Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     111.140 2,264.78226 15
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     3.000 2,062.25000 1
100 2006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     4.000 1,680.00000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     6.000 2,624.85000 2
104 2001 REMOVING CONC (PAV) SY     6,060.000 20.07590 2
104 2009 REMOVING CONC (RIPRAP) SY 217.000 20.00000 790.000 14.19747 2
104 2011 REMOVING CONC (MEDIANS) SY     720.000 14.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     113.000 22.11000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     195.000 15.00000 1
104 2021 REMOVING CONC (CURB) LF 3,539.000 2.00000 6,614.000 3.39477 2
104 2022 REMOVING CONC (CURB AND GUTTER) LF     270.000 8.29000 1
104 2027 REMOVING CONC (APPR SLAB) SY     236.000 30.00000 1
104 2044 REMOVING CONC (FLUME) SY     401.000 15.00000 1
105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY     52,192.000 2.01000 1
106 2001 OBLITERATING ABANDONED ROAD STA     6.150 604.00000 1
110 2001 EXCAVATION (ROADWAY) CY 99.000 22.57576 19,406.000 14.90914 20
110 2002 EXCAVATION (CHANNEL) CY 439.000 21.56264 5,260.000 14.23574 12
112 2001 SUBGRADE WIDENING (ORD COMP) STA     1,504.520 456.66161 5
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY 1,247.000 22.70569 66,158.000 16.92944 20
132 2021 EMBANKMENT (VEHICLE) (ORD COMP) (TY C) CY 200.000 20.00000 4,972.000 23.92012 4
134 2001 BACKFILL (TY A) STA     657.750 129.66782 3
134 2002 BACKFILL (TY B) STA     2,244.420 69.82652 5
134 2004 BACKFILL (TY A OR B) STA 506.200 157.65000 2,087.540 112.94302 5
150 2002 BLADING HR 104.000 129.68846 1,004.000 110.13974 33
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     34,192.000 1.44000 1
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY     70.000 89.50000 1
162 2002 BLOCK SODDING SY     70.000 32.50000 1
164 2002 BROADCAST SEED (PERM) (RURAL) (SANDY) AC     .040 10,000.00000 1
164 2004 BROADCAST SEED (PERM) (RURAL) (CLAY) AC     4.000 726.00000 1
164 2010 BROADCAST SEED (TEMP) (WARM) AC     1.010 1,501.38614 2
164 2012 BROADCAST SEED (TEMP) (COOL) AC     1.010 1,501.38614 2
164 2021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY 13,817.000 .56478 126,834.000 .40104 16
164 2022 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) AC 16.970 1,000.00000 16.970 1,000.00000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     306,487.000 .23749 7
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY 3,454.000 .64922 108,335.000 .31949 23
164 2030 CELL FBR MLCH SEED (TEMP) (WARM) AC 4.250 1,000.00000 4.250 1,000.00000 1
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY 3,454.000 .64922 108,335.000 .31473 23
164 2032 CELL FBR MLCH SEED (TEMP) (COOL) AC 4.250 1,000.00000 4.250 1,000.00000 1
168 2001 VEGETATIVE WATERING MG 545.800 33.28435 4,005.700 20.82399 26
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     5,881.000 1.05000 1
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     905.000 3.35050 2
170 2001 IRRIGATION SYSTEM LS     1.000 8,071.00000 1
192 2004 PLANT MATERIAL (5 - GAL) EA     100.000 93.68000 2
192 2006 PLANT MATERIAL (30 - GAL) EA     14.000 210.00000 1
192 2015 LANDSCAPE EDGE LF     432.000 20.00000 1
192 2016 PLANT BED PREPARATION SY     570.000 4.00000 1