AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - YOAKUM DISTRICT

Last Update: Tuesday, May 5, 2015
ITEMS 400 2005 TO 462 2125
Items Items Bid Code Range
0100 - 0192
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0618 - 0677
0752 - 0788
1003 - 1149
2335 - 2335
3267 - 3268
4001 - 4001
5261 - 5369
6001 - 6834
8251 - 8251
400 2005 - 462 2125
464 2001 - 496 2042
Item No Description Units April 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2005 CEM STABIL BKFL CY     2,869.900 117.68960 26
400 2006 CUT & RESTORING PAV SY     541.000 97.48983 5
402 2001 TRENCH EXCAVATION PROTECTION LF     2,461.000 48.66635 4
403 2001 TEMPORARY SPL SHORING SF     7,516.000 19.08316 7
407 2001 SHEET PILING (PZ - 27) SF     11,138.000 31.38467 2
407 2005 SHEET PILING (PZ - 22) SF     3,553.000 44.67802 2
409 2001 PRESTR CONC PIL (16 IN SQ) LF     3,409.000 108.42212 5
409 2002 PRESTR CONC PIL (18 IN SQ) LF     2,688.000 117.28259 4
409 2003 PRESTR CONC PIL (20 IN SQ) LF     5,062.000 119.96642 2
409 2018 PRESTR CONC PIL (24 IN SQ) (HPC) LF     3,878.000 275.00000 1
416 2002 DRILL SHAFT (24 IN) LF     1,392.000 167.10000 5
416 2004 DRILL SHAFT (36 IN) LF     246.000 180.10000 1
420 2001 CL A CONC (MISC) CY     26.000 255.12000 1
420 2003 CL C CONC (ABUT) CY     463.200 929.59434 16
420 2004 CL C CONC (BENT) CY     269.900 1,157.48574 9
420 2007 CL C CONC (CULV) CY     6.000 1,500.00000 1
420 2029 CL S CONC (SLAB) CY     197.500 785.75843 4
420 2031 CL S CONC (SHEAR KEY) CY     28.900 346.50000 1
420 2041 CL C CONC (ABUT) (HPC) CY     32.600 3,500.00000 1
420 2042 CL C CONC (BENT) (HPC) CY     67.800 3,500.00000 1
420 2068 CL S CONC (HPC) (SLAB) CY     311.500 850.00000 1
420 2124 CL S CONC (SLAB) SF     4,512.000 17.35556 3
420 2287 CL S CONC (APPR SLAB) (MOD) CY     304.000 370.00000 1
422 2001 REINF CONC SLAB SF     50,146.000 15.13478 9
423 2005 RETAINING WALL (TEMP WALL) SF     2,571.000 13.00000 1
425 2010 PRESTR CONC BOX BEAM (4B34) LF     268.500 210.65799 1
425 2011 PRESTR CONC BOX BEAM (5B34) LF     358.000 210.65799 1
425 2014 PRESTR CONC SLAB BEAM (4SB12) LF     1,256.000 140.00000 2
425 2015 PRESTR CONC SLAB BEAM (5SB12) LF     887.340 154.59489 2
425 2016 PRESTR CONC SLAB BEAM (4SB15) LF     5,631.360 194.29117 4
425 2017 PRESTR CONC SLAB BEAM (5SB15) LF     2,325.900 208.39546 4
425 2064 PRESTR CONC GIRDER (TX28) LF     3,514.860 142.16755 3
425 2100 PRESTR CONC BOX BEAM (5XB20) LF     981.000 250.00000 1
427 2005 EPOXY PAINT FINISH SF     10.000 700.00000 1
429 2014 CNC STR REP (REMOVE & REPLACE) CF     50.000 250.00000 1
429 6009 CONC STR REPAIR (STANDARD) SF 50.000 40.00000 50.000 40.00000 1
430 2071 CL C CONC FOR EXT STR (HDWL) CY     1.200 2,000.00000 1
432 2001 RIPRAP (CONC) (4 IN) CY     35.000 685.71429 3
432 2002 RIPRAP (CONC) (5 IN) CY     642.900 367.05631 17
432 2016 RIPRAP (STONE COMMON) (DRY) (8 IN) CY     33.000 90.00000 1
432 2019 RIPRAP (STONE PROTECTION) (12 IN) CY     71.000 90.00000 1
432 2033 RIPRAP (STONE COMMON) (DRY) (12 IN) CY     552.000 106.46431 5
432 2039 RIPRAP (MOW STRIP) (4 IN) CY     1,966.000 238.59105 3
432 2041 RIPRAP (STONE COMMON) (DRY) (18 IN) CY     488.000 199.92828 3
432 2050 RIPRAP (CONC) (CL B) (5 IN) CY     31.000 425.00000 1
432 2072 RIPRAP (CONC) (CL B) (RR8 & RR9) CY     120.000 395.00000 1
