AVERAGE LOW BID UNIT PRICE - MAINTENANCE - WACO DISTRICT

Last Update: Tuesday, November 4, 2014
ITEMS 500 2001 TO 556 2008
Items Items Bid Code Range
0104 - 0168
0316 - 0361
0401 - 0496
0500 - 0556
0618 - 0690
0712 - 0776
1122 - 1122
3267 - 3271
5369 - 5369
6005 - 6834
7126 - 7602
8094 - 8852
500 2001 - 556 2008
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 1.000 58,000.00000 18.000 42,894.77778 18
500 2007 MOBILIZATION (EMERGENCY) EA 32.000 1,375.06250 56.000 786.10714 6
500 2010 MOBILIZATION (PER CALL OUT) EA 39.000 2,272.06410 308.000 392.29714 9
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     48.000 3,654.06250 13
502 2002 BARR, SIGNS & TRAF HANDLE (TY 1) EA     2.000 1,200.00000 1
512 2093 PORT CBR (DES SOURCE) LF     5,430.000 10.00000 1
512 2094 PORT CBR (MOVE) LF     8,400.000 5.00000 1
512 2095 PORT CBR (STOCKPILE) LF     5,430.000 4.00000 1
514 2004 PERM CONC TRF BARR (SGL SLP) (TY 1) (42" LF     1,808.000 85.00000 1
529 2007 CONC CURB (DOWEL) LF     1,040.000 26.03846 3
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF 30.000 54.39000 50.000 41.43400 2
531 2004 CONC SIDEWALKS (6") SY     40.000 60.00000 1
531 2005 CURB RAMPS (TY 1) EA 2.000 1,658.97000 3.000 1,501.98000 2
531 2006 CURB RAMPS (TY 2) EA 2.000 2,414.97000 3.000 2,045.64667 2
531 2010 CURB RAMPS (TY 7) EA 2.000 1,874.97000 3.000 1,665.64667 2
531 2015 CONC SIDEWALKS (4") SY 60.000 54.39000 100.000 59.03400 2
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     30.000 14.00000 2
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     4,100.000 16.85366 3
540 2005 TERMINAL ANCHOR SECTION EA     10.000 325.00000 2
540 2008 MTL THRIE - BEAM GD FEN ADJUSTMENT LF     225.000 15.00000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     20.000 1,000.00000 1
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     180.000 27.50000 2
540 2019 MTL BEAM GD FEN TRANS (THRIE) (STL POST EA     10.000 1,225.00000 2
542 2001 REMOVING METAL BEAM GUARD FENCE LF     1,000.000 1.00000 2
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     30.000 13.00000 2
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     2.000 200.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     22.000 2,363.63636 2
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     2.000 350.00000 1
544 2013 GDRAIL END TRT (INSTALL) (HBA POST) EA     120.000 1,500.00000 3
544 2015 GDRAIL END TRT (REMOV) (HBA POST) EA     40.000 25.50000 2
545 2001 CRASH CUSH ATTEN (INSTL) EA     4.000 1,500.00000 1
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     3.000 1,800.00000 1
545 2003 CRASH CUSH ATTEN (REMOVE) EA     4.000 400.00000 1
556 2008 PIPE UNDERDRAINS (TY 8) (6") LF     4,229.000 35.00000 1