Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     4.000 3,205.89000 1
104 2009 REMOVING CONC (RIPRAP) SY     207.600 20.85535 2
104 2022 REMOVING CONC (CURB AND GUTTER) LF     105.000 12.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     31.000 35.00000 1
110 2002 EXCAVATION (CHANNEL) CY     567.000 11.09000 1
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     1,919.000 29.54426 2
134 2002 BACKFILL (TY B) STA     27.220 150.75974 1
134 2004 BACKFILL (TY A OR B) STA     1,163.600 148.88441 2
150 2002 BLADING HR     55.000 145.59818 3
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     31.000 8.46000 1
162 2002 BLOCK SODDING SY     31.000 34.15000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     11,361.000 2.74000 1
168 2001 VEGETATIVE WATERING MG     95.700 9.00993 1