438 2002 CLEAN AND SEAL EXIST JOINTS LF     1,209.000 33.93052 2
438 2004 CLEAN AND SEAL JOINTS LF     3,757.000 11.13305 3
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 753.000 40.52988 753.000 40.52988 2
438 6005 CLEANING AND SEALING JOINTS LF     2,788.000 11.84500 1
442 2030 STR STL (PEDESTAL) LB     26,288.000 7.25000 1
450 2096 RAIL (TY T201) (MOD) LF     231.000 120.00000 1
450 2146 RAIL (TY T552) LF     772.000 84.09326 4
450 2152 RAIL (TYPE T66) (MOD) LF     398.000 220.00000 1
450 2161 RAIL (TY T223) LF     3,458.000 95.48625 12
450 2206 RAIL (TY T223) (HPC) LF     724.000 130.00000 1
450 2658 RAIL (TY T552) (RETROFIT) LF     495.130 287.10823 2
452 2001 REMOV RAIL (CONC ELEMENTS) LF     629.000 57.85374 2
452 2003 REMOV RAIL (CONC POST & MTL ELEMENTS) LF     100.000 150.00000 1
452 2006 REMOV RAIL (TY T1) LF     545.400 7.02860 2
454 2001 SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF     276.000 67.50000 2
454 2004 ARMOR JOINT LF     453.000 73.44874 9
454 2005 ARMOR JOINT (WITH SEAL) LF     388.000 73.54317 6
454 2007 HEADER TYPE EXPANSION JOINT CF     909.000 266.00000 1
454 2008 JOINT SEALANT LF     4,083.000 5.25000 1
454 6008 HEADER TYPE EXPANSION JOINT CF 39.000 650.00000 39.000 650.00000 1
454 6009 JOINT SEALANT LF 231.000 7.00000 231.000 7.00000 1
460 2001 CMP (GAL STL 12 IN) LF     63.000 70.71825 3
460 2002 CMP (GAL STL 15 IN) LF     4.000 65.00000 1
460 2003 CMP (GAL STL 18 IN) LF     114.000 66.83509 5
460 2004 CMP (GAL STL 24 IN) LF     130.000 60.20923 4
460 2005 CMP (GAL STL 30 IN) LF     325.000 48.50708 3
460 2009 CMP (GAL STL 48 IN) LF     100.000 70.00000 1
460 2015 CMP AR (GAL STL DES 3) LF     64.000 63.43750 2
460 2018 CMP AR (GAL STL DES 6) LF     102.000 143.00000 1
460 2109 CMP AR (GAL STL DES 1) LF     52.000 50.00000 1
462 2001 CONC BOX CULV (3 FT X 2 FT) LF     476.000 311.47103 5
462 2002 CONC BOX CULV (3 FT X 3 FT) LF     64.000 249.37500 2
462 2003 CONC BOX CULV (4 FT X 2 FT) LF     78.000 301.73077 3
462 2004 CONC BOX CULV (4 FT X 3 FT) LF     22.000 400.00000 1
462 2005 CONC BOX CULV (4 FT X 4 FT) LF     114.000 259.64912 2
462 2006 CONC BOX CULV (5 FT X 2 FT) LF     364.000 416.84385 3
462 2007 CONC BOX CULV (5 FT X 3 FT) LF     82.000 389.02439 2
462 2008 CONC BOX CULV (5 FT X 4 FT) LF     16.000 450.00000 1
462 2009 CONC BOX CULV (5 FT X 5 FT) LF     80.000 495.00000 3
462 2011 CONC BOX CULV (6 FT X 4 FT) LF     40.000 475.00000 1
462 2012 CONC BOX CULV (6 FT X 5 FT) LF     40.000 490.00000 1
462 2013 CONC BOX CULV (6 FT X 6 FT) LF     26.000 800.00000 1
462 2015 CONC BOX CULV (7 FT X 4 FT) LF     184.000 420.00000 1
462 2019 CONC BOX CULV (8 FT X 4 FT) LF     99.400 700.00000 1
462 2020 CONC BOX CULV (8 FT X 5 FT) LF     5.000 1,000.00000 1
462 2021 CONC BOX CULV (8 FT X 6 FT) LF     103.000 550.00000 1
462 2022 CONC BOX CULV (8 FT X 7 FT) LF     20.000 700.00000 1
462 2027 CONC BOX CULV (9 FT X 8 FT) LF     154.400 644.00000 1
462 2030 CONC BOX CULV (10 FT X 6 FT) LF     12.000 850.00000 1
462 2031 CONC BOX CULV (10 FT X 7 FT) LF     96.000 780.00000 1
462 2032 CONC BOX CULV (10 FT X 8 FT) LF     64.000 800.00000 1
462 2070 CONC BOX CULV (8 FT X 2 FT) LF     22.000 725.00000 1
462 2098 CONC BOX CULV (11 FT X 6 FT) LF     83.000 750.00000 1
462 2125 CONC BOX CULV (12.25 FT X 7 FT) (SPL) LF     24.000 852.28000 1