVICES (1.42)
Contract #06153251
Totals6661253.88889573.827111272.9999.9

CountyRUSK
HighwaySH 43
FromUS259/SH64/US79 IN HENDERSON, NE
ToFM 1716/FM 1251
CSJ0207-01-021
Proj IDSTP 2017(357)
Work TypeSURF TRT, ACP SURF, MBGF, PVMT MRKG
 
10.0064670549.69817845.7317.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-24-17
Work Began06-12-17
Work Completed
Time Computed00-00-00
Contract Working Days70
Addl Days Granted0
Working Days Charged18
Percent Time Used25
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0207-01-021
B & E CONSTRUCTION INC. (10.05)
DUSTIN ALLEN, INC. (6.20)
MISSOURI PETROLEUM PRODUCTS COMPANY LLC (15.06)
PANOLA SIGN & BARRICADE, INC. (0.23)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.36)
STRIPE-A-ZONE, INC. (0.54)
STRIPING TECHNOLOGY, L.P. (2.64)
Contract #03173032
Totals4670549.69817845.73817845.7317.5

CountySMITH
HighwaySH 64
From0.677 MI W OF FM 724, E
To0.016 MI W OF SL 323 IN TYLER
CSJ0245-05-047
Proj IDSTP 2017(910)
Work TypePLNG,BS RPR,OCST,PFC SURF,PVT MKG
 
4.1821789204.91270922.8015.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-12-17
Work Began06-27-17
Work Completed
Time Computed00-00-00
Contract Working Days35
Addl Days Granted0
Working Days Charged13
Percent Time Used37
Contractor(s)
IOC COMPANY LLC
SUBCONTRACTOR(S) FOR CCSJ: 0245-05-047
ALTUS TRAFFIC MANAGEMENT LLC (0.31)
DUSTROL, INC. (1.06)
Contract #03173234
Totals1789204.91270922.80270922.8015.1

CountySMITH
HighwaySH 64
FromSL 323 IN TYLER, SE
To1.7 MI SE OF SS 248
CSJ0245-06-081
Proj IDSTP 1702(585)
Work TypePLNG,BS RPR,MEMBRN UNDRSL,SUPER PAV
 
5.3433624096.350.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days40
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0245-06-081
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #07173248
Totals3624096.350.000.000.0

CountyGREGG
HighwayUS 259
FromAT HAWKINS PKWY IN LONGVIEW
To0.6 MI N OF SL 281
CSJ0392-03-047
Proj IDNH 1702(380)
Work TypeCONSTR RTL ON NBL
 
0.450475527.900.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days36
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0392-03-047
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06173210
Totals475527.900.000.000.0

CountyGREGG
HighwaySH 149
FromAT SABINE RIVER #100930039301017
To.
CSJ0393-01-097
Proj IDBR 1502(474)
Work TypeCONC BR RAIL, MBGF, CONC STR RPR
 
0.9413114797.790.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order05-09-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days145
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
GIBSON & ASSOCIATES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0393-01-097
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #04173008
Totals3114797.790.000.000.0

CountySMITH
HighwaySH 31
FromFM 757, E
To2.5 MI W OF FM 2767(NR MULEY BRC),E
CSJ0424-01-048
Proj IDSTP 2013(640)
Work TypeGR,STRS,ACP BS & SURF,PVT MRK
 
10.7347802782.956008744.8777.0
Work Order10-29-14
Work Began11-18-14
Work Completed
Time Computed11-14-14
Contract Working Days328
Addl Days Granted0
Working Days Charged285
Percent Time Used86
Contractor(s)
REYNOLDS & KAY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0424-01-048
SOUTHWEST ENVIRONMENT SERVICES LLC (4.79)
ALTUS TRAFFIC MANAGEMENT LLC (0.48)
STRIPING TECHNOLOGY, L.P. (2.44)
C.S. TREE SERVICE (0.48)
FORTSON CONTRACTING, INC. (0.09)
MURRAY CONSTRUCTION (0.22)
TEX OP CONSTRUCTION, LP (0.79)
J & I TRUCKING CO (1.05)
HOPE SERVICES, INC. (0.70)
HARRIS TRUCKING SERVICES (1.40)
ISAACS CONSTRUCTION SERVICES, LLC. (0.93)
Contract #08143053
Totals7802782.95505092.316008744.8777.0